Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹17.7 CrAccepted-AOC 1391 SECTOR 57 PART II 122003 | GURUGRAM | HARYANA | 122003 | ₹17.7 Cr | 1 | Accepted-AOC Lowest |
| 2 | 2₹19.4 CrRejected-Finance N A | ₹19.4 Cr | 2 | Rejected-Finance L2 |
| 3 | 3₹19.4 CrRejected-Finance DLG 13 14 PUSHPA COMPLEX HISAR HISAR 125001 | HISAR | HISAR | HARYANA | 125001 | ₹19.4 Cr | 3 | Rejected-Finance L3 |
| 4 | 4₹19.9 CrRejected-Finance 14 CHAHAR CONSTRUCTION CO ADARSH NAGAR NEAR ROHILLA COMMUNICATION 124103 | JHAJJAR | HARYANA | 124103 | ₹19.9 Cr | 4 | Rejected-Finance L4 |
| 5 | 5₹21.7 CrRejected-Finance MD22 ELDECO MENSIONZ SOHNA ROAD NEAR FAZILPUR CHOCK GURGAON FF 19 OMAXE GURGAON MALL SOHNA ROAD GURUGRAM 2021R5777 | GURUGRAM | GURUGRAM | HARYANA | ₹21.7 Cr | 5 | Rejected-Finance L5 |
| Sl No | Description | Qty | Unit | Bansal Construction Co, Gurgaon L4 | Chahar Construction Co L6 | HARYANA BUILDERS L5 | ROHTASH KUMAR CONTRACTOR L2 | The Tibba Dana Sher Co Op L and C Society Limited L3 | JS SYNERGIES PRIVATE LIMITED L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Providing lowering cutting jointing and testing RCC pipe class NP 4 as per 18-458-2003 with spigot and socketed joints manufactured with ISi marked sulphate resistance cement as per ISi 12330 with rubber rings ISi marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required
jointing with rubber rings in trenches and jointing with 1 :3/2 cement sand mortar and with end dowels filled with 1 :3/2. cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No . 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects 2000 mm dia | 250 | Per Metre | 21,000 ₹52.5 L | 24,800 ₹62 L | 26,000 ₹65 L | 12,000 ₹30 L | 25,000 ₹62.5 L | 17,745 ₹44.4 L |
| 2.00 | Recovery- Credit of Steel reinforcement
for R.C.C. work recovered from exsiting drain available at site, where not included in the complete rate of RCC dismantle, Complete as per Engineer in charge. The Quantites of the above material have been worked out on the basis of theoretical quantities laid on this road.However agency may visit before quoting rates and asses the extent of retrieved material. There shall be no measurement after actual scarifying / dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of qouted rate and quantity exhibited in the BOQ shall be made. The reverse rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below reserve price will be considered for all purpose in case the agency qoutes lesser than reserve price. | 1,40,890 | Per Kg. | 8 -₹11,27,120 | - | 20 -₹28,17,800 | 10 -₹14,08,900 | 20 -₹28,17,800 | 33 -₹46,49,370 |
| 3.00 | Providing and fixing of Pre-casted RCC M-30 grade cover slab minimum size 1.0 x 1.0 x 0.15 mtr with 13.59 kg steel bar of 12mm/10mm and 2 nos plastic bowls and heavy iron hooks including loading unloading labour carriage and material complete all respect. | 56 | Each | 4,500 ₹2.5 L | 2,350 ₹1.3 L | 16,000 ₹9.0 L | 14,000 ₹7.8 L | 15,000 ₹8.4 L | 2,055 ₹1.2 L |
Tender Value
₹20.2 Cr
EMD Value
₹40.4 L
Closing Date
8 Dec 2025, 5:00 pmClosed
VIKRAM SINGH
Storm Water Drainage
Construction of Master storm water drain size 2x 4.50 x 2.50 Mtr of total length 1400 Mtr
2025_HRY_483618_1
2025F8DF60B7 FB9B 409C A9AD 67DA31FB5457717001
Open Tender
Civil Works
365 days
Gurugram
2 documents required · 2 mandatory
₹1,180
₹40.4 L
Yes
6 May 2026
15 Nov 2025
9 Dec 2025
15 Nov 2025
8 Dec 2025
15 Nov 2025
Providing lowering cutting jointing and testing RCC pipe class NP 4 as per 18-458-2003 with spigot and socketed joints manufactured with ISi marked sulphate resistance cement as per ISi 12330 with rubber rings ISi marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1 :3/2 cement sand mortar and with end dowels filled with 1 :3/2. cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No . 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects 2000 mm dia
Recovery- Credit of Steel reinforcement for R.C.C. work recovered from exsiting drain available at site, where not included in the complete rate of RCC dismantle, Complete as per Engineer in charge. The Quantites of the above material have been worked out on the basis of theoretical quantities laid on this road.However agency may visit before quoting rates and asses the extent of retrieved material. There shall be no measurement after actual scarifying / dismantling and if material after dismantling is found on lesser side, no claim of agency on this score will be entertained and full recovery on the basis of qouted rate and quantity exhibited in the BOQ shall be made. The reverse rates are minimum rates to be used as base for quoting purchase rate by the agency. No rates below reserve price will be considered for all purpose in case the agency qoutes lesser than reserve price.
Providing and fixing of Pre-casted RCC M-30 grade cover slab minimum size 1.0 x 1.0 x 0.15 mtr with 13.59 kg steel bar of 12mm/10mm and 2 nos plastic bowls and heavy iron hooks including loading unloading labour carriage and material complete all respect.
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[21.28]Providing and fixing steel bar embedded plastic steps of size 263mm x 165mm of orange colour, confirming to specification in pump chambers, manholes etc., having minimum 3mm thick polypropylene polymer confirming to is:10910 encapsulated on 12mm dia ribbed steel bars per IS :1786. The rate include cost of setting the same to correct lines and levels duly embedded in 1:2:4 cement concrete including carriage, loading, uploading, stacking, handling, re-handling etc., complete in all respect to the satisfaction of Engineer-in-charge [Through Rate]
[33.12]Supplying, filling, spreading and levelling stone boulders of size range 5 cm to 20 cm, in recharge pit, in the required thickness, for all leads and lifts, all complete as per direction of Engineer-in-charge. [Through Rate]
[34.40]Portable Barricade in Construction Zone Installation of a steel portable barricade with horizontal rail 300 mm wide, 2.5 m in length fitted on a A frame made with 45 x 45 x 5 mm angle iron section, 1.5 m in height, horizontal rail painted (2 coats) with yellow and white stripes, 150 mm in width at an angle of 450, A frame painted with 2 coats of yellow paint, complete as per IRC:SP:55-2001 [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.32]Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m. [Through Rate]
[5.15.1]Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of: 1. G.S. Sheet [Through Rate]
[5.26]Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to a lead of 1 kilometre, stacking serviceable and unserviceable material separately including cutting reinforcement bars. [Through Rate]
[5.33]Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc. including dismembering and stacking within 50 metres lead. [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.1.6]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 6. 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) [Through Rate]
[6.26.1]Extra for providing richer mixes up to plinth and at all floor levels. 1. Providing M-30 grade concrete instead of M-25 grade BMC/ RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) [Through Rate]
[6.28.1]Providing and laying in position ready mixed M-25 grade concrete for reinforced cement concrete work, using fly ash and cement content as per approved design mix, and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for reinforced cement concrete work, including pumping of R.M.C. from transit mixer to site of laying, excluding the cost of centering, shuttering, finishing and reinforcement, including cost of admixtures in recommended proportions as per IS : 9103 to accelerate / retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer - in - charge. 1. All works up to Plinth level. [Through Rate]
[6.30.2]Centering and shuttering including strutting, propping etc. and removal of form for 2. Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. [Through Rate]
[6.30.3]Centering and shuttering including strutting, propping etc. and removal of form for 3. Suspended floors, roofs, landings, balconies and access platform [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[7.20.1]Brick work with common burnt clay modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.90 MB
BOQ_561623.xls
BOQ • 0.30 MB
AD0141212.pdf
Additional Documents • 5.10 MB
OT0141212.pdf
Other Document • 0.32 MB
Download all tender documents and submit your bid