Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹22.5 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹24.5 L+₹1.7 L (7.55%)Rejected-Finance 131 SHINGANAPUR ROAD KOLKI KOLKI SATARA MAHARASHTRA 415523 | SATARA | MAHARASHTRA | 415523 | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹26.9 L+₹4.1 L (17.9%)Rejected-Finance | L3 | Rejected-Finance Other than L1 |
| Sl No | Description | Qty | Unit | M/s Hanspal Enterprises L1 | SHYAM AND SONS ENTERPRISES L3 | VISHAL TRADERS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Carrying out maintenance of Central AC plants water cooled microprocessor based having scroll compressor,chilled water system type installed in tech area & WSA area of capacity and location mentioned below by regular maintenance by a trained mechanic/ OEM rep as and when required (on order) for checking /rectifying defects to make the plant in serviceable condition within 72 hours in case of Major break down, alongwith all tools ,brazing tools and materials electrical testing tools etc to make plant serviceable including setting of in/out temperature of microprocessor control panel and also required dismantling ,refixing ,serviceable parts and replacing of defective parts ( New parts shall be measured and paid seperately and paid under respective item of " Sch A" as Supply only) complete all as specified and directed.AC Plant of capacity 3X25 TR at DB -02 & 03.
NOTE : -The work per unit includes :-
(i)checking of proper functioning of microprocessor and all its parameters are as specified if any error ,resetting as per design condition
(ii) checking repairing of control wiring
(iii)checking /setting of water flow switch ,HP & LP switch
(iv) Checking of refrigerant gas pressure and oil level in compressor
(v) functioning of chiller & condensor with design parameter
(vi)Functioning of compressors , charging of ref gas with provn of all T&P
(viii) all other functioning of control parameter of AC plants required for achieving design parameter of conditioned space. | 6 | Each Job per month | 1,400 ₹8,400 Lowest | 2,000 ₹12,000 | 1,899 ₹11,394 |
| 1.01 | All as per Item no 1 here in before but plant capacity 2X11 TR at DB-01 complete all as specified and directed. | 6 | Each Job per month | 1,400 ₹8,400 Lowest | 1,750 ₹10,500 | 1,899 ₹11,394 |
| 1.02 | All as per Item no 1 here in before but plant capacity 2X37.5 TR at DB-10 complete all as specified and directed. | 6 | Each Job per month | 1,400 ₹8,400 Lowest | 2,500 ₹15,000 | 1,899 ₹11,394 |
| 1.03 | All as per Item no 1 here in before but plant capacity 2X25 TR at DB-11 complete all as specified and directed. | 6 | Each Job per month | 1,400 ₹8,400 Lowest | 2,000 ₹12,000 | 1,899 ₹11,394 |
| 1.04 | All as per Item no 1 here in before but plant capacity 3X37.5 TR at Spl garrage complete all as specified and directed. | 6 | Each Job per month | 1,400 ₹8,400 Lowest | 2,500 ₹15,000 | 1,899 ₹11,394 |
| 1.05 | All as per Item no 1 here in before but plant capacity 3X25 TR heat pump type at 2232 sqn complete all as specified and directed. | 6 | Each Job per month | 1,400 ₹8,400 Lowest | 2,500 ₹15,000 | 1,899 ₹11,394 |
| 1.06Supply only the following Item of AC Plant mentioned here in before to fixed under Item sr No. 1.01 to 1.05 complete all as specified and directed | ||||||
| 1.07 | Temperature sensor for chiller machine as per sample complete all as specified and directed | 8 | Each | 1,800 ₹14,400 | 1,750 ₹14,000 Lowest | 2,499 ₹19,992 |
| 1.08 | Water flow switch of model HFS -25 OF Synergy, Honeywell or as directed by EIC. | 8 | Each | 2,200 ₹17,600 Lowest | 2,670 ₹21,360 | 2,499 ₹19,992 |
| 1.09 | LP/HP control switch as per sample | 8 | Each | 250 ₹2,000 Lowest | 3,000 ₹24,000 | 299 ₹2,392 |
Tender Value
₹29.1 L
EMD Value
₹58,280
Closing Date
18 Oct 2025, 6:00 pmClosed
CWE (AF) BAREILLY
HQ Commander Works Engineers (AF) Military Engineer Services Bareilly 243002
As described in BOQ
2025_MES_732070_1
81557/E8
Open Tender
Electrical and Maintenance Works
Item Rate
180 days
GE (AF) BKT
As per NIT
9 documents required · 9 mandatory
₹500
GE (AF) BKT
₹58,280
15 Dec 2025
22 Sept 2025
27 Oct 2025
22 Sept 2025
18 Oct 2025
6 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.66 MB
BOQ_819627.xls
BOQ • 0.40 MB
81557Tender22092025.pdf
Tender Documents • 1.41 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .