Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 CrAccepted-AOC NOT SPECIFIED | ₹9.0 Cr | L1 | Accepted-AOC Being lowest and reasonable |
| 2 | L2₹10.3 Cr+₹1.3 Cr (14.4%)Rejected-Finance | ₹10.3 Cr+₹1.3 Cr (14.4%) | L2 | Rejected-Finance Being other than lowest |
| 3 | L3₹12.7 Cr+₹3.7 Cr (41.2%)Rejected-Finance NOT SPECIFIED | ₹12.7 Cr+₹3.7 Cr (41.2%) | L3 | Rejected-Finance Being other than lowest |
| Sl No | Description | Qty | Unit | United Sales Corporation L1 | MANU CREATIONS L3 | M/s JAIMAA ASSOCIATES L2 |
|---|---|---|---|---|---|---|
| 1.00SCHEDULE A PART I (BUILDING WORKS) | ||||||
| 1.01 | Lump sum price worked out by the contractor for Building works as listed in Sch ‘A’ Part I . | 1 | Lump Sum | 70,00,000 ₹70,00,000 Lowest | 72,00,000 ₹72,00,000 | 92,00,000 ₹92,00,000 |
| 2.00SCHEDULE A PART II (INTERNAL WATER SUPPLY) | ||||||
| 2.01 | Lump sum price worked out by the contractor for Building works as listed in Sch ‘A’ Part II. | 1 | Lump Sum | 7,500 ₹7,500 | 6,000 ₹6,000 Lowest | 8,000 ₹8,000 |
| 3.00SCHEDULE A PART III (INTERNAL ELECTRIFICATIONS) | ||||||
| 3.01 | Lump sum price worked out by the contractor for Building works as listed in Sch ‘A’ Part III. | 1 | Lump Sum | 48,037.24 ₹48,037.24 Lowest | 55,000 ₹55,000 | 56,000 ₹56,000 |
| 4.00SCHEDULE A PART IV (EXTERNAL WATER SUPPLY) | ||||||
| 4.01 | Lump sum price worked out by the contractor for Building works as listed in Sch ‘A’ Part IV . | 1 | Lump Sum | 20,00,000 ₹20,00,000 Lowest | 42,00,000 ₹42,00,000 | 23,89,000 ₹23,89,000 |
| 5.00SCHEDULE A PART V (EXTERNAL ELECTRIFICATION) | ||||||
| 5.01 | Lump sum price worked out by the contractor for Building works as listed in Sch ‘A’ Part V | 1 | Lump Sum | 27,50,000 ₹27,50,000 Lowest | 36,50,000 ₹36,50,000 | 36,78,000 ₹36,78,000 |
Tender Value
₹9.5 Cr
EMD Value
₹8.0 L
Closing Date
18 Sept 2025, 6:00 pmClosed
CE (AF) PRAYAGRAJ
Office of Chief Engineer (AF) PRAYAGRAJ, Near bamrouli railway Station Bambrouli PRAYAGRAJ-211012
PROVN OF STP AT AF STN BIHTA
2025_MES_721762_1
958974/E8
Open Tender
Construction Works
Lump-sum
540 days
BIHTA
As per tender documents
9 documents required · 9 mandatory
₹3,000
GE (AF) BIHTA
₹8.0 L
30 Oct 2025
23 Jul 2025
25 Sept 2025
23 Jul 2025
18 Sept 2025
4 Sept 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
BOQ_808114.xls
BOQ • 1.94 MB
176425707.pdf
Tender Documents • 0.70 MB
176425709.html
Tender Documents • 0.07 MB
177294527.pdf
Tender Documents • 0.48 MB
178028286.pdf
Tender Documents • 0.47 MB
179135183.pdf
Tender Documents • 0.47 MB
Drg1.rar
Tender Documents • 5.53 MB
Drg2.rar
Tender Documents • 6.83 MB
TDDrgs2.rar
Tender Documents • 16.00 MB
TDDrgs3.rar
Tender Documents • 9.87 MB
TDsDrgs.rar
Tender Documents • 18.29 MB
tender.pdf
Tender Documents • 1.75 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .