| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.0 CrAccepted-AOC | ₹3.0 Cr | 1 | Accepted-AOC L1 |
| 2 | 2₹3.1 Cr+₹15.0 L (5.05%)Rejected-AOC | ₹3.1 Cr+₹15.0 L (5.05%) | 2 | Rejected-AOC L2 |
Tender Value
₹3.5 Cr
EMD Value
₹7 L
Closing Date
29 Feb 2024, 9:30 amClosed
OFFICE OF THE SUPERINTENDING ENGINEER IVth CIRCLE
OFFICE OF THE SUPERINTENDING ENGINEER IVth CIRCLE
LOT- 03 Restoration work and demarcation of canal land of Barwar Canal under the jurisdiction of Jhansi Division Betwa Canal, Jhansi in District-Jhansi.
2024_UPIDC_883130_9
05/SE-IV/2023-24
Open Tender
Civil Works
Item Rate
270 days
Garautha
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,130
₹7 L
11 Mar 2024
22 Feb 2024
29 Feb 2024
22 Feb 2024
29 Feb 2024
22 Feb 2024
Amount
Dismantling lime or plain cement concrete as direction fully satisfaction of engineer in charge.
Preparation of sub grade excluding cost of earth work as direction fully satisfaction of engineer in charge.
Excavation of foundation in in Mar, Rankar and kankar mixed soils including lift up to 1.5 meter and lead upto 30 meter including filling, watering , ramming , of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30 meter from the foundation trenches as direction fully satisfaction of engineer in charge.
Centring and shuttring for CC works including all cost of material labour T&P complete required for propar completion of work as direction fully satisfaction of engineer in charge.
Laying of M-10 (1:3:6)cement concrete with stone grit with Mechenical mixing & vibration,curing including all cost of material labour T&P etc complete the work as direction fully satisfaction of engineer in charge.
Laying of M-15 (1:2:4)cement concrete with stone grit with Mechenical mixing & vibration,curing including all cost of material labour T&P etc complete the work as direction fully satisfaction of engineer in charge.
S/ Laying L.D.P.E. 200 micron thick polythine sheet below C.C.Lining as direction fully satisfaction of engineer in charge.
Filling bitumin sealing compound for every groove 14x27mm i/c all cost of labour, material and T&P etc. complete as direction fully satisfaction of engineer in charge.
Laying of C.C. M-20 (1:1.5:3) with all labour, material T&P etc complete the work as direction fully satisfaction of engineer in charge.
S/L khanda stone masonary work in 1:4 C.M.I/C cost of all material labour & T&P etc per cum
Centring and shuttering for R.C.C. work including all cost of material labour T&P complete required for propar completion of work as direction fully satisfaction of engineer in charge.
Laying of R.C.C. M-20 (1:1.5:3) with well graded stone grit with manual mixing all labour, material T&P etc complete the work as direction fully satisfaction of engineer in charge.
Cutting,bending,binding placing in position of steel Reinforcement with binding wire and cost of steel with all labour, Taxes, T&P etc. complete required for proper completion of work as direction fully satisfaction of engineer in charge.
Laying sand i/c all labour, material and T&P etc. complete as direction fully satisfaction of engineer in charge.
S/ Laying first class brick work in 1:4 cement morter i/c all labour T&P etc complete as direction fully satisfaction of engineer in charge.
S/ Laying 12.5 mm thick 1:4 cement plaster on brick work i/c all labour T&P etc complete as direction fully satisfaction of engineer in charge.
S/ Laying 12.5 mm thick 1:4 cement plaster on khanda masonary work i/c all labour T&P etc complete as direction fully satisfaction of engineer in charge.
S/ Laying 1:3 cement pointing raised on stone masonary work i/c all labour T&P etc complete as direction fully satisfaction of engineer in charge.
S/Fixing of wheel guard stone size 0.2x0.2x0.75m of C.C. M-20 I/C all labour T&P etc complete as direction fully satisfaction of engineer in charge.
Dry Stone boulder pitching 25-50 Kg weight stone boulder including all cost of material labour T&P etc as direction fully satisfaction of engineer in charge.
Laying and fixing with 1:3 Cement and coarse sand mortar of Hume pipe in proper complete as per direction of Engineer-in-charge.
Painting on pucca works surface Finishing walls with water proofing cement paint of approved make and quality on new work with two coat to give an even shade. Including supply of all material labour T&P etc.required for proper completion of the work as as direction fully satisfaction of engineer in charge.
Supply and fixing of sign board including labour,materials and all T&P with cutting, welding where necessary for proper complition of work as direction fully satisfaction of engineer in charge.
Supplying and fixing of boundary piller i/c cost of all material labour t&p etc as direction fully satisfaction of engineer in charge.
Cutting heavy under growth and bushes up to 7.5 cm diameter including removal of roots with collection and removal as direction fully satisfaction of engineer in charge.
Earth work in Mar, Rankar and kankar mixed soils in embankment including lead up to 595 M and beyond and lift up to 1.5 M. including dressing making profile and manual compaction but excluding mechanical compaction as direction fully satisfaction of engineer in charge.
Earth work in Mar, Rankar and kankar mixed soils in digging including lead up to 30 M. and lift up to 1.5 M. including dressing making profile and manual compaction but excluding mechanical compaction as direction fully satisfaction of engineer in charge.
M/S ANAND TRADERS
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .