Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹49.7 LAccepted-Finance | ₹49.7 L | L1 | Accepted-Finance 1 |
| 2 | L2₹50.0 LRejected-Finance 01 451 AMBEDKARPUR AWASH VIKAS 03 KALYANPUR JANPAD KANPUR U P | FATEHPUR | UTTAR PRADESH | 208001 | ₹50.0 L | L2 | Rejected-Finance 2 |
Updated dates
Tender Value
₹53 L
EMD Value
₹4.7 L
Closing Date
21 May 2026, 12:00 pmClosed
Superintending Engineer
ETAWAH CIRCLE PWD ETAWAH
Renewal work along with general repair
2026_CEKNP_1133651_1
1546/55C-EV/2026 DATE 28-03-2026
Open Tender
Civil Works - Roads
60 days
ETAWAH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹4.7 L
Yes
ETAWAH
26 May 2026
6 Apr 2026
21 May 2026
6 Apr 2026
21 May 2026
6 Apr 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. | - | Cum | - | - |
| 2 | Providing and applying tack coat with bitumen using Bitumen pressure distributor at the rate of 0.20 to 0.30 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom. (Including Cost of Bitumen & Machinery) | - | Sqm | - | - |
| 3 | Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects. (Including Cost of Bitumen & Machinery) | - | Cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.22 MB
BOQ_2116131.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid