Loading…
Loading…
Tender Value
₹50.5 L
EMD Value
₹4.5 L
Closing Date
29 Sept 2026, 12:00 pm7d left
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
Construction Work of 2x4x4 meter span culvert and approach road at Biharojpur on Uttar Gaon Biharojpur drain in Gram Sabha Sultanpur.
2026_CEUVZ_1187686_2
4562/SETender/jnp-gzp circle/26 Date-07-09-2026
Open Tender
Civil Works - Bridges
Percentage
180 days
JAUNPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.5 L
Yes
SE, JAUNPUR-GHAZIPUR CIRCLE PWD , JAUNPUR
19 Sept 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
29 Sept 2026
19 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation of structures as per drawing and technical specification including setting out construction of shoring and bressing of sides and bottom, back filling the and excavated earth to the extent required utilising the ramaining earth locally for road work in widening portion. SI No. 251 (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 450 | Cum | 60 | ₹27,000 |
| 2 | Providing and laying filter Material in raft and underneath pitching in slopes complete as per drawing and Technical specification. As per SI No. 15.5 (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 114.93 | Cum | 2,437 | ₹2,80,084.41 |
| 3 | Concrete with 4cm. Gauge approved stone ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials labour and tools and plants etc. required for proper completion for the work. As per SI No. 280 (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 14.33 | Cum | 5,615 | ₹80,476.99 |
| 4 | RCC Grade M30 using batching plant transit mixer & manual placing:-Concrete from sub-analysis of concrete Rate Using Batching Plant 15 Cum Capacity (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 178.34 | Cum | 8,180 | ₹14,58,810.98 |
| 5 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 17.5 | MT | 71,850 | ₹12,57,338.35 |
| 6 | Provindig and fixing of weep holes with 100mm dia P.V.C. pipe including supply of all materials labour tools and plants etc. complete work. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 68 | RM | 147 | ₹9,996 |
| 7 | Stone boulder pitching in apron including cost of materials, Labour T&P etc required proper complition of work (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 119.28 | Cum | 2,415 | ₹2,88,061.2 |
| 8 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from R.O.W. with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per TechnicalSpecification Clause 301.5 (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 3,100 | Cum | 67 | ₹2,07,700 |
| 9 | Providing laying and spreading Material on a prepared sub grade, adding cement @ 2% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base. (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 136 | Cum | 2,800 | ₹3,80,800 |
| 10 | Providing laying and spreading Material on a prepared sub base, cement @ 4% by weight to the spread Material manually mixing in place with rotavator and compacting with the road roller and OMC to achieve the desired uncomfined compressive strength and to form a layer of sub-base/base (Including all material, T&P, labour cess etc. but excluding G.S.T.) | 178.5 | Cum | 3,100 | ₹5,53,350 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.12 MB
Tendernotice_2.pdf
PDF • 14.77 MB
BOQ_2236551.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .