| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.1 LAccepted-AOC | L1 | Accepted-AOC Agreement with L1 | |
| 2 | L2₹23.5 L+₹40,487.20 (1.75%)Rejected-AOC | L2 | Rejected-AOC Agreement with L1 |
Tender Value
₹23 L
EMD Value
₹46,000
Closing Date
13 Mar 2021, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Ex. Eng. Meerut Division Ganga Canal, Meerut
Office of Ex. Eng. Meerut Division Ganga Canal, Meerut
11/EE/2020-21 Construction of VRB at km. 5.229 of Sardhana Drain (Lot-5)
2021_UPIDC_558122_9
11/EE/2020-21
Open Tender
Civil Works - Canal
Piece-work
60 days
As per tender notice
As per tender notice
2 documents required · 2 mandatory
₹2,354
₹46,000
27 Jun 2021
8 Mar 2021
15 Mar 2021
8 Mar 2021
13 Mar 2021
8 Mar 2021
90 days
Amount
Earth work in embankment for making bundha and ramp with ordinary soil carried from average lead upto 1.0 km by power transport and lift upto 1.50 m with manual compaction and rough dressing etc complete.
Earth work in excavation for diversion in all type of soil with lead 30 m and lift 1.50 m including proper disposal of surplus earth as directed by the Engineer in charge.
Surface dewatering including cost of all arrangements, material, labour, T&P etc.
Earth work in excavation of foundation in all type of soil with lead 30 m and lift 1.50 m including proper disposal of surplus earth as directed by the Engineer in charge.
Laying CC 1:3:6 with well graded stone ballast 22.5-45 mm size including cost of material, labour, T&P etc.
First class brick work in 1:4 CM including cost of all material, labour, T&P etc.
First class brick work in 1:3 CM including cost of all material, labour, T&P etc.
Struck deep cement pointing in CM 1:2 including cost of all material, labour, T&P etc.
Laying 1st class brick on edge soling including all cost of material, labour, T&P etc.
Ordinary centering and shuttering for RCC work
Providing steel reinforcement including cost of material, labour, T&P, bending, binding and placing in position complete.
S/Filling expansion joint with 25mm thick thermocoal sheet including all cost of material, labour, T&P etc.
S/Laying bitumen tarfelt sheet including all cost of material, labour, T&P etc.
S/PVC drainage pipe 600 mm long and 75 mm dia including all cost of material, labour, T&P etc.
Laying RCC 1:1.5:3 with well graded stone ballast 5.6-22.5 mm size including cost of material, labour, mechanical compaction, T&P etc.
Laying CC 1:1.5:3 with well graded stone ballast 5.6-22.5 mm size including cost of material, labour, mechanical compaction, T&P etc.
Removing Bundha and Diversion including proper disposal and dressing etc.
Supply and Fixing name year plate including writing data etc. cost of all meterial, labour, T&P etc. complete.
M/S G R D CONTRACTOR AND SUPLIER
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .