Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.4 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L₹4.8 LRejected-Finance | L | Rejected-Finance reject |
Tender Value
₹4.2 L
EMD Value
₹8,000
Closing Date
15 Jun 2020, 5:00 pmClosed
Executive Engineer
Provincial Division, PWD B and R Br., Fatehabad
Special Repair of Mamupur to Churpur via Narail and Link Road to Govt. School Mamupur in Fatehabad Distt.
2020_HRY_130940_1
PWD/FTB/Special Repair of Mamupur to Churpur via N
Open Tender
Civil Works
Item Wise
60 days
Fatehabad
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
E.E. Provl. Divn. PWD B and R Br., Fatehabad
₹8,000
Yes
23 Jul 2020
6 Jun 2020
15 Jun 2020
6 Jun 2020
15 Jun 2020
6 Jun 2020
Amount
Preparation of berms including filling of Earth work, excavation and cutting of earth in all kind of soils including dressing the bank, side slope to given levels and templates after breaking of clouds, including the cost of rolling and watering all allowances for labour hardness wetness irrespective of all lead and lift, but including Compensation for earth taken from private land, fields etc. and compacted to meet requirement of table 300-2 of MoRT&H specification clause No. 305 and to the entire satisfaction of the Engineer of the work conforming to PWD specification No. 6.2 and 6.3 and 3.2 and the other specification 1990 Ist edition. As per X-section attached at DNIT at Section -9. Note:-No earth work will be allowed to be taken from PWD B&R/ ROW except for surplus earth after approval from Engineer.
Dismantling Brick Work, Tile Masonry or Tile Lining and Tile Terracing (HSR 8.5 (i) dry brick work.
Milling of distress bituminous layer upto 20mm depth in a single pass with suitable milling machine (capable of milling @ 200-300 sqm area per Hr.) fitted with loading conveyor for loading the milled material directly on the trucks i/c hauling and stock piling the reclaimed material near the central recycling plant or reclaiming to bring to required specification to reuse with the approval of Engineer-in-Charge for safe disposal with all leads and lifts complete in all respects. Note I:- The unutilized quantity of reclaimed bituminous mix material shall be a recovery item as mention in BOQ item No. ____.
Providing & laying 75 mm thick (Compacted) stone metal (G-II) 53mm to 22.4mm gauge wearing coat to water bound macadam in layer of 75mm using screening type ‘B’ compacting with 3 wheeled steel roller/vibratory roller to achieve the desire density including lighting, guarding barricading and maintenance of diversion etc. as per clause No.404 of MoRT&H specifications for road & bridge (5th Revision) of 2013 as per drawing and design directed by the Engineer complete in all respects.(N.S.) Note: - 1.Only crushed stone metal material should be used. No local earth/ natural occurring sand shall be used. The material finer than 425 micron shall have zero Plasticity Index (PI). 2. Materials to be used and operations of manufacturing shall be approved by the engineer.
Providing and laying first coat surface dressing, including rolling with road roller etc. complete including cost of bitumen VG-10 grade using aggregate 13mm nominal size 1.00 cum and bitumen VG-10, 0.10 MT per hundred square metre. Clause 509 of MoRT&H specification.(5th edition ) 2013 (NS).
Providing and laying tack coat with bitumen VG-10 grade pressure distributor at the rate of 0.30 kg. per sqm. On the prepared bitumen/granular surface cleaned with mechanical broom including cost of bitumen as per clause No.503 (5th edition) 2013 as per MoRT&H specification (N.S.)
Providing and laying 20mm thick premix carpet (PC) excluding cost of tack coat, with mixed material brought from Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified value of compaction and direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect. i/c cost of Bitumen VG-10 grade as per clause 510 MoRT&H specification (5th edition) 2013 (NS). Note:- Before carrying out bituminous work, coating & Stripping of bitumen aggregate mix is to be performed in accordance with IS-6241. If coating and stripping of bitumen aggregate mix is less than 95%, anti-stripping agent will be used by contractor. The anti-stripping agent should conform to the requirement as stipulated in IS 14982:2017. The cost so incurred will be considered as incidental to work and noting extra shall be payable. The type and brand of anti-stripping agent along with procedure shall be approved by SE-in-Charge in writing before start of work. A proper record of results be maintained and same shall be submitted along with bills by the contractor. Note:-Before laying PC on existing black top all cracks shall be sealed as MoRT&H specification (5th edition) clause No. 3004.3. which may consists of (i) Fog seal/ or (ii) crack filling and or (iii) patch work repair as required at site in accordance with clause No. 3004.3.2 and 3004.3.3 of MoRT&H specification (5th edition) 2013 respectively. Proper measurement and consumption shall be entered in MB for fog seal/or crack filling/ or patch work but no payment on this account shall be made as fog seal/or crack filling/ or patch work is/are incidental to work.
Providing and laying ‘B’ type seal coat with VG-10 grade bitumen excluding cost of tack coat, with mixed material brought from Hot mix plant and laying with paver finisher and compacting with road roller to achieve specified/desirable value of compaction as per direction of Engineer including cost of lighting arrangement, sign board and night watch, complete in all respect as per clause 511 and 510.1.3 of MoRT&H specification (5th edition) 2013 (NS).
Providing & fixing public information board consisting of 75 mm GI Pipe of size 2.45 m x 1.15 m with 900 mm x 900 mm GI sheet 16 gauge connected/ welded with 5 mm thick steel plate of 50 mm duly painted as per column mentioned in the Drawing and fixing at site in 60 x 60 x 75 cm cement concrete 1:2:4 block complete in all respect.
Recovery items: The rates quoted against recovery items will not be included in the total amount rather it will be deducted while calculating financial statement of the agency. Material obtained from dismantling of existing brick work, bituminous layer have been calculated taking assumption that 80% of theoretical material will be retrieved. The dismantled material can used in any of the item for the work after modification (bringing it to required specifications) after approval from employer. In case it is not possible to use this material on the work, the agency can take away this material. This material can be taken away by the agency at the price quoted by the agency but minimum price to be quoted is limited to reserve price as fixed and mentioned as under :- i) Good Bricks @ Rs. 4.50/ each
ii) Bricks Bats @ Rs. 500/- P. Cum
ii) Bitummenous Mix Material @ Rs. 1320/- P. Cum Note: All quantities of the above materials have been worked out on the basis of theoretical quantities laid on this road. However, agency may visit site before quoting rates and assess the extent of retrieved material. There shall be no measurement after actual dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of quoted rate and quantity exhibited in the BOQ shall be made. The reserve rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below the reserve price will be entertained and reserve price will be considered for all purposes in case the agency quotes lesser than reserve price.
Lawat Construction Company
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .