Minor OH centrifuging of 1.6MVA UST transformer
Draining of oil from main tank and disconnecting HV LV chamber
Dismantling of transformer including core coil assembly hot oil flushing and final assembly
Complete dry out of core coil assembly in oven
Filling of new transformer oil and filtration of oil till required BDV and PPM
Electrical testing and connection of HV LV jumper
Painting of transformer
Construction of permanent oven
9669283
GEM/2026/B/7841500
Two Packet Bid
Minor OH centrifuging of 1.6MVA UST transformer,Draining of oil from main tank and disconnecting HV
Sonbhadra, Uttar Pradesh
Total value wise evaluation
BOQ
1 document required · 1 mandatory
DY CAO CFA AND BO, Deputy Chief Accounts Officer. CFA & BO, ‘B’TPS OBRA SONBHADRA-231219, (Dy Cao Cfa And Bo Btps)
₹9,200
6 Aug 2026
27 Jul 2026
6 Aug 2026
| Item No | Item Title | Qty | Unit | Consignee | Delivery (days) |
|---|---|---|---|---|---|
| 1 | Minor OH centrifuging of 1.6MVA UST transformer | 2 | JOB | Akhilesh Kumar Vaishya Of Oil From 231219,Obra Thermal Power Plant Main Tank And Disconnecting HV LV Chamber | 30 |
| 2 | Draining of oil from main tank and disconnecting HV LV chamber | 4 | JOB | Akhilesh Kumar Vaishya Of Transformer 231219,Obra Thermal Power Plant Including Core Coil Assembly Hot Oil Flushing And Final | 30 |
| 3 | Dismantling of transformer including core coil assembly hot oil flushing and final assembly | 4 | JOB | Akhilesh Kumar Vaishya Dry Out 231219,Obra Thermal Power Plant Of Core Coil Assembly In Oven | 30 |
| 4 | Complete dry out of core coil assembly in oven | 4 | JOB | Akhilesh Kumar Vaishya Of New Transformer 231219,Obra Thermal Power Plant Oil And Filtration Of Oil Till Required BD V And PPM | 30 |
| 5 | Filling of new transformer oil and filtration of oil till required BDV and PPM | 4 | JOB | Akhilesh Kumar Vaishya And Connection 231219,Obra Thermal Power Plant Of HV LV Jumper | 30 |
| 6 | Electrical testing and connection of HV LV jumper | 6 | JOB | Akhilesh Kumar Vaishya 231219,Obra Thermal Power Plant | 30 |
| 7 | Painting of transformer | 6 | JOB | Akhilesh Kumar Vaishya Of Permanent 231219,Obra Thermal Power Plant Oven | 30 |
| 8 | Construction of permanent oven | 1 | JOB | Akhilesh Kumar Vaishya 231219,Obra Thermal Power Plant | 30 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
bid_9669283.pdf
GEM_BID • 0.11 MB
tender_doc_2026-07-27-18-59-08_c0eb8ce358006208b8f21d2538f5449c.pdf
BOQ • 0.14 MB
boq_item_sample_file_2026-07-27-18-59-08_1bb26c3128168dc0abf6aab468d9df7d.csv
BOQ • 0.00 MB
1785159334.xlsx
GEM_OTHER • 0.01 MB
TENDER_fe8fe6a2-e9d8-4209-ac641785159730789_ee_emd1_btps_obra.pdf
GEM_OTHER • 0.14 MB
gtc.pdf
GEM_OTHER • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].