| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹45.3 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹45.6 L+₹32,156.74 (0.71%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹45.7 L+₹41,344.38 (0.91%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | Rejected-Technical | - | Rejected-Technical DISQUALIFIED |
Tender Value
₹45.9 L
EMD Value
₹91,900
Closing Date
27 Mar 2026, 5:00 pmClosed
GM(P)
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Construction of Boundary Wall of Shamshan Ghat in Village- Bhatta, YEA. WC-06
2026_YEIDA_1122864_22
YEA/GM(PROJECT)/2026/480 DT-27/02/2026
Open Tender
Civil Works
Fixed-rate
120 days
YAMUNA EXPRESSWAY INDUSTRIAL DEVELOPMENT AUTHORITY
Please refer Tender documents.
5 documents required · 5 mandatory
₹1,050
₹91,900
8 Oct 2026
11 Mar 2026
30 Mar 2026
11 Mar 2026
27 Mar 2026
11 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechnical means (hydraulic excavation) manual means in foundation trenches or drain (not exceeding 1.5 m in width) or 10 Sqm on plain including dressing of sides remaining bottom, lift upto1.5 m including getting out the excavated earth and disposal of surplus excavated soil as per direction of engg. in charge with in lead upto 50 m DAR 2.8.1 | 292.78 | Cum | 72.8 | ₹21,314.38 |
| 2 | Cement concrete with 4cm Guage Approved Stone ballast , Coarse Sand& Cement in the proportion of 8:4:1 including Supply of all material, Labour, Tools & Plants etc required for Proper completion of the work. UPPWD/SOR/281/P-17 | 10.29 | Cum | 5,820 | ₹59,887.8 |
| 3Centering and shuttering including strutting, propping etc. and removal of form for all heights : | |||||
| 3.01 | Foundations, footings, bases of columns, etc. for mass concrete. (DAR/5.9.1/Based on UPPWD/SOR-2020)) | 91.8 | Sqm | 181.65 | ₹16,675.47 |
| 3.02 | Lintels, beams, plinth beams, girders, bressumers and cantilevers. (DAR/5.9.5/Based on UPPWD/SOR-2020)) | 430.98 | Sqm | 326.1 | ₹1,40,542.58 |
| 3.03 | Columns, Pillars, Piers, Abutments, Posts and Struts. (DAR/5.9.6/Based on UPPWD/SOR-2020)) | 430.19 | Sqm | 426.8 | ₹1,83,605.09 |
| 4 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level. (DAR-18/5.33.1/Based on UPPWD/SOR-2020) | 54.78 | Cum | 7,743 | ₹4,24,161.54 |
| 5 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately).All works above plinth level upto floor V level. (DAR-18/5.33.1/Based on UPPWD/SOR-2020) | 27.1 | Cum | 8,622.7 | ₹2,33,675.17 |
| 6 | Steel rainforcement for R.C.C. work including straightening, cutting bending, placing in position and binding all complete upto plinth level. Thermo-mechanically treated bars/Cold twisted bars. (DAR/5.22.6/Based on UPPWD/SOR-2020) | 9,641.2 | Kg | 88.1 | ₹8,49,389.72 |
| 7 | M-150 brick work in 1:4 cement and Coarse sand mortar in foundation and plinth including supply of all material, labour and tools and plants. ect. required for proper completion of work . UPPWD/SOR/303+(305) | 80.65 | Cum | 4,950 | ₹3,99,217.5 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.96 MB
22.pdf
Tender Documents • 1.25 MB
BOQ_2093439.xls
BOQ • 0.29 MB
485.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .