| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAdmitted-Finance 117 ANSAL SATYAM RDC RAJ NAGAR GHAZIABAD RDC GHAZIABAD UTTAR PRADESH 201002 | GHAZIABAD | UTTAR PRADESH | 201002 | ₹3.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹3.1 Cr+₹5.9 L (1.93%)Admitted-Finance 111 A POCKET IV DDA FLATS MAYUR VIHAR PHASE 1 DELHI 110091 | EAST | DELHI | 110091 | ₹3.1 Cr+₹5.9 L (1.93%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Green Way Technologies L1 | Tanishq-Ions L2 |
|---|---|---|---|---|---|
| 1.00Part-A:Civil Works including providing Electromechanical Equipment, Construction, supply, installation, testing and commissioning of 50 & 75KLD Waste Water Treatment Plant (WWTP). | |||||
| 1.10 | Detailed Design, Construction, Supply, Installation, fabrication, Testing & Commissioning of 50 & 75 KLD STP including 10 years operation & maintenance of any proven technology approved by the Central Public Health & Environmental Engineering Organisation (CPHEEO) including civil works, tertiary treatment etc. at 50 KLD STP for Distt. Park Kohat Enclave or Distt. Park Lok Vihar at Pitampura and 75 KLD STP for Zonal Green Area, Chander Shekhar Park or Zonal Green Area ( Nursery ), Sarswati Vihar at Pitampura to achieve the design parameters as prescribed by Hon'ble NGT and with provision of diffusors and blowers, etc as per process requirement for further polishing for best use after treatment in lakes/water bodies and irrigation purpose including civil, electrical, mechanical, instrumentation, piping, development works, including required pump sets of suitable capacity along with its E&M accessories with lighting arrangements at suitable places including detailed design & construction of channels of sufficient size /raw sewage intake, laying of pipeline & pumps (2W+1S),if required, to carry effluent to proposed WWTP Unit & pipeline to carry discharge from WWTP unit to water bodies/lakes/irrigation lines at boundary of STP as the case may be and discharging treated effluent with parameters complying NGT guidelines. All works from the primary stage to final treatment stage are to be included in this item. During Construction, operation and maintenance, power and water required for construction/operation purpose shall be arranged by the agency from the respective authority. WWTP shall also be operated and maintained 24 / 7 for a period of one year (free of cost) during guarantee period/ defects liability period (DLP) after successful testing and commissioning. All manpower, consumables and chemicals required for operation, routine, preventive & breakdown maintenance are to be provided by the agency and testing for outlet parameters shall also be provided by the agency from NABL/accredited Lab complete as per direction of Engineer in charge. Agency has to provide similar capacity (50 &75 KLD) of Storage tanks each at his own cost all complete as per direction of Engineer-in-charge. | 1 | JOB | 2,20,00,000 ₹2,20,00,000 Lowest | 2,60,00,000 ₹2,60,00,000 |
| 2.00Part-B: Comprehensive Maintenance of WWTP for 10 Years. | |||||
| 2.10 | COMPREHENSIVE OPERATION & MAINTENANCE of WWTP and all other allied works/structures etc. created under the contract for a period of 108 months after expiry of guarantee period of 12 months on commissioning of WWTP including all cost of labour, bio-culture, consumables, chemicals as per requirement of process of treatment, testing of outlet parameters etc. as required. Duties during O&M: plant to be run 24/7. Adequate operators/manpower to be provided for proper plant operation. Treated water quality target should be monitored by random sampling of every 3 months or lesser frequency as required. The scope of item includes comprehensive maintenance the plant (i/c tertiary treatment ,etc) including all spares supply and consumables. Electricity supply for the plant will be provided by Agency. The O&M will commence from one year from the commissioning date. The contractor to submit Bank Guarantee at the end of defects liability period (DLP) of one year for an amount equivalent to yearly O&M amount before release of 1st RA Bill for O&M.
Note: Supplementary agreements shall be drawn for Part– B after completion of the items of Part -A. | 1 | JOB | 86,00,000 ₹86,00,000 | 51,90,000 ₹51,90,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹6.2 L
Closing Date
28 Oct 2024, 3:00 pmClosed
EE,HCD-5,DDA
EE,HCD-5,DDA
Supplying, installation, testing and commissioning of following STP i/c 10 years operation and maintenance of any proven technology approved by the Central Public Health and Environmental Engineering Organisation (CPHEEO) .................
2024_DDA_812028_2
19/EE/HCD-5/DDA/2024-25
Open Tender
Civil Works
Works
150 days
LAWRENCE ROAD
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
₹6.2 L
6 Dec 2024
16 Oct 2024
29 Oct 2024
16 Oct 2024
28 Oct 2024
16 Oct 2024
Amount
Part-A:Civil Works including providing Electromechanical Equipment, Construction, supply, installation, testing and commissioning of 50 & 75KLD Waste Water Treatment Plant (WWTP).
Detailed Design, Construction, Supply, Installation, fabrication, Testing & Commissioning of 50 & 75 KLD STP including 10 years operation & maintenance of any proven technology approved by the Central Public Health & Environmental Engineering Organisation (CPHEEO) including civil works, tertiary treatment etc. at 50 KLD STP for Distt. Park Kohat Enclave or Distt. Park Lok Vihar at Pitampura and 75 KLD STP for Zonal Green Area, Chander Shekhar Park or Zonal Green Area ( Nursery ), Sarswati Vihar at Pitampura to achieve the design parameters as prescribed by Hon'ble NGT and with provision of diffusors and blowers, etc as per process requirement for further polishing for best use after treatment in lakes/water bodies and irrigation purpose including civil, electrical, mechanical, instrumentation, piping, development works, including required pump sets of suitable capacity along with its E&M accessories with lighting arrangements at suitable places including detailed design & construction of channels of sufficient size /raw sewage intake, laying of pipeline & pumps (2W+1S),if required, to carry effluent to proposed WWTP Unit & pipeline to carry discharge from WWTP unit to water bodies/lakes/irrigation lines at boundary of STP as the case may be and discharging treated effluent with parameters complying NGT guidelines. All works from the primary stage to final treatment stage are to be included in this item. During Construction, operation and maintenance, power and water required for construction/operation purpose shall be arranged by the agency from the respective authority. WWTP shall also be operated and maintained 24 / 7 for a period of one year (free of cost) during guarantee period/ defects liability period (DLP) after successful testing and commissioning. All manpower, consumables and chemicals required for operation, routine, preventive & breakdown maintenance are to be provided by the agency and testing for outlet parameters shall also be provided by the agency from NABL/accredited Lab complete as per direction of Engineer in charge. Agency has to provide similar capacity (50 &75 KLD) of Storage tanks each at his own cost all complete as per direction of Engineer-in-charge.
Part-B: Comprehensive Maintenance of WWTP for 10 Years.
COMPREHENSIVE OPERATION & MAINTENANCE of WWTP and all other allied works/structures etc. created under the contract for a period of 108 months after expiry of guarantee period of 12 months on commissioning of WWTP including all cost of labour, bio-culture, consumables, chemicals as per requirement of process of treatment, testing of outlet parameters etc. as required. Duties during O&M: plant to be run 24/7. Adequate operators/manpower to be provided for proper plant operation. Treated water quality target should be monitored by random sampling of every 3 months or lesser frequency as required. The scope of item includes comprehensive maintenance the plant (i/c tertiary treatment ,etc) including all spares supply and consumables. Electricity supply for the plant will be provided by Agency. The O&M will commence from one year from the commissioning date. The contractor to submit Bank Guarantee at the end of defects liability period (DLP) of one year for an amount equivalent to yearly O&M amount before release of 1st RA Bill for O&M. Note: Supplementary agreements shall be drawn for Part– B after completion of the items of Part -A.
Tanishq-Ions (BID ID -3111944)
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .