Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹1.5 L+₹3,000.01 (2.04%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹1.5 L+₹4,500.02 (3.06%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
24 Sept 2026, 6:55 pmClosed
Executive Engineer REW Division Poonch
Executive Engineer REW Division Poonch
Please refer to Boq
2026_RDPR_324852_5
e-NIT No. 115 of REW Poonch 2026-27 Dated 16-09-2026
Open Tender
Civil Works
Percentage
30 days
poonch
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Engineer REW Division Poonch
₹3,000
6 Oct 2026
16 Sept 2026
25 Sept 2026
16 Sept 2026
24 Sept 2026
16 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m
in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and
ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as
directed:All kinds of soil : | 2.04 | cum | 479.3 | ₹977.77 |
| 2 | 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 0.85 | cum | 4,826.5 | ₹4,102.53 |
| 3 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcemen::1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 5 | cum | 9,395.7 | ₹46,978.5 |
| 4 | Reinforced cement concrete work in beams, suspended floors, roofs having slope upto 15°, landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases upto five level including curing but excluding the cost of centring, shuttering, finishing and reinforcement with 5.3.1 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 0.8 | cum | 9,821.85 | ₹7,857.48 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for:Walls (any thickness) including attached pilasters, buttresses, plinth and
string courses etc. | 34.56 | SQM | 628.95 | ₹21,736.51 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platforms. | 3.93 | SQM | 718.2 | ₹2,822.53 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Edges of slabs and breaks in floors and walls
Under 20 cm wide | 19.51 | RM | 262.2 | ₹5,115.52 |
| 8 | 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 fine sand) | 33.82 | SQM | 283.8 | ₹9,598.12 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level : Mild steel and medium tensile steel bars | 367 | KG | 115.35 | ₹42,333.45 |
| 10 | Distempering with dry distemper of approved brand and manufacture (two or more coats) and of required shade on new work, over and including water thinnable priming coat to give an even shade | 19.12 | SQM | 127.95 | ₹2,446.4 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.91 MB
BOQ_1096189.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .