Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹67.6 LAdmitted-Finance AT DAHIKHIA PO PS KAKATPUR DIST PURI | -2.50% | ₹67.6 L | L1 | Admitted-Finance |
| 2 | L2₹69.3 L+₹1.7 L (2.56%)Admitted-Finance AT PO PS BEHERA SAHI CHOUDWAR DIST CUTTACK | CUTTACK | ODISHA | 752120 | +0.00% | ₹69.3 L+₹1.7 L (2.56%) | L2 | Admitted-Finance |
Tender Value
₹69.3 L
EMD Value
₹69,400
Closing Date
23 Jun 2026, 5:00 pmClosed
Executive Engineer,Div-II
Bikash Bhawan,Jagannath Lane,Badambadi-753012
Construction of Community Centre and Ward Office in Ward No.34.
2026_ORULB_131616_1
MC(CMC)CTC_Div-IINo12/2026-27
Open Tender
Civil Works - Others
Percentage
90 days
CMC
Please refer Tender documents.
2 documents required · 2 mandatory
₹11,800
₹69,400
Yes
26 Aug 2026
18 Jun 2026
29 Jun 2026
18 Jun 2026
23 Jun 2026
18 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in all kinds of soil within 50m. initial lead & 1.5m. initial lift including rough dressing & breaking clods to maximum 5cm. to 7cm. & laying in layers not exceeding 0.3m. in depth & as per direction of the engineer–in–charge. | 101.82 | Cum | 299.52 | ₹30,497.13 |
| 2 | Supplying Filling foundation and plioth (F&P) with sand well watered and rammed mchoding all cost and complete finished in all respect as per direction of the Engineer-in-charge | 44.94 | Cum | 612.7 | ₹27,534.74 |
| 3 | Cement concrete (1:3:6) with 4cm HG crusher broken metal in foundation and plinth including all cost and complete as per direction of the Engineer-in-charge. | 60.52 | Cum | 6,393.8 | ₹3,86,952.78 |
| 4 | Fly Ash Brick 23cm x 11cm x 8cm size having crushing strength not less than 75 Kg/Cm2 with dimentional tolerance + 8% in cement mortar (1:4) in foundation & plinth. | 13.77 | Cum | 5,538.3 | ₹76,262.39 |
| 5 | Brickwork with Fly Ash Bricks 27cmx11cmx8cm having cruding not less than 25kg/cm³ mCM (16) in Superstructire including cost of all and complete finished in all respect. | 18.65 | Cum | 5,571.7 | ₹1,03,912.2 |
| 6 | RCC. work of M-20 using 20mm and down graded hand granite Crasher broken chips mcluding laying hosting, Centring & shuttering with all cost, conveyance etc.RCC FOOTING | 10.48 | Cum | 6,925.12 | ₹72,575.26 |
| 7 | RCC Plinth Beam | 11.41 | Cum | 12,574.56 | ₹1,43,475.73 |
| 8 | RCC Column in Super Structure | 4.37 | Cum | 18,597.01 | ₹81,268.93 |
| 9 | RCC Wall Beams | 7.61 | Cum | 18,597.01 | ₹1,41,523.25 |
| 10 | RCC Lintel | 2.34 | Cum | 14,588.47 | ₹34,137.02 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 13.14 MB
BOQ_596873.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .