Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.8 LAccepted-AOC | ₹14.8 L | L1 | Accepted-AOC Accepted |
| Sl No | Description | Qty | Unit | SUDALAIKANNU L1 |
|---|---|---|---|---|
| 1.00 | Dismantling the damaged Tiles including all cost and convenyance at materials to site and all labours charges etc., complete. | 353 | m2 | 60 ₹21,180 |
| 2.00 | Dismantling the damaged PCC 1:4:8 including all cost and convenyance at materials to site and all labours charges etc., complete. | 17 | m3 | 479 ₹8,143 |
| 3.00 | Dismantling the damaged Plastering including all cost and convenyance at materials to site and all labours charges etc., complete. | 10 | m2 | 8 ₹80 |
| 4.00 | Dismantling the damaged RCC including all cost and convenyance at materials to site and all labours charges etc., complete. | 1 | m3 | 4,244 ₹4,244 |
| 5.00 | Earthwork excavating and depositing on bank with an initial lead of 10m & initial liftm of 2m, in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size bouiders and hard gravelly soil asper standard specification 20 B including refilling charges. | 0.5 | m3 | 213 ₹106.50 |
| 6.00 | Plain cement concrete 1:4:8 mix using 40 mm ISS size HBG metal from approved Quality including all cost of materials of site all Labour charges and conveyance etc., complete as per standard specification. | 17 | m3 | 5,151 ₹87,567 |
| 7.00 | Supplying and erecting steel centering for plain surface and basement for grade beams, column footings, plinth beams, staircase steps with all cost and conveyance etc complete. | 4 | m2 | 1,051 ₹4,204 |
| 8.00 | Supplying , fabricating and placing in it position of MS or RTS rod including the cost of steel & Binding wire, labour charges for cutting, bending, placing & tying with grills and conveyance etc., complete. | 50 | kg | 90 ₹4,500 |
| 9.00 | Reinforced Cement concrete 1:1.5 :3 (one cement, one and half sand & three course aggregate) using 20mm gauge hand broken/ and broken granite stone for all RCC items of works excluding centering shuttering and cost of reinforcement but including curing etc.,complete and also including fixing fan clamps and fixtures in rcc works wherever necessary as directed by departmental officer etc., complete. | 0.5 | m2 | 8,339 ₹4,169.50 |
| 10.00 | Brick work in the cement mortar 1:5 ( one cement Five sand) mix using well burnt country bricks of size 8 ¾” x 4 ¼” x2¾” from approved quarry including all cost and conveyance of materials to site and all labours charges etc., complete as per standard specification. | 6 | m3 | 7,259 ₹43,554 |
Tender Value
₹18 L
EMD Value
₹18,000
Closing Date
9 Sept 2025, 3:00 pmClosed
COMMISSIONER TIRUNELVELI
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Maintenace of Community hall building at CN Village in ward no.29
2025_MAWS_596654_120
24/2025-26
Open Tender
Civil Works
90 days
S.N.HIGH ROAD MAIN OFFICE TIRUNELVELI CORPORATION
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹18,000
24 Feb 2026
1 Sept 2025
9 Sept 2025
1 Sept 2025
9 Sept 2025
1 Sept 2025
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid