Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.9 LAccepted-AOC HOUSE NO 251 E BLOCK ADARSH NAGAR BALLABHGARH FARIDABAD PIN 121004 HARYANA | FARIDABAD | FARIDABAD | HARYANA | 121004 | L1 | Accepted-AOC L1 | |
| 2 | L2₹42.9 L+₹2.0 L (5.01%)Rejected-Finance TP 117 2ND FLOOR MAURYA ENCLAVE PITAMPURA DELHI 110034 | DELHI | DELHI | DELHI | 110034 | L2 | Rejected-Finance Other than L1 | |
| 3 | L3₹46.6 L+₹5.8 L (14.2%)Rejected-Finance 205 PARSHAV VIHAR PLOT NO 50 1 P EXTN PATPARGANJ DELHI 110092 | DELHI | EAST DELHI | DELHI | 110092 | L3 | Rejected-Finance Other than L1 |
Tender Value
₹59 L
EMD Value
₹1.1 L
Closing Date
14 Dec 2022, 6:00 pmClosed
CWE NO 2 DELHI CANTT-10
HQ CWE NO 2 DELHI CANTT-10
COMPREHENSIVE MAINTENANCE INCLUDING REPAIR/REPLACEMENT OF PARTS OF FIRE DETECTION AND ALARM SYSTEM INSTALLED AT RESTRICTED AREA (NBC) UNDER GE E/M BASE HOSPITAL DELHI CANTT-10
2022_MES_563583_1
CWE/BH-38/2022-23
Limited
Civil Works - Others
Item Rate
330 days
RESTRICTED AREA
As per Tender Documents
9 documents required · 9 mandatory
₹1,000
GE E/M BASE HOSPITAL DELHI CANTT
₹1.1 L
Yes
11 Jan 2023
17 Nov 2022
16 Dec 2022
17 Nov 2022
14 Dec 2022
8 Dec 2022
Amount
Comprehensive maintenance and repair including renewal/replacement of defective parts/devices of UL listed/ certified microprocessor based Fire Detection and Alarm system installed in the New Building Complex at Cabinet Sectt round the clock including Saturday, Sunday & Holidays by deploying minimum numbers of trained and qualified manpower. Details of Equipment & devices to be operated is as under: - (i) Fire Alarm Control panels (Model : NFS2-640, Make- Notifier), 2 loop, 159 device in each loop - 15 Nos (ii) Fire Alarm repeater panels (Make- Notifier)- 02 Nos (iii) PA system with Telephone (DAA-50 series, output power 50W) - 15 Nos (iv) Telephone unit - 28 Nos (v) smoke detector ( make- notifier) -3195 Nos (vi) Heat detectors (Make- Notifier) -104 Nos (vii) Control Modules (Model : FCM-01, Make- Notifier) - 250 Nos (viii) Manual call point - 116 Nos (ix) Response Indicators (Make- Notifier) - 1634 Nos (x) Monitor Modules (Model : FMM-01, Make- Notifier) - 57 Nos (xi) Sounder - 211 Nos (xii) Relay Module (Model : FRM-01, Make- Notifier) - 124 Nos (xiii) Beam detector - 10 Nos (xiv) Battery, 12 Volt, 7 AH - 15 Nos (xv) All connecting/control wiring for above devices (In all 29 Loops) (xvi) All those items related with Fire detection & Alarm system installed at site but not specified in the above list are also included in the comprehensive maintenance.
NOTES FOR ITEM NO 1: - (i) The spares and labour for any Major & minor repairs/replacement of fire alarm control panels, repeater panels, smoke detectors, heat detectors, beam detectors, manual call points, sounders, network card, any type of modules (control module, relay module and monitor module), fire fighter's telephone handset and jacks, PA system, connecting wires control wires, conduits as and when required shall be provided by the contractor without any extra cost to department and rates for the same shall deemed to be included in the quoted unit rate. Only new parts shall be incorporated in the work and repaired parts shall not be reused in the work. (ii) Unserviceable devices mentioned in item no 01 (iv to xii) will be replaced (upto 5% of total numbers) and in addition battery and beam detector shall be replaced as per site requirement. Cost of new devices is deemed to be included in quoted rate. (iii) Old/unserviceable parts shall be property of Contractor. However, these shall not be reused in work and deposited in MES Store Yard at the time of replacement. The unserviceable parts shall be returned to contractor after sucessful completion of work. (iv) The cost of Re-Progamming / formatting / Data Entry of Fire alarm control Panel shall deemed to be included in the quoted unit rate. (v) All material to be purchased directly from Authorized Distributor only and the same shall be inspected by technitian in the presence of Engineer-in-charge before installation. (vi) The following technicians shall be deployed by the authorised dealer for comprehensive maint through Contractor with minimum three years experience in operation of Fire Alarm & Detection System. Salary/Cost of these Technicians shall be borned by the contractor. (a) First Shift- 0600 hrs to 1400 hrs -Two technician. (b) Second Shift- 1400 hrs to 2200 hrs -Two technician. (c) Third Shift- 2200 hrs to 0600 hrs -One technician.
NOTES FOR ITEM NO 1 (Contd...): - (vii) The contractor will maintain complaint slip for each complaints and maintain a complaint register. After rectification of fault/complaint on complaint slip duly signed by JE/MES rep . (viii) All complaints/Breackdown shall be attended/rectified by the Contractor within 08 Hours. Failing which a recovery of Rs 1500/- per complaint per day shall be made from contractor's dues subject to a maximum of 10 days. (ix) In case of any break down/inspection, any additional manpower required shall be arranged by the contractor without any extra cost to the Govt. (x) The staff deployed for comprehensive maintenance of the installations shall not leave the fire detection and alarm system room under any circumstances before handing over the charge to next shift duty otherwise a penality of Rs 1000/- per shift per day shall be recovered from contractors dues. (xi) Police Verification of the employees shall be provided by the contractor without any extra cost to Deptt. (xii) All operator/technician shall wear proper uniform, failing which a recovery of Rs 200/- per shift per person shall be recovered from the contractor's dues. (xiii) The contractor shall provide all the necessary T&P and stationery such as Attendance Register, Periodical Maintenance Register, log book etc to the operator without any extra cost to Deptt. (xiv) The regular and periodical cleaning/ routine checking/ testing and adjusting the detectors shall be carried out by the Contractor in planned and systematic manner for efficient and smooth functioning of system. (xv) All regular/ periodic inspection, testing and commissioning including preventive maintenance shall be carried out by the Contractor as per IS 2189 : 2008 with latest amendments and as recommended by the manufacturers.
NOTES FOR ITEM NO 1 (Contd...): - (xvi) Repair/ Servicing /Replacing of the equipments/ devices & other items related with fire alarm system shall be carried out by the staff deployed by the contractor at without any extra cost to deptt. (xvii) The service Engineer shall visit the site 3 to 4 times in contract period for inspection and shall submit inspection report to the Engineer-in-charge. Necessary repair action shall be taken immideately if/as required. (xviii) Specification of spares parts shall be all as per existing make and model. (xix) Cost of fixing, testing, commisioning of any particular item (if required) shall be provided by the contractor without any extra cost to department. (xx)The contractor shall provide suitable reliever as per labour rules & regulations and the rates for which are deemed to be included in the quoted rate. (xxi) Contractor should obtain the fire safety inspection report (Fire & Life safety certificate) from the state fire inspection authority for complete building in consultation with Engineer - in- charge within first three month from the date of commencement of the contract.
GLIBS CONSTRUCTION
SANJEEV ENTERPRISES
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .