Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹50.8 LAccepted-Finance | ₹50.8 L | L1 | Accepted-Finance ACCEPTED |
| 2 | L2₹50.9 L+₹10,188 (0.20%)Accepted-Finance 728 K M ROYCHAWDHURY ROAD P O DAKSHIN JAGADDAL P S SONARPUR KOLKATA 700151 | KOLKATA | 24 PARAGANAS SOUTH | WEST BENGAL | 700151 | ₹50.9 L+₹10,188 (0.20%) | L2 | Accepted-Finance ACCEPTED |
| 3 | L3₹51.2 L+₹33,110.99 (0.65%)Rejected-Finance 5743 BAGUINARA ROAD BURIBATTALA SUBHASGRAM SOUTH 24 PARGANA KOLKATA 700147 | KOLKATA | SOUTH 24 PARGANA | WEST BENGAL | 700147 | ₹51.2 L+₹33,110.99 (0.65%) | L3 | Rejected-Finance REJECTED |
Tender Value
₹50.9 L
EMD Value
₹1.0 L
Closing Date
25 Jun 2026, 2:00 pmClosed
EXECUTIVE ENGINEER KOLKATA SOUTH I DIVISION, HOUSI
84, IBRAHIMPUR ROAD, KOLKATA 700032
Renovation and repairing works for outside structural repair, rendering plaster and painting the same of Blocks- C, G and H-03 nos. Ordinary Two Roomed and blocks-A, B, D, E and F-05 nos. Std. Two Roomed, Total 8 nos. blocks at RHE Ashoke Avenue
2026_HSD_1027035_1
WBHOUSING/EE/KS ID/e-NIT01/2026-27
Open Tender
CIVIL WORKS
Percentage
180 days
RHE ASHOKE AVENUE
Please refer Tender documents.
4 documents required · 4 mandatory
₹1.0 L
2 Jul 2026
8 Jun 2026
29 Jun 2026
10 Jun 2026
25 Jun 2026
10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | - | Sq.M. | 19 | - |
| 2 | Cleaning the concrete surface by removing dirt and debris, marking defective locations and removing loose concrete..etc. | - | Sq.M. | 90 | - |
| 3 | Dismantling R.C. floor, roof, beams etc. including cutting rods and removing rubbish..etc. Ground Floor | 1 | Cum | 1,956 | ₹1,954.04 |
| 3.01 | 1st Floor | 1 | Cum | 2,006 | ₹2,003.99 |
| 3.02 | 2nd Floor | 1 | Cum | 2,056 | ₹2,053.94 |
| 3.03 | 3rd Floor | 1 | Cum | 2,106 | ₹2,103.89 |
| 4 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks..etc. (a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge. Ground Floor | - | Sq.M. | 335 | - |
| 4.01 | 1st Floor | - | Sq.M. | 353 | - |
| 4.02 | 2nd Floor | - | Sq.M. | 371 | - |
| 4.03 | 3rd Floor | - | Sq.M. | 389 | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
2911.pdf
Tender Documents • 0.56 MB
BOQ_2522870.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .