Loading…
Loading…
Tender Value
₹4.0 Cr
EMD Value
₹7.9 L
Closing Date
6 Aug 2026, 5:00 pm
Superintending Engineer, PC II, WBSRDA
JOINT ADMINISTRATIVE BUILDING (6TH FLOOR) BLOCK-HC/7, SECTOR-III, SALT LAKE CITY, KOLKATA-700106
MRL09-DAKSHIN DURGAPUR TO DEULBARI PURBA UNDER KULTALI BLOCK ( Length 4.403 Km )
2026_WBSRD_148621_12
08/SRDA/N-1/2026-27/02
Open Tender
Civil Works - Roads
365 days
SOUTH24PARGANAS
AS PER NIT AND SBD
6 documents required · 6 mandatory
₹5,000
₹7.9 L
KOLKATA
14 Jul 2026
14 Jul 2026
7 Aug 2026
14 Jul 2026
6 Aug 2026
14 Jul 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Cost for Construction of PAVEMENT WORKS | 1 | Nos. | 2,09,07,703 | ₹2,09,07,703 |
| 2 | Cost for Construction of PROTECTION WORKS | 1 | Nos. | 59,58,731 | ₹59,58,731 |
| 3 | Cost for Construction of CROSS DRAINAGE WORKS | 1 | Nos. | 10,83,806 | ₹10,83,806 |
| 4 | Cost for Construction of ROAD FURNITURE WORKS | 1 | Nos. | 1,07,569 | ₹1,07,569 |
| 5 | Cost for Construction of ROAD SAFETY WORKS | 1 | Nos. | 18,54,913 | ₹18,54,913 |
| 6 | Cost for Construction of DRAINAGE WORKS | 1 | Nos. | 4,57,287 | ₹4,57,287 |
| 7 | Add @ 18% GST on Cost of Construction | 1 | Nos. | 1 | ₹1 |
| 8 | Add @ 1% Labour Welfare CESS on Cost of Construction | 1 | Nos. | 1 | ₹1 |
| 9 | 1st Year Routine Maintenance | 1 | Nos. | 12,000 | ₹12,000 |
| 10 | 2nd Year Routine Maintenance | 1 | Nos. | 84,814 | ₹84,814 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 0.06 MB
Tendernotice_2.pdf
PDF • 1.61 MB
Tendernotice_3.pdf
PDF • 0.67 MB
CHECKLIST.xls
Tender Documents • 0.05 MB
SOQWB02819.pdf
Tender Documents • 6.11 MB
BOQ_233379.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid