| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.0 LAccepted-AOC | ₹9.0 L | L1 | Accepted-AOC ok |
| 2 | L2₹9.3 LRejected-Finance HOUSE NO 685 SECTOR 7 URBAN ESTATE KARNAL 132001 | KARNAL | KARNAL | HARYANA | 132001 | ₹9.3 L | L2 | Rejected-Finance L2 |
| 3 | L3₹9.4 LRejected-Finance SHOP NO 5 WARD NO 12 132041 | KARNAL | KARNAL | HARYANA | 132041 | ₹9.4 L | L3 | Rejected-Finance L3 |
| 4 | L4₹9.7 LRejected-Finance C 8 9 SECTOR 4 ELDICO ESTATE HUDA SECTOR 40 PANIPAT 132103 | PANIPAT | PANIPAT | HARYANA | 132103 | ₹9.7 L | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | THE SHRI BALAJI COOP L AND C SOCIETY KARNAL L2 | The Rose Gudha Coop. Labour and Construction Society Ltd. L3 | THE DESHWAL CO-OP L AND C SOCIETY LTD. L4 | THE SEHGAL CO-OPERATIVE LABOUR & CONSTRUCTION SOCIETY LTD L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Repair of sewer connection at the site, including required material and labour charges, complete in all respects | 6 | Each | 499 ₹2,994 | 870 ₹5,220 | 1,800 ₹10,800 | 1,348 ₹8,088 |
| 2.00 | Repair of water connection at the site, including required material and labour charges, complete in all respects | 8 | Each | 499 ₹3,992 | 770 ₹6,160 | 1,200 ₹9,600 | 1,348 ₹10,784 |
Tender Value
₹9.9 L
EMD Value
₹19,780
Closing Date
16 Feb 2026, 5:00 pmClosed
Om Prakash Kardam
Municipal Corporation Karnal
Construction of cement concrete street near Balaji Mandir in Shastri Nagar Colony in Ward No. 16, M.C.Karnal. (Only for L/C Societies)
2026_HRY_501406_1
202622539161 BF3A 422D ACBD 55C418A7F4BD747ULB
Open Tender
Civil Works
90 days
Karnal
2 documents required · 2 mandatory
₹1,000
₹19,780
Yes
15 Jun 2026
9 Feb 2026
17 Feb 2026
9 Feb 2026
16 Feb 2026
9 Feb 2026
Repair of sewer connection at the site, including required material and labour charges, complete in all respects
Repair of water connection at the site, including required material and labour charges, complete in all respects
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[10.100.2]Cement Concrete 1:8:16 Flooring 2. Cement Concrete 1:8:16 with stone aggregate 40 mm size in foundation and plinth. [Through Rate]
[11.5.3]12 mm cement plaster of mix : 3. 1:4 (1 cement: 4 fine sand) [Through Rate]
[13.29.2]Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. 2. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works [Through Rate]
[2.B0242] B0242. 150 mm dia PVC pipe [Rate]
[3.1.1]By Mechanical Transport including loading, unloading and stacking 1. Lime, moorum, building rubbish [5km]
[30.87.1]Raising manhole cover and frame slab to required level including dismantling existing slab and making good the damage as required (Raising depth of manhole to be paid separately) : 1. Rectangular manhole 90x80 cm with rectangular cover 600 x 450 mm of grade LD - 2.5 [Through Rate]
[4.14.1]Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. 1. All kinds of soil. [Through Rate]
[4.4.1]Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. 1. All kinds of soil [Through Rate]
[4.7.1.2]Earth work in surface excavation not exceeding 30 cm in depth but exceeding 1.5 m in width as well as 10 sqm on plan including getting out and disposal of excavated earth and lift up to 1.5 m, as directed by Engineer-in- Charge: 1.2. All kinds of soil 15 m lead [Through Rate]
[5.23.2]Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 2. Nominal concrete 1:2:4 or leaner mix (i/c equivalent design mix) [Through Rate]
[6.1.1]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 1. 1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.1.2]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 2. 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.30.1]Centering and shuttering including strutting, propping etc. and removal of form for 1. Foundations, footings, bases of columns, etc. for mass concrete [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[6.39.1]Providing and fixing at or near ground level precast cement concrete in kerbs, edgings etc. as per approved pattern and setting in position with cement mortar 1:3 (1 Cement : 3 coarse sand), including the cost of required centering, shuttering complete. 1. 1:1½:3 (1 Cement: 1½ coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). [Through Rate]
[6.56]Providing and filling in position, blown bitumen in expansion joints. [Through Rate]
[6.58]Providing and fixing in position 12mm thick bitumen impregnated fibre board conforming to IS: 1838, including cost of primer, sealing compound Grade-A in expansion joints. [Through Rate]
[7.21.1]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 1. Cement mortar 1:4 (1 cement : 4 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.82 MB
BOQ_580041.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid