Loading…
Loading…
Tender Value
₹9.8 L
EMD Value
₹25,000
Closing Date
28 Sept 2026, 5:00 pm6d left
Directorate of Municipal Administration
PRAKASHA E
Construction of mezzanine flooring inside the primary shed of the Material Recovery Facility constructed at the Solid Waste Disposal Unit under the Swachh Bharat Mission 2.0 project of Harihar Municipal
DMA/2026-27/PM/WORK_INDENT62503
DMA/2026-27/PM/WORK_INDENT62503
Open
Plants and Machinery
Electronic Documents, First(One Cover)
DMA City Municipal Council Harihara
5 documents required · 5 mandatory
₹500
₹25,000
20 Sept 2026
20 Sept 2026
26 Sept 2026
Construction of mezzanine flooring inside the primary shed of the Material Recovery Facility constructed at the Solid Waste Disposal Unit under the Swachh Bharat Mission 2.0 project of Harihar Municipal
Providing and fixing Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural ...
Supplyingof1440rpmheavydutyexhaustfanwithbracketbladessuitable to operate on 230V 50Hz, AC Supply complete.15" Sweep (450 mm).(Vol-06 SR-2023-24 P No.30 Item NO-6.2.2)
Supplyingwallmountingfansuitabletooperateatsingle-phase230v AC. supply.400 mm Sweep.(Vol-06 SR-2023-24 P No.30 Item NO-6.5.2)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
IND62503.doc
Tender Document • 1.56 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .