Tender Value
₹38 L
EMD Value
₹38 L
Closing Date
28 May 2022, 2:15 pmClosed
Superintending Engineer TEDC Tuticorin
131,132, Ettayapuram Road, Tuticorin
Execution of works under RDSS scheme for Agriculture Feeder Segregation (FY 2022 -2023) in 11KV Kannam feeder of 33/11KV Kurumbur SS in Kurumbur section of Tiruchendur division of Tuticorin Electricity Distribution Circle
2022_EB_233337_1
WC-011/2022-2023 KANAM FEEDER KURUMBUR SECTION
Open Tender
Electrical Works
Item Rate
120 days
Tuticorin
Refer Tender Document
2 documents required · 2 mandatory
₹0
₹38 L
Yes
4 Jun 2022
21 May 2022
30 May 2022
21 May 2022
28 May 2022
21 May 2022
21 May 2022 - 28 May 2022
Amount
Excavation of Stay pit 4.5' to 5' depth by using JCB or manual
Excavation of pole pit upto 8 mtr PSC poles by using JCB or manual
Excavation of pole pit upto 9.14 mtr Pole by using JCB or manual
Excavation of RSJ pole pit above 36' by using JCB or manual
Erection of 8 mtr PSC poles by using JCB or maual
Erection of 9 mtr PSC poles by using JCB or maual
Erection of RSJ Rail, fabricated poles above 36'-0' by using JCB or maual
Erection of stay set complete
Fixing of 3.6" "V" cross arms(all types) / channel cross arms/ guarding Cross arms
Fixing of Tapping Channel Cross arms
Fixing of LT 3 phase cross arms
Fixing of LT Single phase cross arms
Fixing of HT/LT TI Fittings
Fixing of pin Insulators with Pin 11 KV
Fixing of 11 KV strain disc.
Fixing of LT pin Insulator with pin
Fixing of LT shackle
Fixing of Aluminium Knob
Earthing of pole with pin including burying looping and binding
Paving of Conductor, stringing, binding Jumpering etc., complete with 7/4.09ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/3.35 mm ACSR for both HT/LT lines with LC work.
Paving of Conductor, stringing, binding Jumpering etc., complete with7/2.59 mm ACSR for both HT/LT lines with LC work.
Concreting of Poles as per Board standards (2*2*5). The material such as sand, jelly, etc., have to be supplied by contractor including Cement supplied by Contractor (Cement concrete mix 1:4:8 using 40mm hard broken stone including cost of labour Charges for placing Transporting of Sand, jally, from box and water curing etc,. complete as per field Engineer's instructions.
Erection of Single Pole Transformer structure complete in all respects with wiring Earthing, fixing of open type fuse units, HT/LT/LAS and jumpering 3 Nos. Earth pits with tubs including painting of metal parts, structure poles, fixing of top channel seating channel, belting angle (Except erection of Transformer)
Flat guarding arrangement 4wire
Transport of poles/Materials/ conductors and other materials from store to site ( for Hired Vehicle) beyond 20KM
Loading/Unloading of poles upto 8 mtr PSC poles
Loading/Unloading of poles upto 9 mtr PSC poles & RCC Square Pole
Loading/Unloading of poles above 36'-0' RSJ pole
Transporting of 8mt poles from road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of 9.0mt poles & 9.0mt RCC Square Pole from road site to pole pit including loading and unloading of poles by using JCB or manual
Transporting of poles above 36'-0' RSJ polefrom road site to pole pit including loading and unloading of poles by using JCB or manual
Loading or unloading of Transformer upto 200 KVA for each
Transporting of Distribution Transformer beyond 20KM
Erection of New Transformer upto 200 KVA
Dismantling of 7/2.59sq.mm ACSR with LC work
Dismantling of 9 mt Poles
Dismantling of 3phase X arm
Dismantling of Sphase X arm
Removing the HT Disc Insulators with Metal parts
Removing the HT pin Insulators with pin
Removing the LT pin Insulators with pin
Removing of shackle
Erection of street light switch point arrangement
Releasing of Street light and re-fixing.
Releasing of single phase service and re-fixing.
Releasing of 3 phase service and (upto 50 HP) re-fixing.
Erection of D.P. structure with AB switch top channel, cross bracing, HG fuse set, earthing, painting, providing stay and pole concreting as per field Engineer's instructions.
Alteration of Back clamp
Alteration of Stay clamp
Fixing of DT Metering Labour charges
Dismantling and Reerection of Stay set complete
Provision of Distribution Transformer Name Board (Name of the 22/11KV #, Name of the SS, Capacity, Danger Board.)
Cutting of coconut leaves (per tree)
Drilling of hole in channel only 3/4" & 1" per hole
Cutting of flat
Cutting of channel
Cutting of Angle
Drilling ,Laying and Termination of the 3x300 sqmm UG cable for Railway crossing
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .