| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹94.0 LAccepted-AOC VILLAGE POST PATHOLI AGRA UTTAR PRADESH INDIA | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹1.2 Cr+₹14.4 L (13.6%)Rejected-Finance 77 KAILASH PURI BIKANER RAJASTHAN PIN 334001 | BIKANER | RAJASTHAN | 334001 | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹1.2 Cr+₹15.0 L (14.2%)Rejected-Finance | L3 | Rejected-Finance Being L3 | |
| 4 | L4₹1.3 Cr+₹19.6 L (18.5%)Rejected-Finance M 78 GARU HARKISHAN NAGAR PASCHIM VIHAR NEW DELHI 110087 | NEW DELHI | WEST DELHI | DELHI | 110087 | L4 | Rejected-Finance Being L4 | |
| 5 | L5₹1.3 Cr+₹23.7 L (22.4%)Rejected-Finance | L5 | Rejected-Finance Being L5 |
| Sl No | Description | Qty | Unit | ABHOG INFRASTRUCTURE PRIVATE LIMITED L2 | C P Singh and Co L1 | M/s JAIMAA ASSOCIATES L6 | M/S Anil Enterprises L7 | M/S Royal Enterprises L3 | M/S RAJESH KUMAR & SONS L5 | SALUJA CONSTRUCTION CO L4 |
|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavating in trenches not exc 1.5 metre wide and not exc 1.5 metre in depth for foundation etc or for laying of cables, pipes etc and getting out in soft/loose soil complete all as specified. | 2,775 | Cum | 150 ₹4,16,250 | 125 ₹3,46,875 | 180 ₹4,99,500 | 150 ₹4,16,250 | 150 ₹4,16,250 | 100 ₹2,77,500 Lowest | 120 ₹3,33,000 |
| 2.00 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick in soft/loose soil. | 2,255 | Cum | 50 ₹1,12,750 | 71 ₹1,60,105 | 40 ₹90,200 | 45 ₹1,01,475 | 30 ₹67,650 Lowest | 50 ₹1,12,750 | 60 ₹1,35,300 |
| 3.00 | Removal of excavated soil/ material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified. | 520 | Cum | 60 ₹31,200 | 80 ₹41,600 | 40 ₹20,800 | 55 ₹28,600 | 30 ₹15,600 Lowest | 50 ₹26,000 | 50 ₹26,000 |
| 4.00 | Taking up or down GI/PVC tubing and connections of 15 mm bore, fixed in walls, ceiling, floors, trenches etc. all as directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of BOQ | 1,700 | RM | 8 ₹13,600 | 4 ₹6,800 Lowest | 20 ₹34,000 | 25 ₹42,500 | 10 ₹17,000 | 5 ₹8,500 | 12 ₹20,400 |
| 5.00 | Taking up or down GI/PVC tubing and connections of 20 mm bore, fixed in walls, ceiling, floors, trenches etc. all as directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of BOQ | 5,100 | RM | 9 ₹45,900 | 5 ₹25,500 Lowest | 20 ₹1,02,000 | 30 ₹1,53,000 | 10 ₹51,000 | 5 ₹25,500 Lowest | 15 ₹76,500 |
| 6.00 | Taking up or down GI tubing and connections of 25 mm bore, fixed in walls, ceiling, floors, trenches etc. all as directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of BOQ. | 900 | RM | 10 ₹9,000 | 6 ₹5,400 | 30 ₹27,000 | 35 ₹31,500 | 10 ₹9,000 | 5 ₹4,500 Lowest | 20 ₹18,000 |
| 7.00 | Taking up or down GI tubing and connections of 40 mm bore, fixed in walls, ceiling, floors, trenches etc. all as directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of BOQ. | 1,800 | RM | 11 ₹19,800 | 7 ₹12,600 Lowest | 40 ₹72,000 | 45 ₹81,000 | 10 ₹18,000 | 8 ₹14,400 | 22 ₹39,600 |
| 8.00 | Taking up GI water mains 50mm bore including fittings with spigot & socket ends of lead/tyton joints including burning out lead joints and recovering lead complete all as specified and directed. | 3,500 | RM | 11 ₹38,500 | 8 ₹28,000 Lowest | 40 ₹1,40,000 | 65 ₹2,27,500 | 10 ₹35,000 | 10 ₹35,000 | 25 ₹87,500 |
| 9.00 | Taking up GI water mains 80 mm bore including all fittings with spigot & socket ends of lead/ tyton joints including out lead joints and recovering lead complete all as specified and as directed. | 3,150 | RM | 15 ₹47,250 | 10 ₹31,500 Lowest | 40 ₹1,26,000 | 100 ₹3,15,000 | 10 ₹31,500 Lowest | 15 ₹47,250 | 30 ₹94,500 |
| 10.00 | Taking GI water mains 100 mm bore including all fittings with spigot & socket ends of lead/ tyton joints including out lead joints and recovering lead complete all as specified and as directed. | 1,735 | RM | 15 ₹26,025 Lowest | 15 ₹26,025 Lowest | 40 ₹69,400 | 110 ₹1,90,850 | 20 ₹34,700 | 20 ₹34,700 | 35 ₹60,725 |
Tender Value
₹1.3 Cr
EMD Value
₹2.1 L
Closing Date
20 Jun 2026, 6:00 pmClosed
COMMANDER WORKS ENGINEER
HQ CWE HISAR HISAR MIL STN HISAR
SPL REPAIR REPLACEMENT OF OLD UNSV RUSTED GI CI PIPE LINE AND CONNECTED ITEMS AT ITARANA ALWAR MIL STN
2026_MES_767255_1
CWE/HSR/ALW/T-12 OF 2026-27
Open Tender
Civil Works
Item Rate
270 days
ALWAR
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,000
GE ALWAR
₹2.1 L
14 Jul 2026
22 May 2026
22 Jun 2026
22 May 2026
20 Jun 2026
13 Jun 2026
23 May 2026 - 30 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating in trenches not exc 1.5 metre wide and not exc 1.5 metre in depth for foundation etc or for laying of cables, pipes etc and getting out in soft/loose soil complete all as specified. | 2,775 | Cum | - | - |
| 2 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exc 25 cm thick in soft/loose soil. | 2,255 | Cum | - | - |
| 3 | Removal of excavated soil/ material to a distance not exc 50 metre and depositing where directed at a level not exc 1.50 metre above the starting point complete all as specified. | 520 | Cum | - | - |
| 4 | Taking up or down GI/PVC tubing and connections of 15 mm bore, fixed in walls, ceiling, floors, trenches etc. all as directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of BOQ | 1,700 | RM | - | - |
| 5 | Taking up or down GI/PVC tubing and connections of 20 mm bore, fixed in walls, ceiling, floors, trenches etc. all as directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of BOQ | 5,100 | RM | - | - |
| 6 | Taking up or down GI tubing and connections of 25 mm bore, fixed in walls, ceiling, floors, trenches etc. all as directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of BOQ. | 900 | RM | - | - |
| 7 | Taking up or down GI tubing and connections of 40 mm bore, fixed in walls, ceiling, floors, trenches etc. all as directed.
Note :- Excavation & earthwork shall be measured & paid for separately under relevant items of BOQ. | 1,800 | RM | - | - |
| 8 | Taking up GI water mains 50mm bore including fittings with spigot & socket ends of lead/tyton joints including burning out lead joints and recovering lead complete all as specified and directed. | 3,500 | RM | - | - |
| 9 | Taking up GI water mains 80 mm bore including all fittings with spigot & socket ends of lead/ tyton joints including out lead joints and recovering lead complete all as specified and as directed. | 3,150 | RM | - | - |
| 10 | Taking GI water mains 100 mm bore including all fittings with spigot & socket ends of lead/ tyton joints including out lead joints and recovering lead complete all as specified and as directed. | 1,735 | RM | - | - |
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.16 MB
BOQ_859266.xls
BOQ • 2.51 MB
8868tender.pdf
Tender Documents • 1.01 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .