Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
| 2 | Admitted-Fee/PreQual/Technical | Admitted-Fee/PreQual/Technical |
Tender Value
₹1.0 L
Closing Date
10 Aug 2026, 6:55 pmClosed
Executive Engineer Machinery Division Kmr
Executive Engineer Machinery Division Kmr
Civil Work required for Supply, Installation, Testing and Commissioning of 20 KVA DG Set for Executive Engineer quarter (Snow Clearance ) at MHED Shalteng, Srinagar.
2026_PWDJK_318664_1
MDSK/TS/2026-27/20 dt-30.07.2026
Open Tender
Civil Works
Percentage
30 days
Shalteng
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
11 Aug 2026
30 Jul 2026
11 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by manual means over areas (exceeding 30 cm in
depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. | 2.6 | Cum | 592 | ₹1,539.2 |
| 2 | Providing & laying of stone soling. | 2 | Cum | 1,050 | ₹2,100 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:4:8 for mudmat. | 0.52 | Cum | 5,200 | ₹2,704 |
| 4 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. 1:3:6. | 0.85 | Cum | 5,733.6 | ₹4,873.56 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. 5.1.2 1:1½:3 | 2.5 | Cum | 7,275 | ₹18,187.5 |
| 6 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level
5.22.1 Mild steel and medium tensile steel bars | 110 | Kgs | 115 | ₹12,650 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for: 5.9.1 Foundations, footings, bases of columns etc. for mass concrete. | 14.7 | Sqm. | 286 | ₹4,204.2 |
| 8 | Rain Shed/ cover | - | - | - | - |
| 9 | Fabrication of rain shed/ cover forDG setby wayof providing and fitting of mild steel work for MS pipe posts of50 mm dia, MS base plate of 8mm thickness, ISA 35x 35x 5 mm or higher for truss work, purlin work using rectangular pipe 40x 25 mm and anchor bolts; complete job. | 325 | Kgs | 115 | ₹37,375 |
| 10 | Providing corrugated G. S. sheet roofing including vertical/curved surface
fixed with polymer coated J or L hooks, bolts and nuts 8mm diameter with
bitumen and G.I limpet washers or with G.I. limpet washers filled with
white lead, including a coat of approved steel primer and two coats of
approved paint on overlapping of sheets complete (upto any pitch in
horizontal/vertical or curved surface)excluding the cost of purlins, rafters
and trusses and including cutting to size and shape wherever required. 0.5 mm thick | 9 | Sqm. | 852 | ₹7,668 |
stage.html
html • 0.02 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
BOQ_1051617.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .