Tender Value
₹14.9 L
EMD Value
₹15,000
Closing Date
26 Oct 2023, 3:00 pmClosed
The Block Development Office, Karimangalam
The Block Development Office, Karimangalam
Can be seen in the tender documents
2023_RDTN_378890_1
Roc.No.1720-2023-A2 dt .10.2023.
Open Tender
Civil Works
Item Rate
120 days
The Block Development Office, Karimangalam
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹15,000
Yes
26 Oct 2023
16 Oct 2023
26 Oct 2023
16 Oct 2023
26 Oct 2023
16 Oct 2023
Amount
Providing water supply 30000Lit OHT Tank @ Rajikottai H/o Indamangalam 2023 - 2024 Karimangalam Block
EARTHWORK EXCAVATION for foundation in all soils and sub soils and to full depth as may be directed except in rock requiring blasting but inclusive of shoring, strutting and baling out water wherever necessary and refilling the sides of foundation with excavated earth in layers of not more than 15cm thick, well rammed and consolidated and depositing the surplus earth within the compound in places shown by the departmental officers with initial lead and lift etc.,including levelling the sites complete complying with standard specifications and as directed. (Hard Soil ) First depth of 2m 1)For Foundation 2) For GL Brace
Second Depth of 1m 1)For Foundation
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. 1)For Foundation
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 40mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. 1) For GL Brace
Cement concrete 1:4:8 (one cement four sand and eight aggregates) using 20mm HBGS for levelling course for foundation including the cost of mixing concrete, ramming, curing etc., complete as directed by TWAD Board officers. For GL Landing Platform for ladder
RCC in M30 GRADE using graded aggregtes of HBGs excluding cost of reinforcement, centering, shuttering strutting, but including cost of mixing concrete, placing, vibrating with mechanical vibrator, finishing, curing etc., complete as directed by TWAD Boad (A) For items 1.5m to 4.5m below GL Rectangular Portion Trapezoidal portion '(.35/3)x(2.2*2.2+0.4*0.4+2.20*0.40) =0.49
(B) For items 0 to 1.50m below GL 1) For column upto G.L. 2) For GL brace 3) For GL brace extended portion for landing slab 4) For GL Landing Platform for ladder
(C) For items 0m to 4.5m above GL 1) Columns 2) Brace No 1 at 2.715m 3) For brace extended portion for landing slab 4) For Landing Platform for ladder
(D) For items 4.51m to 7.32m above GL 1) Columns 2) Brace No 2 at 5.58m 3) For brace extended portion for landing slab 4) For Landing Platform for ladder
(E) For items 7.32m to 10.98m above GL 1) Columns 2) Brace No 3 at 8.445 m 3) For brace extended portion for landing slab 4) For Landing Platform for ladder
(F) For items 10.98m to 14.64m above GL 1) Columns 2) For beam at 11.45m above GL 3) For beam extended portion for landing slab 4) For Landing Platform for ladder 5)For floor slab at 11.61m above GL 6)For haunches 7)Sidewall
(G) For items 14.64m to 18.30m above GL 1) Sidewall 2) For Roof Slab @14.75 to 14.93 m from GL 3) Deduction for manhole cover 4) For PVC cowl
Supplying and erecting steel centering for sides and soffits I including necessary supports' and shuttering to the required height for RCC items using MS sheets of suitable size of BG.10 stiffeneq with welded MS angles of size 25mm x 25mm x3mm of boarding PLANE SURFACES Below G.L. 1) For Footing Side 2) For GL Brace sides 3) For GL Brace sides 4) GL brace extn portion-bottom 5) GL brace extn portion-outside 6) LANDING PLATFORM 7) GL Landing Platform-side 8) GL Landing Platform-outside 9) GL Landing Platform-Bottom
B) ABOVE G.L. to 3.30m 1) For Ist Brace bottom @2.715m 2) For Ist Brace Brace sides 3) Brace extn portion-bottom 4) Brace extn portion-outside 5)Brace extn portion-inside 6)Brace extn portion-face 7)Landing Platform-side 8)Landing Platform-outside 9)Landing Platform-Bottom FROM FLOOR TO 3.30 M Roof slab bottom Deduct for Manhole For sidewall junction with Roof bottom ADD Sides of manhole
B) 5.30m to 6.30m 1)For IInd Brace bottom @5.58m 2) For IInd Brace Brace sides 3) Brace extn portion-bottom 4) Brace extn portion-outside 5) Brace extn portion-inside 6) Brace extn portion-face 7) Landing Platform-side 8) Landing Platform-outside 9) Landing Platform-Bottom
B)8.30m . to 9.30m 1) For IIIrd Brace bottom @8.445m 2) For IIIrd Brace Brace sides 3) Brace extn portion-bottom 4) Brace extn portion-outside 5) Brace extn portion-inside 6) Brace extn portion-face 7) Landing Platform-side 8) Landing Platform-outside 9) Landing Platform-Bottom
C) 11.31m to 12.30m 1) Floor beam bottom @11.45 m 2) Floor beam inside 3) Floor beam outside 4) Beam extn portion-bottom 5) Beam extn portion-outside 6) Beam extn portion-inside 7) Beam extn portion-face 8) Landing Platform-side 9) Landing Platform-outside 10) Landing Platform-Bottom 11) Bottom of floor slab including working space 12) Deduct Beam bottom 13) Deduct Column junction
Curved Surface 0 to 3.30m from floor level 1) Sides of floor slab 2) Side wall outer 3) Side wall inner 4) Haunch (slanting) 5) Sides of roof slab
Square column Below G.L. 1) Column below G.L. 2) Deduct brace junction
Ground level to 3.30 m 1) Ground level to 3.30 m 2) Deduct brace @2.715
Square column 3.31 to 4.30m
Square column 4.31 to 5.30m
Square column 5.31 to 6.30m Deduct brace @5.58m
8.31 to 9.30m Deduct brace @8.445m
Painting two coats with approved cement paint over one coat of priming coat over cement plastered exposed surface of the Reservoir including cleaning, preparing the surface and curing etc., complete and as directed by TWAD Board officers 1 )For column 2) For Braces-3 Nos -(4 x0.30=1.20m) 3) Deduct column&Brace junction 3Nos 4) Floor beam outer face 5) Inner face 6) Floor slab bottom 7) Floor slab sides 8) Floor slab top 9) Side wall outer 10) Roof slab sides 11) Roof slab sides offset 12) For Extended Braces & beam - 4 Nos 13) Deduct landing &Brace junction 3Nos
Supplying, fabricating and placing in position of HSD steel rods for Reinforcement including the cost of steel and binding wire etc., complete and as directed by TWAD Board officers.
Fabrication, supply, delivery and fixing of outside MS Ladder of 45cm clear wide made out of 50 mm x 50mm x 6mm MS angle for both sides and for steps at 30cm C/C welded jointed etc ., for I staging from GL to 1st level brace (weight 4.5kg/m) IInd and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 nos. at Ground Level- 1No. and above Ground Level - 4Nos. Supply and fixing of 32mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS Base plate of 100mm X 100mm X 6mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers.
Providing and fixing of RCC inner access ladder in RCC 1:1.5:3 (one cement, one and half sane! and three aggregates) using 20mm HBG stone for OHT including cost of reinforcement, placing grill in position, centering shuttering charges, mixing concrete cu
Providing PVC ventilating arrangements mosquito proof nylon net with 110 mm PVC pipes and cowl and as directed by TWAD Board officers
Providing cut stone slab in CM 1:3 and as directed by TWAD Board officers
Providing manhole cover of size 1x1 0.60 X 0.60M in RCC 1: 1.5:3 with suitable reinforcement and 5O x 5O x 6mm MS angle fixed along edges and as directed by TWAD Board officers.
Pipe connection to SR 65mm Ø GI pipes for over flow & 1xl
90mm Ø PVC Threaded coupler
65 mm Ø PVC threaded coupler
65mm Ø GI Tee
65mm Ø GI 900 Bend
65mm Ø GI coupler
65mm Ø GI union
65mm Ø GI Elbow
65x50mm Ø GI Reducer
75mmx 63mm PVC Reducer
75mm PVC Threaded coupler
75x90 PVC Reducer
75x63 PVC Reducer
65mm Ø GM Gate valve
50mm Ø GM gate valve
Refilling the foundation with excavated earth including consolidation as directed by the TWAD Board officers. As per item l(a) + l(b) Less item 2,3 & 4A & 4B Total
Provision of Name Board
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
MARI CONTRACT WORKS
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .