Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹3,048
Closing Date
11 Apr 2023, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer Thiruchendur
OFFICE OF THE EXECUTIVE ENGINEER, DISTN/TANGEDCO, 96e/1, NEAR BUS STAND, TIRUCHENDUR - 628215 TAMIL NADU.
UDAY Scheme3NosImprovement estimate1NoNewDP. 2NoslinklineNazerethand Meignanapuramsection from VellamadamSS9toUdayarkulamSS1.3 linklinefromsemmarikulamSS5toMaanaduSS5 in Various distn section
2023_EB_295825_2
WC.019/2022-23 OF EE/D/TCR
Open Tender
Electrical and Maintenance Works
Item Rate
120 days
Vellamadam, semmarikulam, udayarkulam
UDAY Scheme3NosImprovement estimate1NoNewDP. 2NoslinklineNazerethand Meignanapuramsection from VellamadamSS9toUdayarkulamSS1.3 linklinefromsemmarikulamSS5toMaanaduSS5 in Various distn section
2 documents required · 2 mandatory
₹0
₹3,048
15 Apr 2023
30 Mar 2023
12 Apr 2023
30 Mar 2023
11 Apr 2023
30 Mar 2023
30 Mar 2023 - 10 Apr 2023
Amount
Loading and unloading of 9.0 M PSC pole from Road side to pole pit
Transporting of 9.0 M PSC Pole from Road side to pole pit
Excavation & Erection of 9.0 M PSC Pole
Loading and unloading of 8 M PSC pole from Road side to pole pit
Transporting of 8 M PSC Pole from Road side to pole pit
Excavation & Erection of 8 M PSC Pole
Fixing 3'6'' V 'X' Arm
Fixing HT TI Fitting
Fixing of 3Ph Xarm
Fixing of S Ph X arm
Alteration of Back clamp
Fixing of HT Pin Insulator
Fixing of 11KV Disc
Fixing of Stay Set complete
Pole Earthing
HT Line singing with 7/3.35 ACSR with 50% of LC Work
Pole Concreting
Fixing of Tapping channel
Slotted Holes
Double Pole Switch Erected
Fixing of LT Pin Insulator
Fixing of Guarding Arrangement
Dismantling of 7.5 mtr Poles
Dismantling & Re Erection of 3 Ph X arm
Dismantling of stayset
Dismantling & Re Erection of Insulator & sackle
Dismantling & Re Erection of line 7/2.59ACSR
Dismantling& Re Erection of Guarding Arrangement
Dismantling of LT Ti Fitting
E.P.F. @13 % should be Entered by the Bidder
E.S.I. @3.25 % should be Entered by the Bidder
G.S.T. @18% should be Entered by the Bidder
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .