Loading…
Loading…
Tender ID
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹11.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹12.4 L+₹1.1 L (9.85%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹12.4 L+₹1.1 L (9.86%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹13.2 L+₹1.9 L (17.1%)Admitted-Finance | L4 | Admitted-Finance | ||
| 5 | L5₹13.5 L+₹2.3 L (20.3%)Admitted-Finance | L5 | Admitted-Finance |
Tender Value
₹18.1 L
EMD Value
₹36,100
Closing Date
23 Feb 2026, 4:00 pmClosed
Er Imtiaz Ahmed Mir (Executive Engineer)
OFFICE OF THE EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
Please Refer to BOQ.
2026_PWDJK_303525_2
e-NIT No.167 of 2025-26 Dated 16-02-2026
Open Tender
Civil Works
Percentage
90 days
SURANKOTE
Please Refer to Technical Bid as per Conditions of e-NIT.
2 documents required · 2 mandatory
₹860
EXECUTIVE ENGINEER PWD DIVISION SURANKOTE
₹36,100
25 Feb 2026
16 Feb 2026
24 Feb 2026
16 Feb 2026
23 Feb 2026
16 Feb 2026
Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas(exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size).
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering.All works upto plinth level in 1:3:6 (1 cement: 3 coarse sand: 6 graded stone aggregate 20mm nominal size) crushed with 30% stone.
RANDOM RUBBLE MASONRY Random Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand).
Dry random rubble masonry with hard stone in foundation and plinth:.With bond stone.
Stone filling and filling avialable excavated earth.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns.
Carriage of materials by mechanical transport including loading / unloading and stacking complete. Sand /Bajri Avg lead up to 30 kms avg.
Carriage of Stone Avg lead up to 5 kms avg.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.29 MB
BOQ_985593.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .