| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹99,396Accepted-AOC | ₹99,396 | L1 | Accepted-AOC L1 |
| 2 | L2₹99,505+₹109 (0.11%)Rejected-Finance | ₹99,505+₹109 (0.11%) | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | P THIRUPPATHIRAJA L1 | BABU CONSTRUCTION L2 |
|---|---|---|---|---|---|
| 1.00Maintenance of Storm Water Drain | |||||
| 1.01 | Removing and Stocking of existing Paver Block of Size 83/63mm thick carefully reuse, as per direction of Engineer incharge are standared specification Rubberised interlocking Paver block M40 grade Providing and laying of OLD (EXIXTING PAVER BLOCK)83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,.
Sub Data | 10 | m2 | 625 ₹6,250 Lowest | 630 ₹6,300 |
| 1.02 | Dismantling ,clearing away and carefully stacking materials useful for re-use for any thick ness of wallsDismantling of Plain cement concrete | 1 | m3 | 518 ₹518 Lowest | 525 ₹525 |
| 1.03 | Sand and Silt Under Water (SS20B) Earth work
excavating and depositing on bank with initial lead of
10 m & initial lift of 2m in Slush and silt under water
upto 0.75m depth requiring the aid of basket and
vessels (SS20B) | 4 | m3 | 108 ₹432 Lowest | 115 ₹460 |
| 1.04 | Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28) | 2 | m3 | 5,715 ₹11,430 | 5,420 ₹10,840 Lowest |
| 1.05 | Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38 | 20 | m2 | 630 ₹12,600 Lowest | 635 ₹12,700 |
| 1.06 | Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone
jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost
of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. ( Dummy columns should be at least 1 metre height) -Mixing by manual means | 5 | m3 | 5,688 ₹28,440 Lowest | 5,692 ₹28,460 |
| 1.07 | Plastering the surface of walls with Cement Mortar 1:4 (One cement and Four plastering sand), 20mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used , curing etc., complete complying with standard specification and as directed by the departmental officers. | 7 | m2 | 580 ₹4,060 Lowest | 585 ₹4,095 |
| 1.08 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers. | 17 | m2 | 1,178 ₹20,026 Lowest | 1,185 ₹20,145 |
| 1.09 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 170 | kg | 92 ₹15,640 Lowest | 94 ₹15,980 |
Tender Value
Refer Docs
EMD Value
₹1,200
Closing Date
3 Feb 2026, 3:00 pmClosed
Commissioner Nagercoil City Municipal Corporation
City Municipal Corporation Office Nagercoil 629001 Ph.No. 04652230984
Nagercoil Corporation Maintenance of Storm Water Drain at Aloor near Mobarak Tea Stall in Ward no.1
2025_MAWS_637962_2
318/2025-26/AEE
Open Tender
Civil Works
Lump-sum
90 days
Nagercoil Corporation Maintenance of Storm Water D
Registered Contractor
3 documents required · 3 mandatory
₹0
₹1,200
3 Jul 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
3 Feb 2026
28 Jan 2026
Maintenance of Storm Water Drain
Removing and Stocking of existing Paver Block of Size 83/63mm thick carefully reuse, as per direction of Engineer incharge are standared specification Rubberised interlocking Paver block M40 grade Providing and laying of OLD (EXIXTING PAVER BLOCK)83mm thick high strength type conforming IS 15658-2006 of rubberized interlocking paver lock in size of minimum compressive strength of 40N/mm2 in uniform shape of approved make to be laid in flurring bone pattern with sand cushion below the uniform shap of approved non skitting surface in the top and the rate including levelling the base preparation of pavers as sub base, sand cushion 150mm thick laying out of pavement cut the pieces to fix the edge vibring the pavers,sweeping tranporting loading unloading of laying paver block as per standard specification,. Sub Data
Dismantling ,clearing away and carefully stacking materials useful for re-use for any thick ness of wallsDismantling of Plain cement concrete
Sand and Silt Under Water (SS20B) Earth work excavating and depositing on bank with initial lead of 10 m & initial lift of 2m in Slush and silt under water upto 0.75m depth requiring the aid of basket and vessels (SS20B)
Laying Plain cement concrete 1:4:8 (One cement,four sand and eight aggregates) using 40mm ISS Hard broken granite stone jelly for foundation and basement including watering if found necessary and laid inlayers of 15cm thick, and consolidated including curing, cost and conveyance of all materials to work site all labour and incidental charges etc,. complete complying with standard specifications.(TNBP No.28)
Centering for soffits of RCC slabs of plane surface like lintels, beams ,etc.,including strutting 3m high using mild steel sheets of size 90cm X 60cm X and B.G 10 stiffened with M.S angles of size 25mm X 25mm X 3mm laid over silver Oak (C.W) joists of size 10cm X 6.5cm (spaced at about 90cm c/c )and supported dy casurina props of 10cm to 13cm dia (spaced of 75cm C/C) complying with standard specification and directed - 10 m 2 (P & D)Data 38
Cement Concrete 1:3:6 (One Cement, Three crushed stone sand and Six broken stone jelly) using 20mm size hard broken stone jelly for dummy columns,etc., excluding cost of centering shuttering reinforcement grills and fabrication charges but including curing etc. complete and as directed by the departmental officers. ( Dummy columns should be at least 1 metre height) -Mixing by manual means
Plastering the surface of walls with Cement Mortar 1:4 (One cement and Four plastering sand), 20mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used , curing etc., complete complying with standard specification and as directed by the departmental officers.
Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of following thickness in RCC 1:2:4 (one cement, two crushed stone sand and four aggregates), using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed by the departmental officers.
Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_776899.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.38 MB
BOQ_776899.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .