Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.5 CrAccepted-AOC KURMIKHERA KALA CHAUBEPUR KANPUR NAGAR | ₹3.5 Cr | L1 | Accepted-AOC L1 |
| 2 | Not Admitted-Fee/PreQual/Technical ADD C 269 AWAS VIKAS COLONY DISTT HARDOI 241001 | HARDOI | UTTAR PRADESH | 241001 | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 3 | Not Admitted-Fee/PreQual/Technical MOH HUSAINPURA SHAHJAHANPUR | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
Tender Value
₹3.6 Cr
EMD Value
₹20 L
Closing Date
26 Dec 2025, 12:00 pmClosed
SUPERINTENDING ENGINEER
OFFICE OF SE UNNAO CIRCLE PWD UNNAO
Strengthening of Hardoi-Chapartala Road (M.D.R-43C) Km 42.00 and Km 43.00 (Length 2.00 Km) in Dist-Hardoi
2025_CEUCZ_1100345_1
6609/M/1MT/E-TENDER/UC/2025 DT 10.12.2025
Open Tender
Civil Works - Roads
365 days
HARDOI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,715
₹20 L
Yes
SUPERINTENDING ENGINEER
18 Feb 2026
19 Dec 2025
26 Dec 2025
19 Dec 2025
26 Dec 2025
19 Dec 2025
23 Dec 2025
Construction of subgrade and earthen shoulders with approved material obtained from pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table No 300.2 (Including Labour Cess but excluding GST)
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. (Including Labour Cess but excluding GST)
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in subbase/base course on well prepared surface and compacting with vibratory roller to achieve the desired density. (Including Labour Cess but excluding GST)
Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical broom. (Including Labour Cess but excluding GST)
Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects. (Including Labour Cess but excluding GST)
Providing and applying tack coat with bitumen VG-10 using bitumin pressure distributor at the rate of 0.20 kg. per sqm on the prepared bituminous surface. (Including Labour Cess but excluding GST)
Providing and laying bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects (Including Labour Cess but excluding GST)
Dismantling brick work or stone work in lime or cement mortar and including stacking of materials as directed by the engineer-in-charge with in a distance of 60 m (200ft) (as per SOR 2020 Item No 692) (Including Labour Cess but excluding GST)
Earthwork in excavation for structures as per drawing and technical specifications clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. (Including Labour Cess but excluding GST)
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. (Including Labour Cess but excluding GST)
Brick Masonry Work in Cement Mortar 1:3 in Foundation complete excluding Pointing and Plastering, as per Drawing and Technical Specifications. (Including Labour Cess but excluding GST)
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications (Including Labour Cess but excluding GST)
RCC Grade M 25 Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications. (Including Labour Cess but excluding GST)
RCC Grade M 20 Furnishing and placing reinforced cement concrete in super structure as per drawing and Technical Specifications.(Including Labour Cess but excluding GST)
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. (Including Labour Cess but excluding GST)
Pointing with cement mortar (1:3 ) on brick work in substructure as per Technical Specifications (Including Labour Cess but excluding GST)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MORTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification. (Including Labour Cess but excluding GST)
Maintenance of constructed road for next 2 years after the actual date of completion of construction. (Including Labour Cess but excluding GST)
Maintenance of constructed road for 3rd year after the actual date of completion of construction.(Including Labour Cess but excluding GST)
Maintenance of constructed road for 4th year after the actual date of completion of construction.(Including Labour Cess but excluding GST)
Maintenance of constructed road for 5th year after the actual date of completion of construction.(Including Labour Cess but excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.27 MB
BOQ_2027468.xls
BOQ • 0.31 MB
T2ETENDER.pdf
Tender Documents • 0.47 MB
Download all tender documents and submit your bid