Loading…
Loading…
Tender Value
₹49.2 L
EMD Value
₹4.9 L
Closing Date
5 Oct 2026, 11:00 am
Executive Engineer.
Executive Engineer Minor Irrigation near dhanipur block g.t road Aligarh.
CONSTRUCTION OF CHECKDAM /ANICUT VILLAGE SHORAI MARHARA ETAH
2026_UPMID_1185327_1
717_MI_DM_CD_02_09_2026_19_4
Open Tender
Civil Works
Item Rate
90 days
CONSTRUCTION OF CHECKDAM /ANICUT VILLAGE SHORAI M
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,590
Executive Engineer Minor Irrigation .
₹4.9 L
Yes
Aligarh
5 Oct 2026
14 Sept 2026
5 Oct 2026
14 Sept 2026
5 Oct 2026
14 Sept 2026
15 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | A. EARTH WORK IN EXCAVATION IN HARD SOIL ON BANK OF NALA INCLUDING 2 LEAD | 296.21 | M³ | - | - |
| 2 | A. EARTH WORK IN EXCAVATION UP TO BED OF NALA WITH 2 LEAD AND 5 LIFT ABOVE 1.50 M FOR EVERY 030M. LIFT OR PART THERE OF | 108.6 | M³ | - | - |
| 3 | REMOVAL OF SLUSH FROM BED OF NALA AND WING WALL WITH 2 LEAD AND 1 LIFT UP TO GROUND HEIGHT FOR EVERY 0.30 M .LIFT OR PART THERE OF | 302.17 | M³ | - | - |
| 4 | EARTH WORK IN EXCAVATION IN WET SOIL IN FOUNDATION OF CREST, WING WALL, CUT OF WALL APRON,AND FLOOR IN UP AND DOWN STREAM WITH 2 LEAD AND 10 LIFT OF UP TO GROUND HEIGHT FOR EVERY 0.30 M. LIFT OR PART THERE OF | 382.18 | M³ | - | - |
| 5 | PLAIN CEMENT CONCRETE IN 1:3:6 CEMENT COURSE SAND AND 40mm STONE BALLAST IN FOUNDATION OF WING WALL CREST FLOORS CUT OFF WALL ETC. INCLUDING SUPPLY OF MATERIAL AND LABOUR T&P ETC.REQUIRED FOR PROPER COMPLETION OF THE WORK | 268.52 | M³ | - | - |
| 6 | RENDUM RUBBLE/ KHANDA MASONARY WITH 1:4 CEMENT COURSE SAND MORTAR UP TO BED LEVEL WITH 20X20X20 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK | 126.77 | M³ | - | - |
| 7 | RENDUM RUBBLE/ KHANDA MASONARY IN SUPER STRUCURE WITH 1:4 CEMENT COURSE SAND MORTAR WITH 20X20X20 TO 25X25X25 SIZE KHANDA IN WING WALLS ,CREST WALL , PROTECTION WALLS INCLUDING SUPPLY OF ALL MATERIAL ,LABOUR AND T&P REQUIRED FOR PROPER COMPLETION OF WORK | 213.26 | M³ | - | - |
| 8 | CEMENT CONCRETE WORK IN 1:2:4 WITH CEMENT COURSE SAND AND 20 MM STONE BALLAST OVER SURFACE OF FLOOR WING WALL AND CREST WALL INCLUDING COST OF MATERIAL ,LABOUR AND T&P ETC. | 53.67 | M³ | - | - |
| 9 | 15 MM THICK PLASTER IN 1:3 CEMENT AND COURSE SAND MORTAR ON SURFACE OF UP STREAM SIDE CREST WALL,WING WALL,AND EXTENSION WALL INCLUDING SUPPLY OF ALL MATERIAL LABOUR AND T&P ETC. | 54.65 | M² | - | - |
| 10 | FLUSH/RAISED POINTING WITH 1:2 CEMENT AND COURSE SAND MORTAR ON SURFACE OF WING WALL CREST WALL SLOPPY WALL ETC. INCLUDING SUPPLY OF ALL MATERIAL , LABOUR AND T&P | 204.1 | M² | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 10.89 MB
BOQ_2230505.xls
BOQ • 0.33 MB
814SudhipatrDate.pdf
PDF • 1.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .