Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.8 CrAccepted-AOC | ₹1.8 Cr | L1 | Accepted-AOC .. |
| 2 | L2₹1.9 Cr+₹11.0 L (6.01%)Rejected-AOC OFFICE AT CHARRI TEH SHAHPUR DISTT KANGRA HP | KANGRA | HIMACHAL PRADESH | 175013 | ₹1.9 Cr+₹11.0 L (6.01%) | L2 | Rejected-AOC .. |
| 3 | L3₹2.1 Cr+₹27.0 L (14.7%)Rejected-AOC 171 GLOBEL SPACE HUDA GLOBEL SPACE COLONY 125055 | SIRSA | HARYANA | 125055 | ₹2.1 Cr+₹27.0 L (14.7%) | L3 | Rejected-AOC .. |
| Sl No | Description | Qty | Unit | SURINDER KUMAR L2 | Akhilesh Chaudhary L1 | M/S VIKAS CONSTRUCTION CO. L3 |
|---|---|---|---|---|---|---|
| 1.00 | Excavation in foundations and trenches (for pipes and pits for other civil structures) upto all depths in all kinds of soil such as pick work, jumper work and saturated soil and paved surfaces including bailing or pumping out of water, chiseling or wedging out of same where blasting is prohibited in all leads and lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring, strutting, planking timbering and dewatering wherever required, stacking usable and unusable material/soil separately and after laying jointing and testing of pipes, returning the usable soil in 15 cm layer by ramming and watering and then disposing of all surplus excavated soil/unusable material as directed within all leads and lifts including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects as per the direction of Engineer-in-charge. | 2,730.84 | Per cum | 740 ₹20,20,821.6 | 500 ₹13,65,420 | 224 ₹6,11,708.16 Lowest |
| 2.00 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 77.71 | Per cum | 7,250 ₹5,63,397.5 | 6,800 ₹5,28,428 | 6,580 ₹5,11,331.8 Lowest |
| 3.00 | Providing and laying cement concrete 1:3:6(1cement:3sand:6 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 7.31 | Per cum | 7,950 ₹58,114.5 | 1 ₹7.31 Lowest | 7,195 ₹52,595.45 |
| 4.00Providing and laying cement concrete 1:1.5:3 (1 Cement : 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work & reinforcement for reinforced concrete work in : | ||||||
| 5.00 | Foundation, footing, bases of columns & the like & the mass concrete complete in all respect as per the direction and to the entire satisfaction of Engineer-in-charge. | 130.51 | Per cum | 8,850 ₹11,55,013.5 | 8,500 ₹11,09,335 | 8,380 ₹10,93,673.8 Lowest |
| 6.00 | Wall (any thickness,but not less than 0.10 mtr.thickness) attached pilasters, buttresses, plinth & string courses etc. from top of foundation level to floor two level complete in all respect as per the direction and to the entire satisfaction of Engineer-in-charge. | 175.31 | Per cum | 950 ₹1,66,544.5 Lowest | 8,800 ₹15,42,728 | 8,740 ₹15,32,209.4 |
| 7.00 | Suspended floors, roofs, landings and shelves and their supports, balconies, beams, griders bressumers and cantilevers upto floor two level complete in all respect as per the direction and to the entire satisfaction of Engineer-in-charge. | 112.1 | Per cum | 9,250 ₹10,36,925 | 9,000 ₹10,08,900 | 8,650 ₹9,69,665 Lowest |
| 8.00Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | ||||||
| 9.00 | Flat surfaces such as soffits & suspended floors, roofs, landing and the like. Floor etc. upto 200mm in thickness. | 193.5 | sqm | 600 ₹1,16,097 | 450 ₹87,072.75 Lowest | 495 ₹95,780.03 |
| 10.00 | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | 2,189.53 | sqm | 100 ₹2,18,953 Lowest | 300 ₹6,56,859 | 270 ₹5,91,173.1 |
Tender Value
₹2.5 Cr
EMD Value
₹3.2 L
Closing Date
12 Mar 2026, 11:00 amClosed
Executive Egnineer JS Division Hamirpur
Executive Egnineer JS Division Hamirpur
Sub head Construction of 180 Nos Manhole chamber at various locations, providing , laying, jointing and testing of DI pipe 150mmdia class K7, construction of Inlet Chamber, Screen Channel and Wet well (Including Rising main and Pumping machinery, Au
2026_HPIPH_130362_1
. EE-JSV-HMR-CB-E-tenders-2025
Open Tender
Civil Works
Item Rate
365 days
Executive Egnineer JS Division Hamirpur
Please refer Tender documents.
9 documents required · 9 mandatory
₹5,000
Executive Egnineer JS Division Hamirpur
₹3.2 L
12 Jun 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
12 Mar 2026
3 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundations and trenches (for pipes and pits for other civil structures) upto all depths in all kinds of soil such as pick work, jumper work and saturated soil and paved surfaces including bailing or pumping out of water, chiseling or wedging out of same where blasting is prohibited in all leads and lifts including trimming and dressing of sides, leveling of beds to correct grade including shoring, strutting, planking timbering and dewatering wherever required, stacking usable and unusable material/soil separately and after laying jointing and testing of pipes, returning the usable soil in 15 cm layer by ramming and watering and then disposing of all surplus excavated soil/unusable material as directed within all leads and lifts including cost of diversion of traffic, night signal boards, fixing caution boards, crossing over trenches for access to houses, fencing etc. complete in all respects as per the direction of Engineer-in-charge. | 2,730.84 | Per cum | 100 | ₹2,73,084 |
| 2 | Providing and laying cement concrete 1:4:8(1cement:4sand:8 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 77.71 | Per cum | 100 | ₹7,771 |
| 3 | Providing and laying cement concrete 1:3:6(1cement:3sand:6 graded stone aggregate 40mm nominal size and curing complete excluding the cost of form work in foundation and plinth in all leads and lifts. | 7.31 | Per cum | 100 | ₹731 |
| 4 | Providing and laying cement concrete 1:1.5:3 (1 Cement : 1.5 sand : 3 graded stone aggregate 20mm nominal size) and curing complete excluding the cost of form work & reinforcement for reinforced concrete work in : | - | - | - | - |
| 5 | Foundation, footing, bases of columns & the like & the mass concrete complete in all respect as per the direction and to the entire satisfaction of Engineer-in-charge. | 130.51 | Per cum | 100 | ₹13,051 |
| 6 | Wall (any thickness,but not less than 0.10 mtr.thickness) attached pilasters, buttresses, plinth & string courses etc. from top of foundation level to floor two level complete in all respect as per the direction and to the entire satisfaction of Engineer-in-charge. | 175.31 | Per cum | 100 | ₹17,531 |
| 7 | Suspended floors, roofs, landings and shelves and their supports, balconies, beams, griders bressumers and cantilevers upto floor two level complete in all respect as per the direction and to the entire satisfaction of Engineer-in-charge. | 112.1 | Per cum | 100 | ₹11,210 |
| 8 | Prov.form work with steel plates 3.15mm thick welded with angle iron frame 30 x 30 x 5mm so as to give a fair finish including centring, shuttering,strutting & propping etc. with wooden battens and ballies, height of propping & centering below supporting floor to ceiling not exceeding 4mtr.& removal of same for insitu rainforced concrete and plain concrete work complete in all leads and lifrs and as per the directioin and to the entire satisfaction of the Engineer-in-Charge :- | - | - | - | - |
| 9 | Flat surfaces such as soffits & suspended floors, roofs, landing and the like. Floor etc. upto 200mm in thickness. | 193.5 | sqm | 100 | ₹19,349.5 |
| 10 | Vertical surfaces such as walls ( any thickness ) partition and the like including attached pillasters buttresses, plinth and string courses and the like. | 2,189.53 | sqm | 100 | ₹2,18,953 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.54 MB
F6.pdf
Tender Documents • 0.63 MB
Terms.pdf
Tender Documents • 0.08 MB
BOQ_192729.xls
BOQ • 0.27 MB
F8.pdf
Tender Documents • 1.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .