| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.6 LAccepted-AOC | ₹2.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹2.7 LRejected-AOC KOTTOOR UNION | KOTTAYAM | KERALA | 686001 | ₹2.7 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | Nithiyanatham Contractor L1 | K.Murugaiyan L2 |
|---|---|---|---|---|---|
| 1.001.Black Topping to Madhakovil Theru at Kumaramangalam in Puluthigudi Panchayat. | |||||
| 2.00 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | 99 | Sqm | 23 ₹2,277 Lowest | 23.4 ₹2,316.6 |
| 3.00 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 8.91 | cum | 140 ₹1,247.4 Lowest | 140.5 ₹1,251.86 |
| 4.00 | Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm | 22.28 | cum | 4,223 ₹94,088.44 Lowest | 4,223.35 ₹94,096.24 |
| 5.00 | Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | 297 | Sqm | 69 ₹20,493 Lowest | 69.47 ₹20,632.59 |
| 6.00 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete | 297 | Sqm | 332 ₹98,604 Lowest | 332.78 ₹98,835.66 |
| 7.00 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 3.42 | cum | 1,121 ₹3,833.82 Lowest | 1,121.6 ₹3,835.87 |
| 8.00 | Provision for Name Board | 1 | LS | 4,000 ₹4,000 Lowest | 4,500 ₹4,500 |
| 9.00 | GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | 1 | GST Amount | 40,418 ₹40,418 Lowest | 40,584 ₹40,584 |
Tender Value
Refer Docs
EMD Value
₹2,680
Closing Date
23 Jun 2026, 3:00 pmClosed
Block Development Officer(B.pt),Kottur Block.
Block Development Office,Kottur Block
1Black Topping to Madhakovil Theru at Kumaramangalam in Puluthigudi Panchayat MLACDS 2025 26 Kottur Block Tiruvarur Dist Package 02
2026_RDTN_680038_1
RC No 1630 2025 a2 08 06 2026 MLACDS 2025 26 Kottur Block Puluthigudi Panchayat P2
Open Tender
Civil Works - Roads
Item Rate
180 days
Kottur Block
As Per Tender Document
3 documents required · 3 mandatory
₹0
₹2,680
Yes
1 Jul 2026
9 Jun 2026
23 Jun 2026
9 Jun 2026
23 Jun 2026
9 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | 1.Black Topping to Madhakovil Theru at Kumaramangalam in Puluthigudi Panchayat. | - | - | - | - |
| 2 | Picking 5 cm to 10 cm old metalled surface and sectioning - 1 sq.m | - | Sqm | - | - |
| 3 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | - | cum | - | - |
| 4 | Providing and laying Water Bound Macadam Grading - III(63mm to11.20mm)IRC HBG of 75mm consolidated thickness consisting of clean, crushed aggregates mechanincally interlocked by rolling and bonding together with screening binding material of 0.24 cum for 10 sqm (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 20 & 6% repectively) and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer as per clause 405 of MORD revision I(Mix -in - place method) Rate for 10sqm | - | cum | - | - |
| 5 | Applying TACK COAT over WBM surface at 4Kg / 10 sq.m including labour for spraying, hire charges for bitumen sprayer etc. Comp. | - | Sqm | - | - |
| 6 | Providing and layiing pre-mix carpet 20mm thickness using 0.18cum of 13.2 IRC machine crushed metal 0.09cum of 11.2mm IRC machine crushed metal with 14.60Kg of Bitumen for pre-mixing 10 sqm of pre-mix carpet and laying Seal coat type "A" using .09 cum of 6.70mm IRC HBG chips with 9.80 Kg of Bitumen for 10sqm including cost and conveyance of materials to the departmental metric gauge for pre-measurement heating the bitumen boiler heating the aggregate and mixing them with bitumen in mini hot mix plant for pre-mix carpet and rolling by 80-100 KN power roller including labour charges for spreading hire and fuel charges for mini hot mix plant, bitumen boiler, all other tools and plants employed etc., complete | - | Sqm | - | - |
| 7 | Providing and Laying Gravel to 100mm compacted thick including cost & conveyance of gravel from approved sources to work site including labour for spreading, watering and compacting by Power roller to achieve the required Proctor density at 100% compaction | 1 | cum | - | - |
| 8 | Provision for Name Board | 1 | LS | - | - |
| 9 | GST Amount for providing Service to Government Contract Works for the above works. { GST Amount is the Total GST Amount for overall quoted amount above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD) | - | GST Amount | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
techbid.pdf
Tender Documents • 0.77 MB
BOQ_817076.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].