Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.8 LAccepted-AOC AT BONGA ITKHORI CHATRA | CHATRA | JHARKHAND | 825103 | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹15.7 L+₹1.9 L (13.9%)Rejected-Finance PLOT NO 06 GODHANI ROAD WELCOME HOUSING SOCIETY RASHTRASANT NAGAR NAGPUR 440030 | NAGPUR | NAGPUR | MAHARASHTRA | 440030 | L2 | Rejected-Finance Not Being L1 |
Tender Value
₹17.2 L
EMD Value
₹21,550
Closing Date
23 Sept 2022, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Staff Officer (Civil)
Staff Officer (Civil)SECL G.M. Office Bishrampur Area
Platform for Routine Environmental Monitoring of Air sampling stations at Amera OCP, Amgaon OCM, Kumda Sub Area and RGK Sub Area of Bishrampur Area.
2022_SECL_254916_1
GM/BSPR/Civil/e-tender/ 2022-23/19 Dt.01.09.2022
Open Tender
Civil Works - Others
Item Rate
90 days
Bishrampur Area
As Per NIT
3 documents required · 3 mandatory
₹21,550
1 Nov 2022
2 Sept 2022
26 Sept 2022
3 Sept 2022
23 Sept 2022
3 Sept 2022
2 Sept 2022 - 12 Sept 2022
120 days
Amount
Earthwork in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed. All kinds of soil.
Supplying and filling in plinth withlocal available sand under floors including, watering, ramming consolidating and dressing complete.
Providing and laying in possition cement concrete of specified grade excluding the cost of centering and shuttering-All work up to plinth level. 1:4:8(1cement:4 coarse sand:8graded stone aggregate 40mm nominal size
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
Reinforced cement concrete work in walls ( any thickness ), including attached pilasters, buttresses, plinth and string courses, fillets, coloumns, pillars, piers, abutments, posts and struts etc. upto floor five level excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size )
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases up to floor five level excluding the cost of centering, shuttering, finishing and reinforcement with 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size).
Reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete.TMT bars.
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
Providing and fixing on wall face unplasticised Rigid PVC rain water pipes conforming to IS: 13592 Type A including jointing with seal ring conforming to IS: 5382 leaving 10 mm gap for thermal expansion, (i) Single socketed pipes- 75 mm diameter.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Centering and shuttering including strutting, propping etc. and removal of form for : Columns, Pillars, Piers, Abutments, Posts and Struts.
Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform.
Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers.
Centering and shuttering including strutting, propping etc. and removal of form for : edgesOF SLAB
Total impact of GST for the purpose of CTC
ADITYA CONSTRUCTION
stage.html
html • 0.04 MB
techsummary_263558.pdf
PDF • 2.56 MB
finsummary_263558.pdf
PDF • 2.56 MB
AOC19.pdf
PDF • 3.04 MB
BOQ Comparative Chart
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .