| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹27.9 LAdmitted-Finance NO 21 1 SIVARAMAN LAY OUT K K ROAD VILLUPURAM 605602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | L1 | Admitted-Finance | |
| 2 | L2₹28.3 L+₹46,221.78 (1.66%)Admitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | L2 | Admitted-Finance | |
| 3 | L3₹29.8 L+₹1.9 L (6.82%)Admitted-Finance NO 9 CHAIRMAN JANAGARAJ STREET SRI RAGAVENDHRA GARDEN ALAMELUPURAM VILLUPURAM 605 602 | VILLUPURAM | VILLUPURAM | TAMIL NADU | 605602 | L3 | Admitted-Finance | |
| 4 | L4₹32.9 L+₹5.0 L (18.0%)Admitted-Finance 3139 TEACHERS COLONY LALGUDI TRICHY 621 601 | TRICHY | TRICHY | TAMIL NADU | 621601 | L4 | Admitted-Finance | |
| 5 | Rejected-Technical | - | Rejected-Technical BOR NOT SATISFIED |
| Sl No | Description | Qty | Unit | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L2 | K.S.MANJU L3 | G.CHANDRASEKARAN L1 | creepers engineering contractors L4 |
|---|---|---|---|---|---|---|---|
| 2.00 | Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation | 216 | cum | 300 ₹64,800 | 100 ₹21,600 Lowest | 220 ₹47,520 | 250 ₹54,000 |
| 3.00 | Supplying and filling M.Sand sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc. complete | 26 | cum | 1,500 ₹39,000 | 500 ₹13,000 Lowest | 1,520 ₹39,520 | 3,000 ₹78,000 |
| 4.00 | PCC 1:3:6, with 40 mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete. | 26 | cum | 5,600 ₹1,45,600 | 6,000 ₹1,56,000 | 5,200 ₹1,35,200 | 5,000 ₹1,30,000 Lowest |
| 5.00 | PCC 1:3:6 using 20mm metal without formwork for structure and equipement plinth including cost of all materials lead, lift, etc. Complete. | 81 | Cum | 5,600 ₹4,53,600 Lowest | 7,000 ₹5,67,000 | 6,200 ₹5,02,200 | 6,000 ₹4,86,000 |
| 6.00 | RCC 1:1.5:3, mix, with 12 to 20mm HBG m/c metal with out form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.(Raft foundation) | 37 | cum | 5,600 ₹2,07,200 Lowest | 8,000 ₹2,96,000 | 7,200 ₹2,66,400 | 7,500 ₹2,77,500 |
| 7.00 | PCC1:2:4 using 20mm metal with out formwork including cost of all materials lead, lift, etc. Complete. | 21 | Cum | 5,600 ₹1,17,600 Lowest | 9,000 ₹1,89,000 | 7,200 ₹1,51,200 | 6,000 ₹1,26,000 |
| 8.00 | PCC1:2:4 using 20mm metal with formwork including cost of all materials lead, lift, etc. Complete. | 68 | Cum | 5,800 ₹3,94,400 Lowest | 10,000 ₹6,80,000 | 7,200 ₹4,89,600 | 6,500 ₹4,42,000 |
| 9.00 | RCC 1:1.5:3 mix, with 12 to 20mm HBG m/c metal with form work above GL for column including cost of all materials, cement, all labour, lead, lift, etc. complete. For wall concrete | 3.5 | cum | 6,000 ₹21,000 Lowest | 11,000 ₹38,500 | 11,222 ₹39,277 | 8,000 ₹28,000 |
| 10.00 | RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab concrete. | 4 | cum | 6,000 ₹24,000 Lowest | 12,000 ₹48,000 | 15,200 ₹60,800 | 10,000 ₹40,000 |
| 11.00 | Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, all labour charges, lead, lift, etc. complete. | 3,200 | Kg | 90 ₹2,88,000 | 10 ₹32,000 Lowest | 32 ₹1,02,400 | 85 ₹2,72,000 |
Tender Value
Refer Docs
EMD Value
₹37,800
Closing Date
25 Nov 2025, 2:00 pmClosed
AEE GL GCC TRICHY
OFFICE OF THE SE GCC TRICHY
Providing foundation concrete for equipment plinth and other civil works for enhancement of existing power transformer capacity from at Thiruvennainallur 110 22 KV SS.
2025_EB_622185_1
GCC 037 GL 010 2025 2026
Open Tender
Civil Works
Works
90 days
Thiruvennai nallur
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹37,800
Yes
6 Dec 2025
11 Nov 2025
26 Nov 2025
11 Nov 2025
25 Nov 2025
11 Nov 2025
Amount
Earthwork excavation in hard stiff clay stiff black cotton hard red earth, shales, murram, gravel stoney earth, earth mixed with small size boulders and hard gravelly soil for foundation
Supplying and filling M.Sand sand for foundation and basement including watering and consolidation in 15 cm layers including cost of sand all labour lead lift etc. complete
PCC 1:3:6, with 40 mm HBG m/c metal without form work including cost of all materials, cement, all labour, lead, lift, etc. complete.
PCC 1:3:6 using 20mm metal without formwork for structure and equipement plinth including cost of all materials lead, lift, etc. Complete.
RCC 1:1.5:3, mix, with 12 to 20mm HBG m/c metal with out form work below GL including cost of all materials, cement, all labour, lead, lift, etc. complete.(Raft foundation)
PCC1:2:4 using 20mm metal with out formwork including cost of all materials lead, lift, etc. Complete.
PCC1:2:4 using 20mm metal with formwork including cost of all materials lead, lift, etc. Complete.
RCC 1:1.5:3 mix, with 12 to 20mm HBG m/c metal with form work above GL for column including cost of all materials, cement, all labour, lead, lift, etc. complete. For wall concrete
RCC 1:1.5:3 using 12-20mm graded hard machine broken granite stone, including cost of all materials, form work, centering, curing, all labour charges, lead, lift, etc. complete. But excluding cost of steel reinforcement. For precast cover slab concrete.
Providing MS/RTS reinforcement rod for RCC works including cutting, bending, tying and fixing in position as per drawing and specification including cost of all materials, all labour charges, lead, lift, etc. complete.
Plastering with cm 1:5, 12mm thick for walls including cost of cement, all materials,curing, labour, lead and lift etc., complete.
Colour washing two coats with Ultima paint over one coat of white cement primer for outside wall including cost of all materials, labour, lead, lift, etc., complete. .
Supply & Fabrication, Transport & fixing of GI angles for cable duct with anchorage and placing in position as directed by the engineer at site including cost of angles,cutting and all labour, lead, lift, etc. Complete
Providing PVC pipe using 110mm dia 4 Kg / sqcm, PVC pipe and pvc clamp line supreme etc, including fixing PVC washer bend & shoe, in correct position and including cost of all materials, labour, transport lead, lift, etc., complete, including PVC accessories and washers.
Labour charges for transporting from casting yard to curing tank,curing tank cable duct , aligning and fixing of RCC pre cast cover slab as directed by the site engineer including all labour lead lifts etc complete
Supply and fixing of 90lbs rails in transformer plinth including cost of material and fixing charges etc complete
Supply and spreading of quarry dust inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
Supplying and fixing of 20mm of HB stone inside the yard as per std. spec.including cost of materials ,labour lead,lift etc
MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED (BID ID -1517873)
K.S.MANJU (BID ID -1520336)
creepers engineering contractors (BID ID -1520614)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_743907.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .