| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹77.4 LAccepted-AOC | L1 | Accepted-AOC Being lowest bidder | |
| 2 | L2₹86.5 L+₹8.7 L (11.2%)Rejected-Finance | L2 | Rejected-Finance Not Lowest Bidder | |
| 3 | L3₹88.0 L+₹10.2 L (13.2%)Rejected-Finance 306 SHIV BARI MARG PANCHVATI NAGAR BATHINDA 151001 PB | BATHINDA | BATHINDA | PUNJAB | 151001 | L3 | Rejected-Finance Not Lowest Bidder |
Tender Value
₹90 L
EMD Value
₹1.6 L
Closing Date
6 Jul 2020, 6:00 pmClosed
CWE Bathinda
HQ CWE Bathinda, Bathinda Military Station
CA NO CWE BTD 24 of 2020-21 COMPREHENSIVE MAINTENANCE WORK AND MANNING AND OPERATION OF CENTRAL AC PLANTS AT AT VARIOUS LOCATIONS UNDER GE(U) BATHINDA AT BATHINDA MIL STN
2020_MES_348513_1
CA NO CWE BTD 24 of 2020-21
Open Tender
Miscellaneous Works
Item Rate
330 days
Bathinda Mil Station
As per NIT
7 documents required · 7 mandatory
₹1,000
GE Utility Bathinda
₹1.6 L
Yes
13 Jul 2020
30 May 2020
8 Jul 2020
30 May 2020
6 Jul 2020
24 Jun 2020
30 May 2020 - 10 Jun 2020
Amount
Part-I : COMPREHENSIVE MAINTENANCE WORKS :
M&L for Annual comprehensive maint, Preventive and routine maint of 03 Nos chilling plants Make : M/s Voltas of reciprocating compressor, 3x40 TR each, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel at WEU unit complete all as directed to entire satisfaction of Engineer-in-charge with requirements/ conditions as stated here- in- after ( Work lies in Unrestricted area):-
M&L for Annual comprehensive maint, Preventive and routine maint of following chilling machines 3 Nos Chilling Machines Make : M/s Voltas of screw type compressor, 3x25 TR each, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel at SIU unit complete all as directed to entire satisfaction of Engineer-in-charge with following requirements / conditions and for following items / equipments ( Work lies in Unrestricted area):-
Notes for item Nos 01 and 02:- (a) The 03 (Three) preventive / periodical maint services and 01 (one) annual comprehensive maint service to each chiller machines of Make : M/s Voltas of reciprocating and screw type compressor, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel during the currency of the contract shall be carried out by the rep of M/S Voltas Ltd and its cost shall be included in unit quoted rate. Nothing extra shall be admissible in this account at a later date. The contractor shall submit the record of periodical/preventive/Annual maint services carried out by M/s Voltas along with documentary evidence for claiming payment. In this respect please refer schedule 'A' Note 25 on page 15(R) of tender documents. (b) The cost of refrigerant & compressor oil, as and when required to be replaced / replenished during the entire contract period is deemed to be included in the quoted rates and no extra cost shall be paid to the contractor in this effect. (c) The repair / replacement cost (M&L) of all defective parts / spares, as and when required, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect at any stage. (d) During entire contract period, any defective component(s) and/or any other materials which is not specified /given in BOQ, but essential to be repaired/ replaced, to make plant(s)/machine(s) fully functional, the cost of the same is deemed to be included in unit quoted rates. Rates are deemed in quoted rates for painting work of plants and panel board. (e) Descaling of condensors/ chemical cleaning of evaporator coils once a year. (f) Annual pumping down and restarting of the plant as and when required.
Notes for item Nos 01 and 02 (Contd..):- (g) The entire work as mentioned in srl item no 01 and 02, shall be got executed through OEM i.e. M/s Voltas Ltd only. The contractor shall submit the orignal copy of MOU with OEM i.e. M/s Voltas Ltd, within fifteen days of acceptance of tender, failing which the contract shall be cancelled under condition 54 of IAFW 2249 and the contractor shall be liable for forefeit the performance security amount. (h) The chiller machines alongwith connected items will be handed over to contractor in running condition, but with fair wear & tear which can be meet out through annual comprehensive maint. Hence, the bidder is advised to visit the site to assess the quantum of work to be carried out in this contract and quote thier rates accordingly and no claim in this effect will be admitted at a later stage. (j) All the complaint / faults will be addressed within 30 min from the time of receipt of complaint. If, contractor or his tradesmen fails to attend the complaint within 30 min from the time of receipt of complaint, the compensation/penalty of Rs. 500.00 (Rupees Five Hundred only) per complaint per hr for first 04 hrs and after that Rs. 1000.00 (Rupees One Thousand only) per complaint per hr shall be recovered from the contractor’s dues. (k) The cost of transportation (to and fro) and other necessary equipment shall be arranged / brought by contractor to complete the job and no extra cost shall be paid to the contractor in this effect.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at 40 Ton Central AC Plant Room at WEU, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments ( Work lies in Unrestricted area):-
Preventive and routine maintenance of Condensing pump set (03 Nos) comprise of electric motor of capacity 7.5 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 20.0 Mtr head, includes greasing, lubricating of moving parts; replacement of bush, all types of bearings, terminal plates, impellers, thrust plate, gland packing etc as and when required or as directed by Engr-in-charge. (Note:- If dismantling of pump/ motor required for replacement of major parts such as rewinding/ overhauling then it will be measured and paid seperately under relevant item of this BOQ.)
Preventive and routine maintenance of Chiller pump set (03 Nos) comprise of electric motor of capacity 05 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 28.0 Mtr head, including greasing, lubricating of moving parts; replacement of bush, thrust plate, gland packing, all types of bearings, terminal plates etc as and when required or as directed by Engr-in-charge. (Note:- If dismantling of pump/ motor required for replacement of major parts then it will be measured and paid seperately under relevant item of this BOQ.)
Preventive and routine maintenance of FRP cooling tower (01 No) of 40 TR capacity complete with electric motor of capacity 3/5/7.5 HP, 1460 RPM, 50 Hz, including greasing, lubricating of moving parts, replacement of bush, thrust plate, gland packing, cleaning of cooling tower, incl PVC fins, repair of leakage/cracks of FRP water body using plastic welding etc.
Preventive and routine maintenance of PVC make-up tank / expansion tank (02 Nos) with inlet / outlet MS/GI pipe, float valve etc, installed near plant room at various locations, including cleaning/descaling of water tank, repair of water leakage and replacement of damaged float valves, pipe & pipe fittings etc. Note : Cleaning/ Descaling of tank shall be done as and when required and as directed by Engr-in-Charge.
Preventive and routine maintenance of LT main control panel, installed at main plant room and control desk / Remote, installed at main AC Plant room, to control the electric panel situated in various AC plant room, located at various locations with copper control wiring and other accessories i.e. indicator lamp, push button replacement of connectors, lugs, thimbles, separators and other control wiring as and when required.
Preventive and routine maintenance of MS condenser/chiller water pipe line of various sizes upto 150 mm dia to 32 mm dia including repair of leakage/cracks of MS pipes using various machine works i.e. welding, cutting, grinding etc; repair of damaged insulation with new one of existing type and description, pipe sections and fittings etc.
Preventive and routine maintenance of various flow control device(s) i.e. butterfly valves, motorized valve with actuator, gate valves, Non return valves, Y Strainer etc of various size and capacity, scale guard including repair of leakage, replacement of bush, gland packing, control wiring, lever mechanism, spindle etc.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Central AC Plant Room at SIU of capacity 3x25 TR, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments ( Work lies in Unrestricted area):-
Preventive and routine maintenance of Condensing pump set (03 Nos) comprise of electric motor of capacity 03 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 20.0 Mtr head, includes greasing, lubricating of moving parts; replacement of bush, all types of bearings, terminal plates, impellers, thrust plate, gland packing etc as and when required or as directed by Engr-in-charge. (Note:- If dismantling of pump/ motor required for replacement of major parts such as rewinding/ overhauling then it will be measured and paid seperately under relevant item of this BOQ.)
Preventive and routine maintenance of Chiller pump set (03 Nos) comprise of electric motor of capacity 03 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 28.0 Mtr head, including greasing, lubricating of moving parts; replacement of bush, all types of bearings, terminal plates, impellers, thrust plate, gland packing etc. (Note:- If dismantling of pump/ motor required for replacement of major parts then it will be measured and paid seperately under relevant item.)
Preventive and routine maintenance of FRP cooling tower (03 No) of 25 TR capacity complete with electric motor of capacity 5 HP, 1460 RPM, 50 Hz, including greasing, lubricating of moving parts, replacement of bush, thrust plate, gland packing, cleaning of Cooling tower incl cleaning of PVC fins, repair of leakage/cracks of FRP water body using plastic welding etc.
Preventive and routine maintenance of PVC make-up tank / expansion tank (02 Nos) with inlet / outlet MS/GI pipe, float valve etc, installed near plant room at various locations, including cleaning/descaling of water tank, repair of water leakage and replacement of damaged float valves, pipe & pipe fittings etc. Note : Cleaning/ Descaling of tank shall be done as and when required and as directed by Engr-in-Charge.
Preventive and routine maintenance of MS condenser/chiller water pipe line of various sizes upto 300 mm dia to 25 mm dia including repair of leakage/cracks of MS pipes using various machine works i.e. welding, cutting, grinding etc; repair of damaged insulation with new one of existing type and description, pipe sections and fittings etc.
Preventive and routine maintenance of various flow control device(s) i.e. butterfly valves, motorized valve with actuator, gate valves, Non return valves, Y Strainer etc of various size and capacity, scale guard including repair of leakage, replacement of bush, gland packing, control wiring, lever mechanism, spindle etc.
Preventive and routine maintenance of LT main control panel, installed at main plant room and control desk / Remote, installed at main AC Plant room, to control the electric panel situated in various AC plant room, located at various locations with copper control wiring and other accessories i.e. indicator lamp, push button replacement of connectors, lugs, thimbles, separators and other control wiring as and when required.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at central AC Plant at Corps Signal Unit of capacity 3x18 TR, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments ( Work lies in Unrestricted area):-
Preventive and routine maint of 03 Nos chilling machines Make : M/s ACCEL of reciprocating compressor, 3x18 TR each, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel complete incl charging/filling of R-22 gas whenever reqd till the currency of contract all as directed to entire satisfaction of Engineer-in-charge.
The cost of refrigerant & compressor oil, as and when required to be replaced / replenished during the entire contract period is deemed to be included in the quoted rates and no extra cost shall be paid to the contractor in this effect.
Preventive and routine maintenance of Condensing pump set (03 Nos) comprise of electric motor of capacity 03 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 20.0 Mtr head, includes greasing, lubricating of moving parts; replacement of bush, all types of bearings, terminal plates, impellers, thrust plate, gland packing as and when required or as directed by Engr-in-charge.. (Note:- If dismantling of pump/ motor required for replacement of major parts such as rewinding/ overhauling then it will be measured and paid seperately under relevant item of this BOQ.)
Preventive and routine maintenance of FRP cooling tower (03 No) of 18 TR capacity complete with electric motor of capacity 3 HP, 1460 RPM, 50 Hz, including greasing, lubricating of moving parts, replacement of bush, thrust plate, gland packing, cleaning of Cooling tower incl cleaning of PVC fins, repair of leakage/cracks of FRP water body using plastic welding etc.
Preventive and routine maintenance of PVC make-up tank / expansion tank of any capacity with inlet / outlet MS/GI pipe, float valve etc, installed near plant room 174 MH, including cleaning/descaling of water tank, repair of water leakage and replacement of damaged float valves, pipe & pipe fittings etc. Note : Cleaning/ Descaling of tank shall be done as and when required and as directed by Enger-in-charge.
Preventive and routine maintenance of MS condenser/chiller water pipe line of various sizes upto 300 mm dia to 25 mm dia including repair of leakage/cracks of MS pipes using various machine works i.e. welding, cutting, grinding etc; repair of damaged insulation with new one of existing type and description, pipe sections and fittings etc.
Preventive and routine maintenance of various flow control device(s) i.e. butterfly valves, motorized valve with actuator, gate valves, Non return valves, Y Strainer etc of various size and capacity, scale guard including repair of leakage, replacement of bush, gland packing, control wiring, lever mechanism, spindle etc.
Preventive and routine maintenance of LT main control panel, installed at main plant room and control desk / Remote, installed at main AC Plant room, to control the electric panel situated in various AC plant room, located at various locations with copper control wiring and other accessories i.e. indicator lamp, push button replacement of connectors, lugs, thimbles, separators and other control wiring as and when required.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Central AC Plant at TAC, of capacity 3x5.5 TR, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments ( Work lies in Unrestricted area):-
Preventive and routine maint of 03 Nos chilling machines Make : M/s Carrier of reciprocating compressor, 3x5.5 TR each, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel complete incl charging/filling of R-22 gas whenever reqd till the currency of contract all as directed to entire satisfaction of Engineer-in-charge .
The cost of refrigerant & compressor oil, as and when required to be replaced / replenished during the entire contract period is deemed to be included in the quoted rates and no extra cost shall be paid to the contractor in this effect.
Preventive and routine maintenance of Condensing pump set (02 Nos) comprise of electric motor of capacity 02 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 20.0 Mtr head, includes greasing, lubricating of moving parts; replacement of bush, all types of bearings, terminal plates, impellers, thrust plate, gland packing etc as and when required or as directed by Engr-in-charge. (Note:- If dismantling of pump/ motor required for replacement of major parts such as rewinding/ overhauling then it will be measured and paid seperately under relevant item of this BOQ.)
Preventive and routine maintenance of Chiller pump set (02 Nos) comprise of electric motor of capacity 02 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 28.0 Mtr head, including greasing, lubricating of moving parts; replacement of bush, thrust plate, gland packing, all types of bearings, terminal plates, impellers, thrust plates etc as and when required or as directed by Engr-in-charge. (Note:- If dismantling of pump/ motor required for replacement of major parts such as rewinding/ overhauling then it will be measured and paid seperately under relevant item of this BOQ.)
Preventive and routine maintenance of FRP cooling tower (01 No) of 10 TR capacity complete with electric motor of capacity 3 HP, 1460 RPM, 50 Hz, including greasing, lubricating of moving parts, replacement of bush, thrust plate, gland packing, cleaning of Cooling tower incl cleaning of PVC fins, repair of leakage/cracks of FRP water body using plastic welding etc. Note : Cleaning/ Descaling of tank shall be done as and when required and as directed by Engr-in-Charge.
Preventive and routine maintenance of PVC make-up tank / expansion tank (03 Nos) capacity with inlet / outlet MS/GI pipe, float valve etc, installed near plant room 10 TAC, including cleaning/descaling of water tank, repair of water leakage and replacement of damaged float valves, pipe & pipe fittings etc.
Preventive and routine maintenance of MS condenser/chiller water pipe line of various sizes upto 100 mm dia to 25 mm dia including repair of leakage/cracks of MS pipes using various machine works i.e. welding, cutting, grinding etc; repair of damaged insulation with new one of existing type and description, pipe sections and fittings etc.
Preventive and routine maintenance of various flow control device(s) i.e. butterfly valves, motorized valve with actuator, gate valves, Non return valves, Y Strainer etc of various size and capacity, scale guard including repair of leakage, replacement of bush, gland packing, control wiring, lever mechanism, spindle etc.
Preventive and routine maintenance of LT main control panel, installed at main plant room and control desk / Remote, installed at main AC Plant room at various locations with copper control wiring and other accessories i.e. indicator lamp, push button connectors, control wirings etc.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Package AC Plant at Corps IIT of capacity 3x7.5 TR, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments ( Work lies in Unrestricted area):- (a) Preventive and routine maintenance of Condensor Hermetically/semi hermetically sealed compressor (03 Nos) comprise of electric motor of capacity 03 HP, 3 PH, 1460 RPM, 50 Hz includes greasing, lubricating of moving parts; replacement of bush, thrust plate, gland packing etc. (Note:- If dismantling of pump/ motor required for replacement of major parts then will be measured and paid seperately under relevant item.) (b) Preventive and routine maintenance of Air Cooled condensor, Indoor and outdoor unit incl checking od thermostatic expasnion valve, air fliter (incl cleaning), front panel and return air grill, evaporator coil, evaporator fan and housing.
Note for Ser Item Nos 03 to 07 : (a) The cost of all replaced defective parts / spares, other than mentioned in BOQ such as wires, toggle switch, lugs, nuts & bolts, cable gland etc, as and when required, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect. The replacement cost (labour charges) for all defective / spares parts mentioned in BOQ’ as supply only, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect at any stage. (b) All the complaint / faults will be addressed within 30 min from the time of receipt of complaint. If, contractor or his tradesmen fails to attend the complaint within 30 min from the time of receipt of complaint, the compensation/penalty of Rs. 500.00 (Rupees Five Hundred only) per complaint per hr for first 04 hrs and after that Rs. 1000.00 (Rupees One Thousand only) per complaint per hr shall be recovered from the contractor’s dues. (c) The cost of transportation (to and fro) and other necessary equipment shall be arranged / brought by contractor to complete the job and no extra cost shall be paid to the contractor in this effect.
M&L for Annual comprehensive maint, Preventive and routine maint of following chilling units :- (a) FAD M 04 - 04 Nos Chilling Units (b) FAD M 05 - 04 Nos Chilling Units (c) FAD M 06 - 04 Nos Chilling Units (d) FAD M 07 - 04 Nos Chilling Units (e) FAD M 08 - 04 Nos Chilling Units (f) FAD M 09 - 04 Nos Chilling Units (g) FAD M 10 - 04 Nos Chilling Units (h) EME Wksp No 01 ( Fd Wksp) - 02 Nos Chilling Units (j) EME Wksp No 02 ( Fd Wksp) - 02 Nos Chilling Units (k) EME Wksp No 03 ( Fd Wksp) - 03 Nos Chilling Units Total - 35 Nos of Chilling Units Make : M/s Blue Star of screw type compressor, 11/12.5 TR each, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel, complete all as directed to entire satisfaction of Engineer-in-charge with following requirement / condition and for following items / equipments - Note : Work of M-04, M-05, M-06, M-07, M-08, M-09, M-10 lies in restricted area. EME Wksp No 1,02 and 03 lies in unrestricted area.
M&L for Annual comprehensive maint, Preventive and routine maint of 03 Nos chilling machines Make : M/s Blue Star of screw type compressor, 3x100 TR each, single stage, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel installed at MH complete all as directed to entire satisfaction of Engineer-in-charge with following requirement / condition and for following items / equipments ( Work lies in Unrestricted area):-
M&L for Annual comprehensive maint, Preventive and routine maint of Package type AC Plant unit (DX type) of capacity 3x13.7 TR including outdoor unit Hermetically sealed compressor, safety devices, cooling thermostat, humidity stat kit Make : M/s Blue Star incl control panel installed at UAV 'I' level complete all as directed to entire satisfaction of Engineer-in-charge with following requirement / condition and for following items / equipments ( Work lies in Unrestricted area):-
M&L for Annual comprehensive maint, Preventive and routine maint of Ductable Package type AC Plant factory assembled of capacity 3x5.5 TR air cooled type with all accessories and controls each compressor Make : M/s Blue Star incl control panel installed at UAV hanger complete all as directed to entire satisfaction of Engineer-in-charge with following requirement / condition and for following items / equipments ( Work lies in Unrestricted area):-
Notes for item Nos 08 to 11:- (a) The 03 (Three) preventive / periodical maint services and 01 (one) annual comprehensive maint service to each chiller machines of Make : M/s Blue Star of screw type compressor, 415 Volts, 3 Ph, 50 Hz, shell & tube type condenser with carbon steel plate, copper tube, incl carbon plate shell & tube flooded type chiller unit working with microprocessor base controls in sheet metal control panel during the currency of the contract shall be carried out by the rep of M/S Voltas Ltd and its cost shall be included in unit quoted rate. Nothing extra shall be admissible in this account at a later date. The contractor shall submit the record of periodical/ preventive/ Annual maint services carried out by M/s Blue Star along with documentary evidence for claiming payment. In this respect please refer schedule 'A' Note 25 on page 15(R) of tender documents. (b) The cost of refrigerant & compressor oil, as and when required to be replaced / replenished during the entire contract period is deemed to be included in the quoted rates and no extra cost shall be paid to the contractor in this effect. (c) The repaired / replaced cost (M&L) of all defective parts / spares, as and when required, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect at any stage. (d) During entire contract period, any defective component(s) and/or any other materials which is not specified /given in BOQ, but essential to be repair/replace, to make plant(s)/machine(s) fully functional, the cost of the same is deemed to be included in unit quoted rate. Rates are deemed in quoted rates for painting work of plants and panel board. (e) Descaling of condensors/ chemical cleaning of evaporator coils once a year. (f) Annual pumping down and restarting of the plant as and when required.
Notes for item Nos 08 to 11 (Contd...):- (g) The entire work as mentioned in srl item no 08 to 11, shall be got executed through OEM i.e. M/s Blue Star only. The contractor shall submit the orignal copy of MOU with OEM i.e. M/s Blue Star, within fifteen days of acceptance of tender, failing which the contract shall be cancelled under condition 54 of IAFW 2249 and the contractor shall be liable for forefeit the performance security amount. (h) The chiller machines alongwith connected items will be handed over to contractor in running condition, but with fair wear & tear which can be meet out through annual comprehensive maint. Hence, the bidder is advised to visit the site to assess the quantum of work to be carried out in this contract and quote thier rates accordingly and no claim in this effect will be admitted at a later stage. (j) The repair / replacement cost (M&L) of all defective parts / spares, as and when required, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect at any stage. (k) All the complaint / faults will be addressed within 30 min from the time of receipt of complaint. If, contractor or his tradesmen fails to attend the complaint within 30 min from the time of receipt of complaint, the compensation/penalty of Rs. 500.00 (Rupees Five Hundred only) per complaint per hr for first 04 hrs and after that Rs. 1000.00 (Rupees One Thousand only) per complaint per hr shall be recovered from the contractor’s dues. (l) The cost of transportation (to and fro) and other necessary equipment shall be arranged / brought by contractor to complete the job and no extra cost shall be paid to the contractor in this effect.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Central AC Plant Room following location, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments -
EME Wksp No 01 (Fd Wksp)
EME Wksp No 02 (Fd Wksp)
EME Wksp No 03 (Fd Wksp)
Notes for item Nos 12.01 to 12.10:- (a) Preventive and routine maintenance of Condensing pump set (03 Nos) comprise of electric motor of capacity 03 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 20.0 Mtr head, includes greasing, lubricating of moving parts; replacement of bush,all types of bearings, terminal plates, impellers, thrust plate, gland packing etc as and when required or as directed by Engr-in-charge. (Note:- If dismantling of pump/ motor required for replacement of major parts such as rewinding/ overhauling then it will be measured and paid seperately under relevant item of this BOQ.) (b) Preventive and routine maintenance of Chiller pump set (03 Nos) comprise of electric motor of capacity 03 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 28.0 Mtr head, including greasing, lubricating of moving parts; replacement of bush, thrust plate, gland packing, all types of bearings, terminal plates etc as and when required or as directed by Engr-in-charge.. (Note:- If dismantling of pump/ motor required for replacement of major parts then it will be measured and paid seperately under relevant item of this BOQ.) (c) Preventive and routine maintenance of FRP cooling tower (01 No) of 22/25/37.5 TR capacity complete with electric motor of capacity 3/5/7.5 HP, 1460 RPM, 50 Hz, including greasing, lubricating of moving parts, replacement of bush, thrust plate, gland packing, cleaning of cooling tower, incl PVC fins, repair of leakage/cracks of FRP water body using plastic welding etc. (d) Preventive and routine maintenance of hot water generator (02 nos) 36 KW capacity with two stage capacity control, inbuilt electric control panel, thermostats buzzer for low level of water and mono block pump set with all accessories including descaling and repair of leakage and damaged minor parts. (Note:- If dismantling complete for replacement of major parts then will be measured and paid seperately under relevant item.)
Notes for item Nos 12.01 to 12.10 (Contd...):- (e) Preventive and routine maintenance of PVC make-up tank / expansion tank of any capacity with inlet / outlet MS/GI pipe, float valve etc, installed near plant room at various locations, including cleaning/descaling of water tank, repair of water leakage and replacement of damaged float valves, pipe & pipe fittings etc. (Note : Cleaning/ Descaling of tank shall be done as and when required and as directed by Engr-in-Charge.) (f) Preventive and routine maintenance of LT main control panel, installed at main plant room and control desk / Remote, installed at main AC Plant room, to control the electric panel situated in various AC plant room, located at various locations with copper control wiring and other accessories i.e. indicator lamp, push button replacement of connections, lugs, thimbles, separators and other control wiring as and when required. (g) Preventive and routine maintenance of MS condenser/chiller water pipe line of various sizes upto 150 mm dia to 32 mm dia including repair of leakage/cracks of MS pipes using various machine works i.e. welding, cutting, grinding etc; repair of damaged insulation with new one of existing type and description, pipe sections and fittings etc. (h) Preventive and routine maintenance of various flow control device(s) i.e. butterfly valves, motorized valve with actuator, gate valves, Non return valves, Y Strainer etc of various size and capacity, scale guard including repair of leakage, replacement of bush, gland packing, control wiring, lever mechanism, spindle etc. (j) The work of Srl Item No 12.01 to 12.07 lies in restricted area and Srl Item No 12.08 to 12.10 lies in Unrestricted area.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Central AC Plant Room at MH of capacity 3x100 TR, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments ( Work lies in Unrestricted area) :- (a) Preventive and routine maintenance of Condensing pump set (03 Nos) comprise of electric motor of capacity 15 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 20.0 Mtr head, includes greasing, lubricating of moving parts; replacement of bush, all types of bearings, terminal plates, impellers, thrust plate, gland packing etc as and when required or as directed by Engr-in-charge. (Note:- If dismantling of pump/ motor required for replacement of major parts such as rewinding/ overhauling then it will be measured and paid seperately under relevant item of this BOQ.) (b) Preventive and routine maintenance of Chiller pump set (03 Nos) comprise of electric motor of capacity 15 HP, 3 PH, 1460 RPM, 50 Hz and centrifugal pump with 28.0 Mtr head, including greasing, lubricating of moving parts; replacement of bush, thrust plate, gland packing all types of bearings, terminal plates etc as and when required or as directed by Engr-in-charge.. (Note:- If dismantling of pump/ motor required for replacement of major parts then will be measured and paid seperately under relevant item.) (c) Preventive and routine maintenance of FRP cooling tower (03 No) of 100 TR capacity complete with electric motor of capacity 5 HP, 1460 RPM, 50 Hz, including greasing, lubricating of moving parts, replacement of bush, thrust plate, gland packing, cleaning of Cooling tower incl cleaning of PVC fins, repair of leakage/cracks of FRP water body using plastic welding etc.
Item No 13 (Contd..):- (d) Preventive and routine maintenance of PVC make-up tank / expansion tank of any capacity with inlet / outlet MS/GI pipe, float valve etc, installed near plant room 174 MH, including cleaning/descaling of water tank, repair of water leakage and replacement of damaged float valves, pipe & pipe fittings etc.(Note : Cleaning/ Descaling of tank shall be done as and when required and as directed by Enger-in-charge.) (e) Preventive and routine maintenance of MS condenser/chiller water pipe line of various sizes upto 300 mm dia to 25 mm dia including repair of leakage/cracks of MS pipes using various machine works i.e. welding, cutting, grinding etc; repair of damaged insulation with new one of existing type and description, pipe sections and fittings etc. (f) Preventive and routine maintenance of various flow control device(s) i.e. butterfly valves, motorized valve with actuator, gate valves, Non return valves, Y Strainer etc of various size and capacity, scale guard including repair of leakage, replacement of bush, gland packing, control wiring, lever mechanism, spindle etc. (Note:- If dismantling of pump/ motor required for replacement of major parts then will be measured and paid seperately under relevant item.) (g) Preventive and routine maintenance of LT main control panel, installed at main plant room and control desk / Remote, installed at main AC Plant room, to control the electric panel situated in various AC plant room, located at various locations with copper control wiring and other accessories i.e. indicator lamp, push button replacement of connectors, lugs, thimbles, separators and other control wiring as and when required.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Package AC Plant at UAV Hanger 'I' Level of capacity 3x13.7 TR, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments - (a) Preventive and routine maintenance of Condensor Hermetically/semi hermetically sealed compressor (03 Nos) comprise of electric motor of capacity 03 HP, 3 PH, 1460 RPM, 50 Hz includes greasing, lubricating of moving parts; replacement of bush, thrust plate, gland packing etc. (Note:- If dismantling of pump/ motor required for replacement of major parts then will be measured and paid seperately under relevant item.) (b) Preventive and routine maintenance of Air Cooled condensor, Indoor and outdoor unit incl checking od thermostatic expasnion valve, air fliter (incl cleaning), front panel and return air grill, evaporator coil, evaporator fan and housing. (Note:- If dismantling of pump/ motor required for replacement of major parts then will be measured and paid seperately under relevant item.) (c) Preventive maintenance also includes cleaning of indoor and outdoor unit of package AC plants three times in currency of contract and schedule of cleaning will be fixed by Engr-in-charge.
M&L for annual comprehensive, Preventive and routine maint of various items / equipments, installed at Package AC Plant at UAV Hanger of capacity 3x5.5 TR, as mentioned below, as per manufacturer's instruction, complete all as directed, for following items / equipments ( Work lies in Unrestricted area) :- (a) Preventive and routine maintenance of Condensor Hermetically/semi hermetically sealed compressor (03 Nos) comprise of electric motor of capacity 03 HP, 3 PH, 1460 RPM, 50 Hz includes greasing, lubricating of moving parts; replacement of bush, thrust plate, gland packing etc. (Note:- If dismantling of pump/ motor required for replacement of major parts then will be measured and paid seperately under relevant item.) (b) Preventive and routine maintenance of Air Cooled condensor, indoor and outdoor unit incl checking of thermostatic expasnion valve, air fliter (incl cleaning), front panel and return air grill, evaporator coil, evaporator fan and housing. (c) Preventive maintenance also includes cleaning of indoor and outdoor unit of package AC plants three times in currency of contract and schedule of cleaning will be fixed by Engr-in-charge.
Notes for item Nos 12 to 15:- (a) The cost of all replaced defective parts / spares, other than mentioned in BOQ such as wires, toggle switch, lugs, nuts & bolts, cable gland etc, as and when required, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect. The replacement cost (labour charges) for all defective / spares parts mentioned in Sch – ‘A’ as supply only, is deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect at any stage. (b) All the complaint / faults will be addressed within 30 min from the time of receipt of complaint. If, contractor or his tradesmen fails to attend the complained within 30 min from the time of receipt of complaint, the compensation/penalty of Rs. 500.00 (Rupees Five Hundred only) per complaint per hr for first 04 hrs and after that Rs. 1000.00 (Rupees One Thousand only) per complaint per hr shall be recovered from the contractor’s dues. (c) The cost of transportation (to and fro) and other necessary equipment shall be arranged / brought by contractor to complete the job and no extra cost shall be paid to the contractor in this effect.
M&L for dismantling of electric driven horizontal induction motor of capacity 2.0 HP of any type and make, by engaging sufficient man power and suitable T&P to ensure safety of pump-motor as well as working persons including disconnecting of electric connections, dismantling of motor, taking out the burnt windings, cleaning and washing of slots and rewinding the same with copper winding wire of existing gauge and quantity (as per original manufacturer design) including replacement of all damaged parts i. e. bearings, bush, thrust plate, thrust bearing, connector plate, insulating materials such as insulating sheets insulating paper (Class "F"), sealing compounds etc and reassembling the motor after varnishing, heating/drying, greasing of moving parts etc and reinstallation of the motor in original location, checking the alignment, making proper electric connection, testing for smooth operation, complete all as directed. Note : (i) The cost of winding wire and all replaced defective parts are deemed to be included in quoted rates and no extra cost shall be paid to the contractor in this effect. (ii) The cost of transportation (to and fro) and other necessary equipment shall be arranged/brought by contractor to complete the job at site or at repair shop and no extra cost shall be paid to the contractor in this effect.
All as per srl item no 16 here-in-above but for 3.0 HP capacity.
All as per srl item no 16 here-in-above but for 5.0 HP capacity.
All as per srl item no 16 here-in-above but for 7.5 HP capacity.
All as per srl item no 16 here-in-above but for 10.0 HP capacity.
All as per srl item no 16 here-in-above but for 15.0 HP capacity.
All as per srl item no 16 here-in-above but for 20.0 HP capacity.
All as per srl item no 16 here-in-above but for 25.0 HP capacity.
M&L for complete overhauling of condenser / chiller centrifugal pumpset of 20.00/15.00 HP by engaging sufficient man power and suitable T&P to ensure safety of pump-motor as well as working persons including disconnecting suction & discharge water lines and disconnecting of electric connection, dismantling the U/S pumpset from MS foundation, detaching the pump, opening the pump, remelting the shaft and filling of metal at decayed portions including all kind of machine works i.e. welding, turning, polishing etc as required to make the shaft of required shape and size, as original, balancing the shaft and refitting in pump body; complete replacement of impeller set with new; replacement of Cushy foot anti vibration pad with and incl carrying out complete repair / replacement of damaged parts i.e. bearings, bush, gland plate, gland packing, coupling assembly etc and reassembling the pump after greasing of moving parts and reinstallation of the pump with motor in original location using new MS stud, nut, bolt, washer and other packing material etc; checking the alignment; reconnecting the suction and delivery pipes, making proper electric connection, testing and commissioning for smooth operation at optimum efficiency, complete all as directed.
All as per srl item no 24 here-in-above but for 10 / 7.5 HP capacity.
All as per srl item no 24 here-in-above but for 5/02 HP capacity.
M & L for earthing complete with galvanized iron or steel earth plate electrode of size 60 cm x 60cm x 6.0mm thick buried directly in ground vertically to a depth not less than 2.25 metre below normal ground level (with top edge of earth plate not less than 1.5 metre below ground level) connected to galvanized iron earth strip 25x4 mm, (main earthing lead) by means of galvanized bolts, nuts and washers all as shown in electrical plate No 3 of MES Schedule Part-I (2009) with connected to LT Panel Board with & including adequate quantity of charcoal dust and common salt alround earth plate & 40 mm dia GI pipe light grade for earth strip protection for suitable length and GI pipe 15 mm dia light grade for watering pipe with funnel & wire mesh including necessary earth work and PCC (1: 3 : 6) type C-1 for earth pit and 40 mm thick precast RCC cover in 1 : 2 : 4 type B-1 with 3 Nos 8 mm dia TMT bars both ways with 12mm dia round bar handle complete all as specified & directed. Note:- The rate quoted by the contractor shall be deemed to be included of earth strip 25x4mm and pit protection pipe 40mm dia light grade up to 7.5 mtr distance. Earth strip beyond 7.5 mtr will be measured and paid separately under relevant items. (ii) The unit rate shall also include for earth work in any type of soil, PCC (1:3:6) type C1 chamber, RCC 1:2:4 type B1 cover 50mm thick reinforced with 8mm dia TMT bars @ 150mm C/C both ways, funnel with watering pipe.
Supply, install, Testing and Commissioning Electronic Temperature and Electric operated Actuator for motorized combination fire and smoke damper (spring return type) all as specified and directed by Engr-in-Charge.
M&L for Earth continuity conductor or main earthing lead fix to wall/ laid in trenches fixed in tray all as directed , of size 25 x 4 mm galvanised.
Disconnecting and dismantling of open type compressor of central air conditioning plant and reinstalled in its position with correct alignment after necessary overhauling, cleaning, repair, servicing, testing and commissioning of reciprocating open type compressor of capacity 18 Ton (Make: Accel model No SMC- 6-65), replacement of unserviceable parts (as ordered) and charging of compressor oil and refrigerant (Freon-22) complete to the entire satisfaction of Engineer-in-Charge. NOTE : (i) The spare parts required for replacement shall be measured and paid separately as supply only under srl item no. 32.01 to 32.26. (ii) All spare parts shall be of make ACCEL. (iii) Compressor oil and refrigerant will be issue by departmant. (iv) Supply only following parts for SMC-6-65 model compressor.
Repair & maintenance of oil pump of 18 Ton compressor SMC-6-65 Model Accel make by opening and dismantling all parts of oil pump for overhauling, cleaning and washing all parts in petrol to the entire satisfaction of Engineer-in-Charge and reassembling including replacement of 2 nos bearing bushing one split pin and all gear wheel set complete all as specified and directed as per manufactures instructions.
Supply only the following items :- Note :- (a) The items as mentioned below is for 65 mm dia bore compressor Model No SMC-6-65.
Dowty ring
Head/Side Cover Gasket with discharge flange gasket
Oil Level Gasket with gasket for glass and circular Nut
Main Bearing without collar 0.75 mm
Shaft Seal cover with gasket
Shaft Seal Assembly complete
Spring Retainer with soring for shaft seal, thrust collar,'O' ring for seal, slide ring and carbin ring
Oil Pump Assembly complete with bushing for oil pump, gear wheel set, 'O' ring for oil pump, Coupling and Pin for coupling
Bracket with pin for bracket and spacing washer
Lock Nut for crank shaft incl washer and key
Connecting Rod complete incl bearing of size 0.75 mm, bushing, connecting rod bolt and castel nut
Piston Assembly complete with Piston Pin, Piston Ring Set
Cylinder Liner Assembly (Freon) with suction valve ring plate (0.8 mm), buffer ring spring, suction valve ring retaining plate, guide for ring liner, liner gasket
Discharge Valve Assembly (Freon)
Oil Pressure Regulating Valve Aseembly
Oil Charging Valve Assembly
Safety Valve Assembly with spring
Service Valve Assembly
Spindle for Service Valve with Lock Washer
Manual Capacity Valve Assembly with Nipple
Oil Strainer Assembly
Gasket Set Complete (6 Cylinder)
Solonoid Valve Assembly (Make : Rotex)
Coil for Solonoid Valve (Make : Rotex)
Crank case Heater Element
Crank Case Heater Assembly
Supply only in replacement of power contactor of 25 amp AC3 rating, 03 pole, with 2NO+2NC Aux Contacts, 415V, ML 1.5 with and including taking down of unserviceable contactor and making all electric connection, complete all as directed.
All as per srl item No 33 here-in-above but 32 Amps capacity ML 2.
All as per srl item No 33 here-in-above but 40 Amps capacity ML 3.
Supply only in replacement of over load relay range 17-25.5 Amps, with built in single phase preventer, direct / separate mounting on contactors, as required, with and incl taking down of unserviceable relay and making all electric connection, complete all as directed. Make : L&T cat part No CS96356OODO or equivalent model of approved make from list of make attached in tender documents.
All as per srl item No 36 here-in-above but 8.5 to 12.5 Amps capacity. Make : L&T cat part No CS96355OOAO or equivalent model of approved make from list of make attached in tender documents.
All as per srl item No 36 here-in-above but 3.5 to 5.2 Amps capacity. Make : L&T cat part No CS96355OOSO or equivalent model of approved make from list of make attached in tender documents.
Supply only in replacement of Digital volt meter of size 96mm x 96mm, three phase, class I with range 0-500 V complete all as directed.
Supply only in replacement of LED type indicator lamp 22.5mm of red/blue/green colour for phase indication, complete all as directed.
Supply only in replacement of push button, projecting head (push function) type, complete all as directed.
Supply only in replacement, of MCCB 40 Amp,3 pole, 16 KA, C Curve, complete all as directed.
Supply only in replacement, of MCCB 63 Amp, 3 pole, 16 KA, ICS = 100% ICU, with adjustable thermal magnetic setting alongwith Spreader terminals and phase barriers, complete all as directed.
All as per srl item No. 44 here-in-before but 100 Amp breaking capacity 36 KA.
All as per srl item No. 44 here-in-before but 125 Amp breaking capacity 36 KA.
Supply only in replacement, of CI butter fly valve, ISI marked, PN - 1.6 pressure grade, having Nitrile/EPDM rubber lining, SS stem, CS/SS disc, lever operated type, of size 50mm dia bore including all jointing material i. e. nut, bolt, washer, packing material etc, duly insulated, complete all as directed.
All as per srl item No 47 here-in-above but 65 mm dia size.
All as per srl item No 47 here-in-above but 80 mm dia size.
All as per srl item No 47 here-in-above but 125 mm dia size.
All as per srl item No 47 here-in-above but 150 mm dia size.
Supply and fixing non return valve PN-1.6, IS 5312 Part -I, 200 mm dia both ends flanged heavy duty including packing materials, nut bolts washer etc and testing complete including taking out of old U/S non return valve all as directed. Body Cover CI IS : 210, Gr. FG260. Body Rings - Bronze : IS 318 Gr. LTB2. Hinge Pin-SS ASTM A276 Type 410. Flage Drilling - IS 1538, Table 4 & 6.
All as per item No 52 here in above but 150mm dia size
Supply only, in replacement, of gun metal gate valve of 20 mm dia bore size (IS -778) Class 1 with iron wheel head, screwed inside, non-rising stem, complete all as directed.
All as per srl item No 54 here-in-above but of 25 mm bore size.
M&L for insulation of MS pipe of 150 mm dia and above size with PUF slab 40 mm thick with and incl applying bituminous compound and GI cladding with 26 gauge GI sheet with and incl taking down of old insulation and preparing of pipe surface by scratching / removing rust, dust and old paints etc with wire brush, emery paper, grinder etc and making surfaces smooth, complete all as directed.
All as per srl item no 56 here-in-above but of 125 mm bore size.
Supply only, in replacement, of Single phase heating element capacity 03 KW, ISI marked of existing shape and size suitable for hot water generator and making electric connections and taking down old unserviceable heating elements, complete all as directed. Make : Daspass / Theata
Supply only in replacement of temperature gauge bottom connected, direct mounted type, of temperature range of 0 - 100°C or 32 - 212°F, complete all as directed. Make : H-Guru model No 4BSW3 / Fiebig / Wika
Supply only in replacement, of Pressure gauge, bourdon type, 150 mm dial size, pressure range 2-28 Kg/cm2, complete all as directed. Make : H-Guru model No 6PDASW2 / Fiebig / Wika
Supply only Poly-F Plus PB classical Belts of size B-29. Make Fenner/Dunlop
All as per item No. 61 but B-41.
All as per item No. 61 but B-42
All as per item No. 61 but B-56.
All as per item No. 61 but B-62.
All as per item No. 61 but B-66.
All as per item No. 61 but B-68
All as per item No. 61 but B-69
All as per item No. 61 but B-70
All as per item No. 61 but B-77.
All as per item No. 61 but B-83
All as per item No. 61 but B-102
All as per item No. 61 but B-107
All as per item No. 61 but B-117
Supply only Poly-F Plus PB classical Belts of size A-26. Make Fenner/Dunlop
All as per item No. 75 but A-28
All as per item No. 75 but A-31.
All as per item No. 75 but A-38
All as per item No. 75 but A-51
All as per item No. 75 but A-53
M&L in replacement, for PVC fins Box suitable for cooling tower from 05 to 40 TR capacity, FRP induced draft type (Model : CM-12), complete all as directed. Make : Mihir/Paharpur
S&F Rotational moulded poly-ethylene three layered, white in colour, water storage tanks (cylinderical vertical with closed top) 10000 litres capacity,hoisted and fixed in position with and including all fittings and fixtures complete all as specified and directed.
Part-II : MANNING AND OPERATION WORKS
Manning and Operation of Central Air Conditioning Plants (DX System) of capacity 3x6 Ton (6 Ton x 3, 2-running & one stand by in each plant) in three shifts per day (each shift of 08 hours continuous duration operated by one operator in each shift) installed at M-1,M-2,M-3 at FAD at Bathinda Mil Stn including maintenance i.e daily, monthly check and cleaning of Central AC Plant comprising of compressors, motors, condensers, cooling tower, AHU, refrigerant piping, control pumps, water supply pipe line and controles, electric panel, instruments, starters, strip heaters and control cabling/wiring all as specified and direct by Engineer-in-Charge for smooth and efficient performance of AC Plant to achieve desired inside condition through out the currency of contract. Brief description of plant as given below ( Work lies in Restricted area) :- (i) AC compressor 3x6 Ton driven by electric motor (2 x 6 Ton in operation and 1 x 6 Ton as stand by) (ii) Condensing unit Nos. (2 Nos of operation and 01 No as stand by) (iii) 2 Pump Sets for condensor water including pluming work. (iv) Air handling unit 12 Ton capacity including blower motor, humidifier and dehumidifier, pre heater and reheater. (v) Electric panel including all controls and wiring. (vi) Cooling tower 12 Ton.
Manning and Operation of Central Air Conditioning Plants (Chiller Units) of capacity 2x37.5 Ton (12.5 Ton x 4, 3-running & one stand by in each plant) in three shifts per day (each shift of 08 hours continuous duration operated by one operator in each shift) installed at M-4, M-5 at FAD at Bathinda Mil Stn including maintenance i.e daily, monthly check and cleaning of Central AC Plant comprising of compressors, motors, condensers, cooling tower, AHU, refrigerant piping, control pumps, water supply pipe line and controles, electric panel, instruments, starters, strip heaters and control cabling/wiring all as specified and direct by Engineer-in-Charge for smooth and efficient performance of AC Plant to achieve desired inside condition through out the currency of contract. Brief description of plant as given below ( Work lies in Restricted area) :- (i) AC compressor 4x12.5 Ton (3 x 12.5 Ton in operation and 1 x 12.5 Ton as stand by) (ii) Condensing unit Nos. (4 Nos of operation and 01 No as stand by) (iii) 4 (three running and one stand by) Pump Sets for condensor water including pluming work. (iv) 4 (three running & one standby) Pump Sets for chiller units including plumbing work. (v) Hot water generator 30 KW with pump & plumbing work. (vi) Air handling unit capacity 20000 cfm including blowe motor, humidifier and deumidifier. (vii) Electric panel including all controls and wiring. (viii) Cooling tower of 37.5 Ton capacity. .
Manning and Operation of Central Air Conditioning Plants (Chiller Units) of capacity 3x37.5 Ton (12.5 Ton x 4, 3-running & ine stand by in each plant) in three shifts per day (each shift of 08 hours continuous duration operated by one operator in each shift) installed at M-6,M-7,M-8 at FAD at Bathinda Mil Stn including maintenance i.e daily, monthly check and cleaning of Central AC Plant comprising of compressors, motors, condensers, cooling tower, AHU, refrigerant piping, control pumps, water supply pipe line and controles, electric panel, instruments, starters, strip heaters and control cabling/wiring all as specified and direct by Engineer-in-Charge for smooth and efficient performance of AC Plant to achieve desired inside condition through out the currency of contract. Brief description of plant as given below ( Work lies in Restricted area) :- (i) AC compressor 4x12.5 Ton (3 x 12.5 Ton in operation and 1 x 12.5 Ton as stand by) (ii) Condensing unit Nos. (4 Nos of operation and 01 No as stand by) (iii) 4 (three running and one stand by) Pump Sets for condensor water including pluming work. (iv) 4 (three running & one standby) Pump Sets for chiller units including plumbing work. (v) Hot water generator 30 KW with pump & plumbing work. (vi) Air handling unit capacity 20000 cfm including blowe motor, humidifier and deumidifier. (vii) Electric panel including all controls and wiring. (viii) Cooling tower of 37.5 Ton capacity.
Manning and Operation of Central Air Conditioning Plants (Chiller Units) of capacity 2x12.5 Ton (both running) in one shifts per day (each shift of 08 hours continuous duration operated by one operator in each shift) installed at EME Wksp Fd Wksp Bathinda Mil Stn including maintenance i.e daily, monthly check and cleaning of Central AC Plant comprising of compressors, motors, condensers, cooling tower, AHU, refrigerant piping, control pumps, water supply pipe line and controles, electric panel, instruments, starters, strip heaters and control cabling/wiring all as specified and direct by Engineer-in-Charge for smooth and efficient performance of AC Plant to achieve desired inside condition through out the currency of contract. Brief description of plant as given below ( Work lies in Unrestricted area) :- (i) AC compressor 2x12.5 Ton. (ii) Condensing unit Nos - 2 Nos. (iii) 2 (One running & one standby) Pump Sets for condensor water including pluming work. (iv) 2 (One running & one standby) Pump Sets for chiller units including plumbing work. (v) Strip heater 30 KW . (vi) Air handling unit capacity 10000 cfm including blowe motor, humidifier and deumidifier. (vii) Electric panel including all controls and wiring. (viii) Cooling tower of 25 Ton capacity.
Manning and Operation of Central Air Conditioning Plant/chiller system 10 TR capacity installed at TAC ,package type of capacity 15 TR installed at IIT (Adm block) and Central Air Conditioning Plant (DX type) of capacity 36Ton(group of 3 AC Plants) at Bathinda Mil Stn in three shifts per day (each shift of 8 hours continuous duration operated by one operator in each shift) including cleaning of central AC Plant /package type AC plant comprising of compressors, motors, condensers, chiller, cooling tower, AHU, refrigerant piping, control pumps, water supply pipe line and controls, electric panel, instruments, starters, strip heaters and control cabling/wiring and oudoor unit all as specified and directed by Engineer-in-Charge for smooth and efficient performance of AC Plant to achieve desired inside condition through out the currency of contract. Brief description of each plant is as given below ( Work lies in Unrestricted area) :- (a) Central AC plant ( capacity: 10 Ton) : (i) AC Compressor Model SMC 2x65 Accel 3x5TR Ton and ( One stand by) (ii) Condensing Unit 3x5Ton (02 Nos in operation and 01 No as stand by) (iii) 3x5 Ton Chiller unit (02 Nos in operation and 01 No as stand by) (iv) 3x7.5 HP compressor motor (2 Nos in operation and 01 No as stand by) (v) 2x2HP condenser pump set (1 No in operation and 01 No as stand by) including piping and controls (vi) 2x2 HP chiller pump sets (02 Nos in operation and 01 No as stand by) (vii) AHU units including blower motor, pre/fine filter and heater Electric panel including all controls and wiring (viii) Control devise and other components (ix) Cooling tower FRP type with CT fan and 01 No makeup tank. (x) Other accessories such as controls, gauges etc
Item No 136 Contd.. (b) Package Type AC plant(Capacity : 15 Ton) (i) 3x7.5 Ton packager type unit ( 2x7.5 Ton in operation and 1x7.5 Ton as stand by) (ii) Condensing Unit 3 Nos Air cooled (02 Nos in operation and 01 No as stand by) (iii) Piping system from compressor to condenser (iv) Electric panel including all controls and wiring (v) Control devise and other components (c) Central AC plant ( capacity: 36 Ton) (i) AC Compressor Model SMC 6x65, 3x18Ton ( 2 x 18 Ton in operation and 1 x 18Ton as stand by) (ii) Condensing Unit 3x18Ton (02 Nos in operation and 01 No as stand by) (iii) 1x36Ton capacity weather making unit of Air conditioning including humidifier and Dehumidifier. (iv) 3x25 HP compressor motor (2 Nos in operation and 01 No as stand by) (v) 2Nos mono block pump sets of 5HP capacity for condenser water including water pipe & plumbing (Make KIRLOSKAR) (vi) 1 No cooling tower. (vii) Bank of heaters (viii) Electric panel including all controls and wiring (ix) Blower motor 7.5HP (x) Control devise and other components
Manning and Operation of package type Air Condition Plant of capacity 10 Ton and 27.4 Ton and 320 KVA DG Set installed at UAV Hanger at Bathinda Mil Stn in two shifts per day (each shift of 8 hours continuous duration operated by one operator in each shift) including cleaning of AC Plants/DG Set comprising of compressors, motors, condensers, electric panel, instruments, starters, strip heaters,alternator,fuel tank and control cabling/wiring all as specified and directed by Engineer-in-Charge for smooth and efficient performance of AC Plant/DG Set to achieve desired inside condition through out the currency of contract. Brief description of each plantis as given below ( Work lies in Unrestricted area) :- (a) Package type of Capacity : 10 Ton ) (i) 3x5 Ton packager type unit ( 2x5 Ton in operation and 1x5 Ton as stand by) (ii) Condensing Unit 3 Nos Air cooled (02 Nos in operation and 01 No as stand by) (iii) Piping system from compressor to condenser (iv) Electric panel including all controls and wiring (v) Control devise and other component (b) Package type of Capacity :27.4 Ton (i) 3x13.7 Ton packager type unit ( 2x13.7 Ton in operation and 1x13.7 Ton as stand by) (ii) Condensing Unit 3 Nos Air cooled (02 Nos in operation and 01 No as stand by) (iii) Piping system from compressor to condenser (iv) Electric panel including all controls and wiring (v) Control devise and other components
Aman Enterprises
M/s Luxmi Constructions
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .