| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.3 CrAccepted-AOC | ₹1.3 Cr Quoted ₹1.1 Cr | L1 | Accepted-AOC L1 BIDDER WITH ALL DOCUMENTS SUBMITTED |
| 2 | L2₹1.2 Cr+₹13.0 L (11.7%)Rejected-Finance PATHAKHERA AREA MADHYA PRADESH | DINDORI | MADHYA PRADESH | 481778 | ₹1.2 Cr+₹13.0 L (11.7%) | L2 | Rejected-Finance L2 BIDDER |
| 3 | L3₹1.3 Cr+₹19.9 L (17.9%)Rejected-Finance AR NEW FRIENDS COLONY GOSALA ROAD RAMGARH DISTT RAMGARH JHARKHAND POSTAL CODE 829122 | RAMGARH | RAMGARH | JHARKHAND | 829122 | ₹1.3 Cr+₹19.9 L (17.9%) | L3 | Rejected-Finance L3 BIDDER |
| 4 | L4₹1.5 Cr+₹34.9 L (31.4%)Rejected-Finance 496665 | RAIGARH | CHHATTISGARH | 496665 | ₹1.5 Cr+₹34.9 L (31.4%) | L4 | Rejected-Finance L4 BIDDER |
| 5 | L5₹1.5 Cr+₹34.9 L (31.5%)Rejected-Finance NTPC LIMITED EPROCUREMENT PORTAL | ₹1.5 Cr+₹34.9 L (31.5%) | L5 | Rejected-Finance L5 BIDDER |
Tender Value
₹1.9 Cr
EMD Value
₹2.4 L
Closing Date
5 Sept 2022, 5:00 pmClosed
STAFF OFFICER, CIVIL, HAZARIBAGH AREA
OFFICE OF THE GENERAL MANAGER, CCL, CHARHI, HAZARIBAGH AREA
Construction of approach road for weighbridge no 1 from main gate of Tapin North OCP
2022_CCL_253392_1
GM(H)/SO(C)/NIT/2022-23/36 Dated 13-08-2022
Open Tender
Civil Works - Roads
Item Rate
90 days
TNOCP, HAZARIBAGH AREA
As per NIT
5 documents required · 5 mandatory
₹2.4 L
13 Dec 2022
17 Aug 2022
6 Sept 2022
18 Aug 2022
5 Sept 2022
18 Aug 2022
18 Aug 2022 - 29 Aug 2022
Amount
PART-A (ROAD PORTION) Excavation for road work in soil with hy draulic excavatior of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead up to 1000 m (including royalty @ Rs. 24.00 per Cum but excluding watering, rolling and compaction) including Royalty @ Rs. 24.00 per cum, cost of watering, rolling and compaction
Granular sub base with coarse graded material (Table:- 400-2) (Construction of granular sub base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve athe desired density, complete as per clause 401) for grading - II material
Dry lean cement concrete sub base (Construction of dry lean cement concrete sub base over a prepared sub grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/cum, optimum moisture content to be determined during trial length construction, concrete strength no to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing)
Cement concrete pavement (Construction of unreinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compund, finishing to lines and grades as per drawing)
Construction of subgrade and earthen shoulders (Construction of sub grade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table no. 300-2) Rolling with smooth wheeled roller
Road marking with hot applied thermoplastic compund with reflectorising glass beads on bituminous surface (Providing and laying of hot applied thermoplastic compound 2.5 mm thic including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes
PART-B (DRAIN PORTION) Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth, 1.5m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50m and lift up to 1.5m, disposed earth to be levelled and neatly dressed. All kinds of soil
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete up to plinth level. Thermo-Mechanically Treated bars.
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete.
Total impact of GST for the purpose of CTC
SUJEET KUMAR SINGH
RAJESH KUMAR SHARMA
Santosh Kumar Singh
JAGESHWAR GOPE
Star Express Consultants Pvt. Ltd.
M/S VIKAS KUMAR SINGH
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .