| 1 | 1₹6.3 LAccepted-AOC | ₹6.3 L Quoted ₹6.1 L | 1 | Accepted-AOC L1 |
| 2 | 2₹6.4 LRejected-AOC 11 17A 4 MADILINE OPPOSITE SALEM CAMP PO METTUR DAM 636 456 | METTUR DAM | SALEM | TAMIL NADU | 636456 | ₹6.4 L | 2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | MaharajaEngineeringContractor L1 | LENIN ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Charges for arresting the coal pipe firmly, dismantling of Victaulic coupling and lowering down the mill outlet elbows to 4.5 m. floor including charges for scaffolding. | 4 | Nos | 3,690 ₹14,760 Lowest | 3,900 ₹15,600 |
| 2.00 | Charges for dismantling of mill outlet elbows and changing the deflector block if any lifting the elbows and assembling with proper alignment with the existing pipe line and removing coal pipe supports and devolution of scraps to stores. | 4 | Nos | 3,690 ₹14,760 Lowest | 3,900 ₹15,600 |
| 3.00 | Charges for dismantling the Spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures including transportation of supporting material from stores to site and re-fixing the Spool piece, MPO bodies and transition pieces and assembling to its original position and carrying out necessary related works and devolution of scraps to stores et., for a mill. | 1 | Mill | 24,500 ₹24,500 Lowest | 26,000 ₹26,000 |
| 4.00 | Charges for Dismantling of separator body top along with classifier assembly and reassembling the separator body top as per direction of engineer in charge. This includes making the fixture for lifting arrangements, lead, lift retaping and cleaning the threaded holes in the flange etc. | 1 | Mill | 88,000 ₹88,000 Lowest | 92,000 ₹92,000 |
| 5.00 | Charges for Dismantling of bowl hub with bowl from the vertical shaft and assembling new bowl and bowl hub as per the direction of engineer in charge. This includes making necessary fixture and supporting for lifting arrangements and lead, lift and transporting of materials from stores, reaming of holes in the bowl and bowl hub etc. | 1 | Mill | 79,000 ₹79,000 Lowest | 83,000 ₹83,000 |
| 6.00 | Charges for gas heating the bowl and bowl hub assembly using cutting set in order to expand the bowl hub for releasing it from the vertical shaft and also providing ice bag in the vertical shaft above the upper radial bearing to cool the shaft portion. | 1 | Mill | 2,800 ₹2,800 Lowest | 2,950 ₹2,950 |
| 7.00 | Charges for dismantling the triangular liners, cutting the bulged Mill bottom plate, applying refractory cement at the Mill bottom plate 1 set by providing bolts and welding. | 1 | Mill | 31,500 ₹31,500 Lowest | 33,000 ₹33,000 |
| 8.00 | Charges for cleaning the gearbox internals like worm shaft and worm wheel. Draining the cooling water from cooling coil, cleaning and inspection of worm wheel teeth, cleaning the cooling coil and reconditioning the coil. Arresting the leakages in the water line, assembling back the cooling coil covers, filling the gearbox oil up to normal level. | 1 | Mill | 20,500 ₹20,500 Lowest | 21,500 ₹21,500 |
| 9.00 | Charges for removing the old coupling halves from the motor and worm shaft ends. The charges includes gas heating the new/old coupling halves in the motor shaft and worm shaft and assembling the new/ old coupling in motor shaft and worm shaft. | 1 | Mill | 29,900 ₹29,900 Lowest | 31,500 ₹31,500 |
| 10.00 | Charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing and reassembling the new / old radial bearing in the new/old radial bearing housing and assembling the new/old pump hub and bushing. | 1 | Mill | 13,600 ₹13,600 Lowest | 14,500 ₹14,500 |
Tender Value
Refer Docs
EMD Value
₹6,800
Closing Date
16 Feb 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I Mill Plant Unit IV Complete dismantling and assembling of Mill internals reconditioning renewal of worn out parts bearings replacement of worn out worm wheel with worm shaft and renewal of worm gear hub etc in any one mill from 4A to 4F
2026_EB_648899_1
CE / MTPS-I / SE / M-I / MP /OT.450/ 2025-26
Open Tender
Power/Energy Projects/Products
Works
30 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹6,800
Yes
18 Jul 2026
2 Feb 2026
17 Feb 2026
2 Feb 2026
16 Feb 2026
2 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for arresting the coal pipe firmly, dismantling of Victaulic coupling and lowering down the mill outlet elbows to 4.5 m. floor including charges for scaffolding. | 4 | Nos | - | - |
| 2 | Charges for dismantling of mill outlet elbows and changing the deflector block if any lifting the elbows and assembling with proper alignment with the existing pipe line and removing coal pipe supports and devolution of scraps to stores. | 4 | Nos | - | - |
| 3 | Charges for dismantling the Spool pieces, multiple port outlet bodies and transition pipes 4 Nos. each after assembling the coal pipe inspection with center feed pipe structures including transportation of supporting material from stores to site and re-fixing the Spool piece, MPO bodies and transition pieces and assembling to its original position and carrying out necessary related works and devolution of scraps to stores et., for a mill. | 1 | Mill | - | - |
| 4 | Charges for Dismantling of separator body top along with classifier assembly and reassembling the separator body top as per direction of engineer in charge. This includes making the fixture for lifting arrangements, lead, lift retaping and cleaning the threaded holes in the flange etc. | 1 | Mill | - | - |
| 5 | Charges for Dismantling of bowl hub with bowl from the vertical shaft and assembling new bowl and bowl hub as per the direction of engineer in charge. This includes making necessary fixture and supporting for lifting arrangements and lead, lift and transporting of materials from stores, reaming of holes in the bowl and bowl hub etc. | 1 | Mill | - | - |
| 6 | Charges for gas heating the bowl and bowl hub assembly using cutting set in order to expand the bowl hub for releasing it from the vertical shaft and also providing ice bag in the vertical shaft above the upper radial bearing to cool the shaft portion. | 1 | Mill | - | - |
| 7 | Charges for dismantling the triangular liners, cutting the bulged Mill bottom plate, applying refractory cement at the Mill bottom plate 1 set by providing bolts and welding. | 1 | Mill | - | - |
| 8 | Charges for cleaning the gearbox internals like worm shaft and worm wheel. Draining the cooling water from cooling coil, cleaning and inspection of worm wheel teeth, cleaning the cooling coil and reconditioning the coil. Arresting the leakages in the water line, assembling back the cooling coil covers, filling the gearbox oil up to normal level. | 1 | Mill | - | - |
| 9 | Charges for removing the old coupling halves from the motor and worm shaft ends. The charges includes gas heating the new/old coupling halves in the motor shaft and worm shaft and assembling the new/ old coupling in motor shaft and worm shaft. | 1 | Mill | - | - |
| 10 | Charges for dismantling the radial bearing after removing the oil pump hub and oil pump bushing and reassembling the new / old radial bearing in the new/old radial bearing housing and assembling the new/old pump hub and bushing. | 1 | Mill | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.74 MB
BOQ_777912.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].