Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.7 CrAccepted-AOC | ₹1.7 Cr | L1 | Accepted-AOC lowest amount |
| 2 | L2₹17.1 CrRejected-AOC | ₹17.1 Cr | L2 | Rejected-AOC highest amount |
| 3 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | ARVIN ENTERPRISES L2 | R.Thanaraj L1 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum | 2,994 | Cum | 167 ₹5.0 L | 163 ₹4.9 L |
| 2.00 | Cement Concrete M 7.5 (1:4:8) (One Cement, four crushed stone sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means | 326.55 | Cum | 6,115 ₹20.0 L | 6,113 ₹20.0 L |
| 3.00 | Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Culver Side Walls | 1,140.5 | Cum | 11,634 ₹1.3 Cr | 11,632 ₹1.3 Cr |
| 4.00 | Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309) | 1,399.5 | M2 | 598 ₹8.4 L | 597 ₹8.4 L |
| 5.00 | Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for DECK SLAB | 32.26 | Cum | 11,580 ₹3.7 L | 11,579 ₹3.7 L |
| 6.00 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500,
Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel
reinforcement and G.I. binding wire, wastage etc. complete complying with standard
specification and as directed by the departmental officers.(Contractor has to make his
own arrangements for the supply of steel reinforcement and binding wire) | 1,650 | KG | 95 ₹1.6 L | 92 ₹1.5 L |
Tender Value
₹2.1 Cr
EMD Value
₹2.1 L
Closing Date
23 Dec 2025, 3:00 pmClosed
MUNICIPAL COMMISSIONER SIRKALI
MUNICIPAL OFFICE SIRKALI
Construction of Storm Water Drain at East Car street (099016R135) , West car street (099013R111), North car streets (099013R106), South car Street (099019R153) and South car Street (099019R154) in Sirkali Municipality
2025_MAWS_631350_1
1479/2025/E1
Open Tender
Civil Works
sirkali
DD,work experience
3 documents required · 3 mandatory
₹0
₹2.1 L
17 Feb 2026
12 Dec 2025
23 Dec 2025
12 Dec 2025
23 Dec 2025
12 Dec 2025
Earth work excavation for foundation in Hard stiff clay, stiff black cotton, hard red earth, shales murram, gravel,stoney earth and earth mixed with small size boulders SS.20B and Sand, silt or other loose soil, wet sand,or silt not under water, light black cotton soil, sandy loam ordinary soil and to full depth as may be directed except in hardrock requiring blasting inclusive of shoring shuttering and baling out water and cleaning and levelling the site etc.,complete 10 cum
Cement Concrete M 7.5 (1:4:8) (One Cement, four crushed stone sand and eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly curing etc. complete complying with standard specification and as directed by the departmental officers -Mixing by mechanical means
Vibrated Cement Concrete of grade M15 (Nominal mix) using 20mm ISS size HBG metal including cost and conveyance of all materials to site and cost cement at site including cost of formwork, soft water, labour charges for mixing, transporting, laying and curing concrete, working at depths Hire charges for Tools and plants and incidental charges etc., complete as per relevent standard specification for Culver Side Walls
Plastering with cement mortar 1:4 (One Part of Cement and Four part of Plastering Sand (P- Sand)) 20mm thick in all floors including cost and conveyance of all materials to site and labour charges etc, complete complying with standard specifications (S.I.309)
Vibrated Reinforced Cement Concrete M20 (Design mix) using 20 mm ISS HBG graded metal including cost and conveyance of all materials to site and cement at site excluding cost and fabrication of steel but form work and centering soft water labour charges for mixing, transporting, placing in position, vibrating and compacting finishing and curing concrete, working at heights, hire charges for Hire charges for Tools and plants, including all other incidental charges, etc., complete as per standard specifications for DECK SLAB
Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.17 MB
Tendernotice_2.pdf
PDF • 0.60 MB
BOQ_755103.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid