| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹10.4 CrAccepted-AOC | ₹10.4 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹10.6 Cr+₹20.8 L (2.00%)Rejected-Finance 78 Q J N LAHIRI ROAD SERAMPORE HOOGHLY | SERAMPORE | HOOGHLY | WEST BENGAL | 712201 | ₹10.6 Cr+₹20.8 L (2.00%) | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹10.7 Cr+₹26.1 L (2.51%)Rejected-Finance WEST BENGAL INDIA | DARJEELING | WEST BENGAL | 734001 | ₹10.7 Cr+₹26.1 L (2.51%) | L3 | Rejected-Finance L3 BIDDER |
| 4 | L4₹10.7 Cr+₹31.3 L (3.01%)Rejected-Finance 296 1 2 BANGUR AVENUE BLOCK B KOL 700055 | KOLKATA | KOLKATA | WEST BENGAL | 700055 | ₹10.7 Cr+₹31.3 L (3.01%) | L4 | Rejected-Finance L4 BIDDER |
Tender Value
₹10.4 Cr
EMD Value
₹10 L
Closing Date
13 Sept 2025, 1:00 pmClosed
DIRECTOR GENERAL (PLANNING_DEVELOPMENT)
19, NELLIE SENGUPTA SARANI, KOLKATA 700 087
Supplying and laying of 150 mm, 350 mm and 500 mm diameter MS distribution main from Ajaynagar BPS 1 and 2
2025_KMC_886628_1
KMC/P_D/83/2025-26 (1st Call)
Open Tender
CIVIL WORKS
Percentage
60 days
from Ajaynagar BPS 1 and 2
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹10 L
OFFICE OF THE DIRECTOR GENERAL (PD)
20 Apr 2026
2 Aug 2025
17 Sept 2025
2 Aug 2025
13 Sept 2025
13 Aug 2025
7 Aug 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete.
(a) Depth of excavation not exceeding 1,500 mm. | 8,581.05 | % cum. | 11,927 | ₹10,23,46,183.35 |
| 2 | Hire and labour charges for shoring work(including necessary close plank walling, framing, Eucalyptus/Jhoubullapiling, strutting etc) complete as per direction of the Engineer-in-charge for foundation excavation(vertical surface are incontact with supportedearth is tobemeasured.) (This item should be executed on specific direction of the Enginner in charge).
(a) Depth upto 1.5 m. | - | Sqm | 386 | - |
| 3 | Cutting & picking up existing metalled black top portion of road surface to an average depth of 300mm by using jack hammer with all necessary tools & plants including screening the serviceable materials & stacking with in a lead of 75mtr all complete as per direction of the Engineer in charge. | 1 | cum. | 636 | ₹635.36 |
| 4 | Lowering M.S pipes & specials in trench up to a depth of 3.00 metre below G.L, laying and jointing the same inside the trench / over ground by means of electric arc welding using standard electrodes as per l.S. specification, all complete as per direction of the Engineer-in-charge.
[The Engineer-in-charge shall approve the electrodes for arc welding
before use. (For laying over ground, the rates shall be reduced by 10%
and that is inclusive of holding arrangements) ]
150 mm dia. | 3,366 | % mtr. | 1,878 | ₹63,21,348 |
| 4.1 | 350 mm dia | 2,134 | % mtr. | 5,862 | ₹1,25,09,508 |
| 4.2 | 500 mm dia | 1,532 | % mtr. | 5,544 | ₹84,93,408 |
| 5 | Carriage of CI/ DI/ ERWMS/ AC pipes including loading into truck at the lifting point, unloading at destination and stacking properly in godown or yard etc. as directed (including carriage by head load upto 30 metres at each of the two points. The rate covers all the above operations, actual transport all complete).
Upto 5 KM: (876) For 150 mm Dia Pipe | 3,366 | % Metre | 435 | ₹14,64,210 |
| 5.1 | 350 mm dia | 2,134 | % Metre | 1,739 | ₹37,11,026 |
| 5.2 | 500 mm dia | 1,532 | % Metre | 2,898 | ₹44,39,736 |
| 6 | Gas cutting of M.S. pipes and/or M.S. plates of different thickness all complete as per specification and direction of the Engineer-in-Charge.
8 mm thick | 0.32 | mtr. | 213 | ₹68.16 |
stage.html
html • 0.05 MB
technical_1999743.pdf
techsummary_1999743.pdf
finance_1999743.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.26 MB
techbid.pdf
Tender Documents • 2.19 MB
finbid.pdf
Tender Documents • 0.74 MB
BOQ_1999743.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .