| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.9 LAdmitted-Finance | ₹32.9 L | L1 | Admitted-Finance |
| 2 | L2₹34.7 L+₹1.7 L (5.31%)Admitted-Finance 10 1 GROUND FLOOR WEST GHOSH PARA JAGATDAL JAGATDAL JAGATDAL NORTH 24 PARGANAS WEST BENGAL 743125 | 24 PARAGANAS NORTH | WEST BENGAL | 743125 | ₹34.7 L+₹1.7 L (5.31%) | L2 | Admitted-Finance |
| 3 | L3₹36.1 L+₹3.1 L (9.52%)Admitted-Finance 106 1 RAJA RAMMOHAN SARANI KOLKATA 700 009 | KOLKATA | WEST BENGAL | 700009 | ₹36.1 L+₹3.1 L (9.52%) | L3 | Admitted-Finance |
| 4 | L4₹37.2 L+₹4.2 L (12.9%)Admitted-Finance 34 C R AVENUE JABAKUSUM HOUSE 3RD FLOOR ROOM NO 312 KOLKATA 700 012 | KOLKATA | WEST BENGAL | 700012 | ₹37.2 L+₹4.2 L (12.9%) | L4 | Admitted-Finance |
| 5 | L5₹38.1 L+₹5.1 L (15.6%)Admitted-Finance GC ROAD ABDUL LATIF ROAD PO TITAGARH KOLKATA 700119 | 24 PARAGANAS NORTH | WEST BENGAL | 700119 | ₹38.1 L+₹5.1 L (15.6%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | BHASKAR SUPPLY AGENCY L3 | Tirupati Buildcon Pvt. Ltd. L4 | RADHA ENTERPRISE L2 | KWALITY CONSTRUCTION L5 | PUTUL CONSTRUCTION CO. L1 | MASTER BUILDERS L7 | M/s OM HINDUSTAN CONSTRUCTION PVT. LTD. L9 | ARATI TRADING CO L6 | KT CONSTRUCTIONS L8 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Taking down existing roof membrane with concrete padding upto original roof and removing the debris from the site etc complete all as specified and directed | 120 | Sqm | 218 ₹26,160 | 225 ₹27,000 | 210 ₹25,200 | 231 ₹27,720 | 200 ₹24,000 Lowest | 243 ₹29,160 | 254 ₹30,480 | 236 ₹28,320 | 248 ₹29,760 |
| 2.00 | Taking down old crumple treatment (sheet, filler board etc) and removing the debris from the site complete all as specified and directed | 60 | Sqm | 109 ₹6,540 | 112 ₹6,720 | 105 ₹6,300 | 115 ₹6,900 | 100 ₹6,000 Lowest | 121 ₹7,260 | 126 ₹7,560 | 117 ₹7,020 | 123 ₹7,380 |
| 3.00 | Demolition of cement concrete (Un-reinforced) in ground floor and paving nexc 15cm thick above or below GL complete all as specified and directed | 9.25 | Cum | 1,070 ₹9,897.5 | 1,102 ₹10,193.5 | 1,029 ₹9,518.25 | 1,130 ₹10,452.5 | 980 ₹9,065 Lowest | 1,188 ₹10,989 | 1,242 ₹11,488.5 | 1,153 ₹10,665.25 | 1,212 ₹11,211 |
| 4.00 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc. laid bedded and pointed in mortar complete all as specified and directed. | 1.2 | X Sqm | 709 ₹850.8 | 730 ₹876 | 682 ₹818.4 | 748 ₹897.6 | 650 ₹780 Lowest | 786 ₹943.2 | 822 ₹986.4 | 763 ₹915.6 | 802 ₹962.4 |
| 5.00 | Dismentalling floors hearth or wall tilling including cement mortor bedding (but not backing) removing serviceble tiles to store and rubbish off the premises complete all as specified and directed | 100 | Sqm | 87 ₹8,700 | 90 ₹9,000 | 84 ₹8,400 | 92 ₹9,200 | 80 ₹8,000 Lowest | 97 ₹9,700 | 101 ₹10,100 | 94 ₹9,400 | 99 ₹9,900 |
| 6.00 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 2 | Cum | 709 ₹1,418 | 730 ₹1,460 | 682 ₹1,364 | 748 ₹1,496 | 650 ₹1,300 Lowest | 786 ₹1,572 | 822 ₹1,644 | 763 ₹1,526 | 802 ₹1,604 |
| 7.00 | Taking down cement plaster of any description on brick work or stone msonary wall including racking out joints hacking for key scrubbing down with water etc. complete all as specified and directed | 315 | Sqm | 99 ₹31,185 | 102 ₹32,130 | 95 ₹29,925 | 105 ₹33,075 | 85 ₹26,775 Lowest | 110 ₹34,650 | 115 ₹36,225 | 107 ₹33,705 | 112 ₹35,280 |
| 8.00 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as directed and directed | 1 | Cum | 1,420 ₹1,420 | 1,463 ₹1,463 | 1,365 ₹1,365 | 1,500 ₹1,500 | 1,300 ₹1,300 Lowest | 1,576 ₹1,576 | 1,648 ₹1,648 | 1,530 ₹1,530 | 1,608 ₹1,608 |
| 9.00 | Taking down chowkhats or frames with shutters (without taking off shutter from frames) of any sizes nexc 1.5 Sqm complete all as specified and directed. | 30 | Each | 311 ₹9,330 | 320 ₹9,600 | 299 ₹8,970 | 328 ₹9,840 | 285 ₹8,550 Lowest | 345 ₹10,350 | 361 ₹10,830 | 335 ₹10,050 | 352 ₹10,560 |
| 10.00 | All as item No. 09.00 mentioned here-in-before but exc 1.5 Sqm and nexc 4.0 Sqm each. | 12 | Each | 405 ₹4,860 | 417 ₹5,004 | 389 ₹4,668 | 427 ₹5,124 | 370 ₹4,440 Lowest | 449 ₹5,388 | 469 ₹5,628 | 436 ₹5,232 | 458 ₹5,496 |
Tender Value
₹29.9 L
EMD Value
₹59,840
Closing Date
21 Aug 2026, 6:00 pmClosed
SHRI RAKESH KUMAR
GARRISON ENGINEER (CENTRAL) KOLKATA NAPIER ROAD HASTINGS 700022
REPAIR TO LEAKAGE / SEEPAGE, ROOF TREATMENT, PLASTERING, BRICKWORK, FLOORING, PLUBMING, INTERNAL WATER SUPPLY, SANITARY FITTINGS, JOINERY, ATT, PERIODICAL SERVICES AND CERTAIN MISC REPAIR ETC TO OR MD ACCN AT BMC UNDER GE C) KOLKATA
2026_MES_782360_1
8962/E8
Open Tender
Miscellaneous Works
Item Rate
270 days
Kolkata
AS PER TENDER DOCUMENTS
7 documents required · 7 mandatory
₹500
GE(CENTRAL) KOLKATA
₹59,840
Yes
1 Sept 2026
1 Aug 2026
22 Aug 2026
1 Aug 2026
21 Aug 2026
16 Aug 2026
1 Aug 2026 - 15 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Taking down existing roof membrane with concrete padding upto original roof and removing the debris from the site etc complete all as specified and directed | 120 | Sqm | - | - |
| 2 | Taking down old crumple treatment (sheet, filler board etc) and removing the debris from the site complete all as specified and directed | 60 | Sqm | - | - |
| 3 | Demolition of cement concrete (Un-reinforced) in ground floor and paving nexc 15cm thick above or below GL complete all as specified and directed | 9.25 | Cum | - | - |
| 4 | Demolition of stone slabs and tiles of any description or thickness in floors, aprons etc. laid bedded and pointed in mortar complete all as specified and directed. | 1.2 | X Sqm | - | - |
| 5 | Dismentalling floors hearth or wall tilling including cement mortor bedding (but not backing) removing serviceble tiles to store and rubbish off the premises complete all as specified and directed | 100 | Sqm | - | - |
| 6 | Demolition of brick work or stone masonary built in cement mortor including all quoins & jambs etc. complete all as specified and directed | 2 | Cum | - | - |
| 7 | Taking down cement plaster of any description on brick work or stone msonary wall including racking out joints hacking for key scrubbing down with water etc. complete all as specified and directed | 315 | Sqm | - | - |
| 8 | Demolition of reinforced cement concrete of any description and in any position not otherwise specifically provided for complete all as directed and directed | 1 | Cum | - | - |
| 9 | Taking down chowkhats or frames with shutters (without taking off shutter from frames) of any sizes nexc 1.5 Sqm complete all as specified and directed. | 30 | Each | - | - |
| 10 | All as item No. 09.00 mentioned here-in-before but exc 1.5 Sqm and nexc 4.0 Sqm each. | 12 | Each | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
TENDER8962.pdf
Tender Documents • 1.39 MB
BOQ_876485.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .