| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹7.1 L+₹1,401.24 (0.20%)Rejected-AOC | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Sarathi L1 | RGT INFRAA L2 |
|---|---|---|---|---|---|
| 1.00 | Earth Work excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete 1st depth | 25.92 | cum | 260 ₹6,739.2 Lowest | 275.97 ₹7,153.14 |
| 2.00 | P.C.C 1:4:8 MIX Using 40mm ISS HBG metal including cost and conveyance of all etc., complete | 3.24 | cum | 5,200 ₹16,848 Lowest | 5,400.64 ₹17,498.07 |
| 3.00 | Supplying and erecting centering shuttering including necessary supports for plane Upto Basement | 18 | cum | 540.64 ₹9,731.52 Lowest | 547.5 ₹9,855 |
| 4.00 | Supplying and erecting centering shuttering including necessary supports for plane Above Basement | 138 | sqm | 1,095 ₹1,51,110 Lowest | 1,095 ₹1,51,110 Lowest |
| 5.00 | Supplying and fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, complete complying with standard specification | 1.42 | kgs | 91,865.86 ₹1,30,449.52 Lowest | 91,865.86 ₹1,30,449.52 Lowest |
| 6.00 | R.c.c 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete | 31.28 | cum | 9,233.74 ₹2,88,831.39 Lowest | 9,233.74 ₹2,88,831.39 Lowest |
| 7.00 | GST 18% | 1 | No | 1,08,667.73 ₹1,08,667.73 Lowest | 1,08,881.48 ₹1,08,881.48 |
Tender Value
Refer Docs
EMD Value
₹7,210
Closing Date
11 Sept 2025, 3:00 pmClosed
Block Development officer,Walajah
Block Development office,Walajah
Construction of RCC compound wall Left side at Walajah Block office
2025_RDTN_600961_1
A2/1661/2025
Open Tender
Civil Works
Works
30 days
Block Development office, Walajah
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹7,210
30 Sept 2025
6 Sept 2025
11 Sept 2025
6 Sept 2025
11 Sept 2025
6 Sept 2025
Amount
Earth Work excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete 1st depth
P.C.C 1:4:8 MIX Using 40mm ISS HBG metal including cost and conveyance of all etc., complete
Supplying and erecting centering shuttering including necessary supports for plane Upto Basement
Supplying and erecting centering shuttering including necessary supports for plane Above Basement
Supplying and fabrication and placing in position mils steel or ribbed for all reinforced cement concrete works as per the design given including cost of steel and binding wire in all floors etc, complete complying with standard specification
R.c.c 1:1.5:3 mix using 20mm ISS HBG metal including cost and conveyance etc., complete
RGT INFRAA (BID ID -1455957)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_718363.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .