| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹23.3 LAdmitted-Finance MAYOOR VIHAR OBRI BARABANKI | BARABANKI | BARABANKI | UTTAR PRADESH | -0.01% | ₹23.3 L | L1 | Admitted-Finance |
| 2 | L2₹23.5 LAdmitted-Finance MAYUR BIHAR COLONY JANPAD BARABANKI | BARABANKI | UTTAR PRADESH | 225001 | +1.00% | ₹23.5 L | L2 | Admitted-Finance |
| 3 | L2₹23.5 LAdmitted-Finance | +1.00% | ₹23.5 L | L2 | Admitted-Finance |
Updated dates
Tender Value
₹27.5 L
EMD Value
₹2.8 L
Closing Date
6 May 2026, 2:00 pmClosed
EXCEUTIVE OFFICER
EXCEUTIVE OFFICER NAGAR PALIKA PRISHAD NAWABGANJ
Construction of a covered RCC drain from the primary school to the Gaushala Road culvert in Ward-Bahadian Tola Mohalla-Manjhlepur.
2026_DOLBU_1130291_1
2072/2073/MUKA/2025-26 DATE 24-03-2026
Open Tender
Civil Works
90 days
NAGAR PALIKA PRISHAD NAWABGANJ
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,588
Yes
0315104000102247 IDBI BANK
₹2.8 L
Yes
15 May 2026
27 Mar 2026
8 May 2026
27 Mar 2026
6 May 2026
27 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Side Clearence & Malva Cleaning etc all complete. | |||||
| 2Earth work in excavation by mechanical means (Hydraulic excavator) I manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. As Per Annalysis | |||||
| 3P/L concrete in 1:5:10 cement ,f.sand&40mm gauage Stone Aggregates etc all complete D.S.R.NO-4.1.10A @ 4911.85 X 0.755=3708.44 | |||||
| 4RCC work in 1:1.5:3 cement ,c.sand&20mm stone Grite etc all complete D.S.R. NO-5.2.2A @ 10682.15*0.755=8065.00 Excluding Centering & Shuttering | |||||
| 5RCC work in 1:1.5:3 cement ,c.sand&20mm stone Grite etc all complete D.S.R. NO-5.2.2A @ 10682.15*0.755=8065.00 Excluding Centering & Shuttering | |||||
| 6Centering & Shuttering including Strutting, Propping etc & Removal of for foundation, futting , coloumn etc As Per D.S.R. No-5.9.1 @392.15*0.755=296/Sqm | |||||
| 7Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. 5.22.1 Mild Steel And Medium Tensile steel bars. As Per Annalysis 107.10x0.735= 78.71 Say=78.00/Kg Or 7800/Qtl | |||||
| 8S/F innaugration stone/sign board etc. all complete. | |||||
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_2108530.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid