Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.4 LAccepted-AOC | ₹2.4 L | 1 | Accepted-AOC l1 |
| 2 | 2₹2.6 LRejected-Finance | ₹2.6 L | 2 | Rejected-Finance 2 |
Tender Value
Refer Docs
EMD Value
₹30,000
Closing Date
21 Apr 2026, 12:00 pmClosed
EE PD PWD HAPUR
EE PD PWD HAPUR
Painting and repair work for the Meeting Hall Veranda and Offices of the Tehsil Building Hapur under non-residential buildings in District Hapur
2026_CEMRT_1137428_4
512/3A DTAE 19.03.2026
Open Tender
Civil Works - Buildings
60 days
HAUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹767
₹30,000
Yes
8 Jun 2026
16 Apr 2026
21 Apr 2026
16 Apr 2026
21 Apr 2026
16 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing dry or oil bound distemper, water proofing cement paint and the like by scrapping, sand papering and preparing the surface smooth including necessary repairs to scratches etc. complete. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.DSR 2023.13.91 | - | sqm | - | - |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.DSR 2023.15.3 | - | cum | - | - |
| 3 | Repairs to plaster With cement mortar 1:4 (1 cement : 4 Coarse sand) of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-Charge.Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR2023.14.1.2 | - | sqm | - | - |
| 4 | Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete. with approved quality material of Berger/J.K./ Birla or similar. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.13.80 | - | sqm | - | - |
| 5 | Distempering with 1st quality acrylic distemper (ready mixed) having VOC content less than 50 gms/litre, of approved manufacturer, of required shade and colour complete, as per manufacturer's old work (two or more coats) Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2021.13.108.1 | - | sqm | - | - |
| 6 | Finishing walls with Acrylic Smooth exterior paint of required shade : Old work (Two or more coat applied @ 1.67 ltr/ 10 sqm)on existing cement paint surface Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.13.111.1 | - | sqm | - | - |
| 7 | Painting with synthetic enamel paint of approved brand and manufacture of required colour to give an even shade : One or more coats on old work Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. paint to be used should confirem the ISI No. 103-1950 . DSR 2023.13.99.1 | - | sqm | - | - |
| 8 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources) Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.3 | - | cum | - | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for Suspended floors, roofs, landings, balconies and access platform.Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST. DSR 2023.5.9.3 | - | sqm | - | - |
| 10 | Steel reinforcement Mild steel and Medium Tensile steel bars for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete Above plinth level. Including cost of, all material, Bitumen, labour, T&P, royality, all taxes and labour cess complete. But excluding GST.DSR 2023.5.22.1 | - | Kg | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.75 MB
Tendernotice_2.pdf
PDF • 2.07 MB
BOQ_2124017.xls
BOQ • 1.22 MB
Download all tender documents and submit your bid