| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAdmitted-Finance 304 MAGIZHAMPOO STREET GOMATHIPURAM 6TH MAIN ROAD MADURAI 21 | MADURAI | TAMIL NADU | 625001 | ₹1.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.2 Cr+₹3.1 L (2.81%)Admitted-Finance HIG 25 80 FEET ROAD ARINGAR ANNA NAGAR MADURAI 625 020 | MADURAI | TAMIL NADU | 625020 | ₹1.2 Cr+₹3.1 L (2.81%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/s. LUCKY ASSOCIATES L1 | Suganya Constructions L2 |
|---|---|---|---|---|---|
| 1.00Strengthening and Black Topping of Perumalkovilpatty Road - Parapatty Road KM 0/0-1/340 ( R216 ) VPR | |||||
| 2.00Clearingthe Scrub jungle including all labour charges for burrying and burning etc., | |||||
| 3.00 | KM 0/0-1/430 | 2,077.45 | m2 | 4.1 ₹8,517.55 Lowest | 5 ₹10,387.25 |
| 4.00Earthwork excavating & depositing on bank with Carted earth Depth 5.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers | |||||
| 5.00 | KM 0/0-1/430 | 914.5 | m3 | 118.02 ₹1,07,929.29 Lowest | 119 ₹1,08,825.5 |
| 6.00Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete. | |||||
| 7.00 | KM 0/0-1/0 | 267.76 | m3 | 388.25 ₹1,03,957.82 Lowest | 400 ₹1,07,104 |
| 8.00 | KM 1/0-1/430 | 91.8 | m3 | 388.25 ₹35,641.35 Lowest | 400 ₹36,720 |
| 9.00Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) . | |||||
| 10.00 | KM 1/0-1/430 | 240.98 | m3 | 1,273.12 ₹3,06,796.46 Lowest | 1,500 ₹3,61,470 |
Tender Value
Refer Docs
EMD Value
₹1.1 L
Closing Date
29 Jan 2021, 3:00 pmClosed
ADDITIONAL COLLECTOR DRDA MADURAI -20
DRDA MADURAI -20
MADURAI DISTRICT STRENGTHENING AND BLACK TOPPING OF 2 NOS OF ROAD IN THIRUMANGALAM BLOCK AT MADURAI DISTRICT UNDER SCPAR 2020 21 PACKAGE NO 06
2021_RDTN_192246_1
d13/2322/2020/MDU/tmg06
Open Tender
Civil Works
Item Rate
180 days
THIRUMANGLAM
Refer Tender document
4 documents required · 4 mandatory
₹0
₹1.1 L
15 Jun 2022
25 Jan 2021
29 Jan 2021
26 Jan 2021
29 Jan 2021
27 Jan 2021
Amount
Strengthening and Black Topping of Perumalkovilpatty Road - Parapatty Road KM 0/0-1/340 ( R216 ) VPR
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earthwork excavating & depositing on bank with Carted earth Depth 5.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying open graded premix carpet of 20 mm compacted thick using 0.18cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.6 Kg of bitumen for 10 sqm of premix carpet including laying of seal coat type ‘A’ over the premix carpet using 0.09 cum of 6.7mm IRC size HBG machine crushed chips with 9.8 Kg of bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MoRT&H specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80 – 100 KN capacity and all other tools and plants employed therefore etc., complete.
Supply and fixing of KM stone SI No. 44 A
Supply and fixing of HM stone SI No. 44 A
Construction of 2.00 x 3.00m Span Culvert @95m
Earthwork excavation in all classes of soils such as gravelly soils, hard stiffclay, and earth mixed silt or other loose soils sandy loam and ordinary soil but including depositing on banks with all leads and lifts including all charges etc complete.
Supplying and filling of filling sand for foundation from approved quarry including cost and conveyance to work site and as directed by the dept officers etc complete.
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Centering and shuttering for RCC works in Plain surfaces including all cost and conveyance of all materials using mild steel angles of 25mm x 25mm x 3mm with 10 gauge
Below GL
Above GL
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Supplying and Fabricating and placing in position MS steel or Ribbed Tor Steel for all Reinforced Cement Concrete works as per the design given including cost of steel and binding wire in all floors etc, Complete complying with stanard specification.(MS
Reinforcement cement concrete 1:1.5:3 mix using 20mm graded HBG metal including all cost and conveyance of materials and labour charges etc., complete
Supply and fixing of Bitumenpad Inculding all Charges Etc.Complete
Supply and fixing of 75 mm PVC Pipe for Wheep Holes
Providing and laying of US Gravel between Abutment for Approaches culvert including cost and conveynce etc
Construction of Retaining Wall @105m
Earthwork excavation in all classes of soils such as gravelly soils, hard stiffclay, and earth mixed silt or other loose soils sandy loam and ordinary soil but including depositing on banks with all leads and lifts including all charges etc complete.
Supplying and filling of filling sand for foundation from approved quarry including cost and conveyance to work site and as directed by the dept officers etc complete.
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Provision for Weep holes 63mm PVC Pipe
Construction of Retaining Wall @365m
Earthwork excavation in all classes of soils such as gravelly soils, hard stiffclay, and earth mixed silt or other loose soils sandy loam and ordinary soil but including depositing on banks with all leads and lifts including all charges etc complete.
Supplying and filling of filling sand for foundation from approved quarry including cost and conveyance to work site and as directed by the dept officers etc complete.
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Provision for Weep holes 63mm PVC Pipe
Construction of Retaining Wall @480m
Earthwork excavation in all classes of soils such as gravelly soils, hard stiffclay, and earth mixed silt or other loose soils sandy loam and ordinary soil but including depositing on banks with all leads and lifts including all charges etc complete.
Supplying and filling of filling sand for foundation from approved quarry including cost and conveyance to work site and as directed by the dept officers etc complete.
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Provision for Weep holes 63mm PVC Pipe
Construction of Retaining Wall @753m
Earthwork excavation in all classes of soils such as gravelly soils, hard stiffclay, and earth mixed silt or other loose soils sandy loam and ordinary soil but including depositing on banks with all leads and lifts including all charges etc complete.
Supplying and filling of filling sand for foundation from approved quarry including cost and conveyance to work site and as directed by the dept officers etc complete.
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Provision for Weep holes 63mm PVC Pipe
Construction of Retaining Wall @788m
Earthwork excavation in all classes of soils such as gravelly soils, hard stiffclay, and earth mixed silt or other loose soils sandy loam and ordinary soil but including depositing on banks with all leads and lifts including all charges etc complete.
Supplying and filling of filling sand for foundation from approved quarry including cost and conveyance to work site and as directed by the dept officers etc complete.
Cement Concrete 1:4:8 mix (one cement, four sand, eight hard broken stone) using 40mm ISS HBG stone jelly for Foundation and flooring including labour charges for mixing concrete watring and laying the concrete complying with standard specifications etc complete.
Towards the centring charges for Drainage works., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m2
Cement concrete 1 : 3 : 6 mix using 40mm HBG metal for foundation including watering wherever necessary and laid in layers of not more than 15cm thick., compacting etc., complete complying with standard specifications and as directed. - Rate for 10 m3
Provision for Weep holes 63mm PVC Pipe
Provision for Name board Charges etc Complete
Provision for Sign Board Charges
Strengthening and Black Topping of Maravankulam VRMPNagar Road KM 0/0-0/500 ( R206 ) VPR
Clearingthe Scrub jungle including all labour charges for burrying and burning etc.,
Earthwork excavating & depositing on bank with Carted earth Depth 3.00KM in hard stiff clay, stiff black cotton, hard red earth, shales, murrum, gravel, stoney earth and earth mixed with small size boulders SS 20 A including laying and spreading in layers
Construction of subgrade for 300mm depth by using picked material obtained from the existing surface by mechanical means and then adding 50% of defict materials by using granite waste obtained from industries with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.( subgrade using copper slag to improve CBR 7 to 9))
Providing and Laying US gravel to compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction at optimum moisture content and hire & fuel charges for power roller , water sprinkler and all other incidental charges such as traffic barricading and providing danger lights etc, complete.
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying PRIMECOAT over WMB/ WMM surface at 7.00Kg of SS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Applying TACK COAT over Primed WBM surface at 2.5Kg of RS-1 Bitumen Emulsion / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp.
Providing and laying open graded premix carpet of 20 mm compacted thick using 0.18cum of 13.20 mm IRC size HBG machine crushed chips and 0.09 cum of 11.20 mm IRC HBG machine crushed chips with 14.6 Kg of bitumen for 10 sqm of premix carpet including laying of seal coat type ‘A’ over the premix carpet using 0.09 cum of 6.7mm IRC size HBG machine crushed chips with 9.8 Kg of bitumen per 10 sqm including cost and conveyance of chips and stacking them to departmental gauge for pre-measurements including cost of bitumen which will be supplied by the department at departmental section stores and its cost will be recovered as per special condition appended including heating the bitumen and metal mixing the materials in mini hot mix plant for premix carpet including spreading the same and finishing and compacting the same by power rolling to the specified lines and grades including all labour charges application of bitumen for seal coat over the premix carpet and spreading the seal coat and power roller rolling seperately as per MoRT&H specification 509 and 513 (III revision) including all labour charges hire and fuel charges for mini hot mix plant power roller 80 – 100 KN capacity and all other tools and plants employed therefore etc., complete.
Supply and fixing of HM stone SI No. 44 A
Provision for Name board Charges etc Complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Suganya Constructions
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .