Loading…
Loading…
| # | Company | Amount | Status |
|---|---|---|---|
| 1 | ₹8.3 Laccepted-aoc | ₹8.3 L | accepted-aoc |
Tender Value
Refer Docs
EMD Value
₹20,900
Closing Date
2 Apr 2026, 10:55 pmClosed
Rural Development and Panchayat Raj Department
PACKAGE 02 - Supply of Materials for Various Works under MGNREGA Scheme in Tondikatti and Bijaguppi Villages -WORK CODES- 1504009016/FP/93393042892266915,1504009016/RC/GIS/1097658 & 1504009016/LD/93393042892273796.
RDPR/2025-26/IND13948
RDPR/2025-26/IND13948
Open
RDPR Gram Panchayat Office Tondikatti TP Ramdurg
8 documents required · 8 mandatory
₹500
₹20,900
2 Apr 2026
25 Mar 2026
30 Mar 2026
TONDIKATTI GP-MR9997-100 mm dia M.S pipe hallow-GROUND
TONDIKATTI GP-MR9761-Add sundries charges at 1 Percent on Labour-GROUND
TONDIKATTI GP-MR9757-Transportation or loading and unloading of material or lifting of material or centering charges wherever necessary or Over head or Wastage or Unforeseen charges or Miscellaneous which are necessary during execution.-GROUND
TONDIKATTI GP-MR9684-Water Tanker-GROUND
TONDIKATTI GP-MR9683-Vibratory Roller 8 Tonne-GROUND
TONDIKATTI GP-MR9682-Motor Grader 3.35 meter blade-GROUND
TONDIKATTI GP-MR9681-Wheeled Dozer (D50 BEML)-GROUND
TONDIKATTI GP-MR9600-Laboratory Asst. (SSLC Passed) or Mate or Supervisor-GROUND
TONDIKATTI GP-MR9502-Water-GROUND
TONDIKATTI GP-MR9475-Gravel 2.36 mm or Murrum-GROUND
TONDIKATTI GP-MR9430-Broken granite metal 20 mm-GROUND
TONDIKATTI GP-8-BFT or TA or Mate-GROUND
TONDIKATTI GP-3-Display Board-GROUND
TONDIKATTI GP-10-Miscellaneous or Contingencies charges-GROUND
TONDIKATTI GP-0982-Coarse sand (zone III)-GROUND
TONDIKATTI GP-0367-Portland Cement-GROUND
TONDIKATTI GP-MR9877-Road Roller 8-10 T ( 425Cum or day soil compacted)-ROAD
TONDIKATTI GP-MR9863-Quarry Spalls-ROAD
TONDIKATTI GP-MR9822-Tractor - 40 HP-ROAD
TONDIKATTI GP-MR9762-Add sundries charges at 1 Percent on Material-ROAD
TONDIKATTI GP-MR9528-Rubble stones-ROAD
TONDIKATTI GP-MR9502-Water-ROAD
TONDIKATTI GP-3-Display Board or CIB-ROAD
TONDIKATTI GP-10-Miscellaneous or Contingencies charges-ROAD
TONDIKATTI GP-MR9773-Add watering charges at 1 Percent on Material-COMPOUND
TONDIKATTI GP-MR9762-Add sundries charges at 1 Percent on Material-COMPOUND
TONDIKATTI GP-MR9759-Add providing and removing scaffolding at 3Percent on Labour-COMPOUND
TONDIKATTI GP-MR9757-Transportation or loading and unloading of material or lifting of material or centering charges wherever necessary or Over head or Wastage or Unforeseen charges or Miscellaneous which are necessary during execution.-COMPOUND
TONDIKATTI GP-MR9752-Add Handling , loading and unloading at 1Percent on Material-COMPOUND
TONDIKATTI GP-MR9738-Add Brush, putty, sand paper at 2Percent on cost of paint-COMPOUND
TONDIKATTI GP-MR9690-Painter Class I-COMPOUND
TONDIKATTI GP-MR9678-Mixer (concrete) - 1 cum Capacity-COMPOUND
TONDIKATTI GP-MR9677-Mixer (concrete small used in culvert)-COMPOUND
TONDIKATTI GP-MR9535-Size stone 20 x 20 x 25 cms-COMPOUND
TONDIKATTI GP-MR9433-Broken stone aggregate 40 mm size-COMPOUND
TONDIKATTI GP-MR9432-Broken stone aggregate 20 mm size-COMPOUND
TONDIKATTI GP-MR9431-Broken stone aggregate 12 mm to 10 mm size-COMPOUND
TONDIKATTI GP-MR9426-Boulders-COMPOUND
TONDIKATTI GP-MR9424-Bond stone 20 x 20 x 45 cm-COMPOUND
TONDIKATTI GP-Display Board-COMPOUND
TONDIKATTI GP-Sharpening charges-COMPOUND
TONDIKATTI GP-Miscellaneous or Contingencies charges-COMPOUND
TONDIKATTI GP-Coarse sand (zone III)-COMPOUND
TONDIKATTI GP-water proofing cement paint-COMPOUND
TONDIKATTI GP-Portland Cement-COMPOUND
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
kg-1.pdf
Tender Document • 0.55 MB
Download all tender documents and submit your bid