Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹2.6 LAdmitted-Finance | -1.25% | ₹2.6 L | L1 | Admitted-Finance |
| 2 | L2₹2.6 LAdmitted-Finance | -0.97% | ₹2.6 L | L2 | Admitted-Finance |
| 3 | L3₹2.6 LAdmitted-Finance | -0.95% | ₹2.6 L | L3 | Admitted-Finance |
| 4 | Not Admitted-Fee/PreQual/Technical | - | - | - | Not Admitted-Fee/PreQual/Technical Others-WITHDRAWAL FOR FAMILY PROBLEM |
Tender Value
₹2.7 L
EMD Value
₹5,400
Closing Date
14 Aug 2026, 11:30 amClosed
THE PRADHAN DALGAON GRAM PANCHAYAT
THE OFFICE OF PRADHAN DALGAON GRAM PANCHAYAT
CONSTRUCTION OF CC ROAD FROM THE HOUSE OF BISHNU MINJ TO ICDS CENTRE AT DALGAON TG 42 UNDER DALGAON GRAM PANCHAYAT (2025-2026) ACTIVITY ID 109386214
2026_ZPHD_1036235_2
09/DLGP/E-TENDER/2025-26
Open Tender
CIVIL WORKS
Percentage
30 days
DALGAON TG
PLEASE REFERS TENDER DOCUMENTS
5 documents required · 5 mandatory
₹1,000
Yes
THE PRADHAN DALGAON GRAM PANCHAYAT
₹5,400
Yes
2 Sept 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
14 Aug 2026
6 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of Sub Base using Local Materials, spreading in uniform layers with Motor grader on prepared surface, including screening the metal as necessary, mixing by mix in place method with Rotavator at OMC, and compacting with vibratory roller to achieve the desired density, lighting, guarding and barricading including cost and carriage of all materials and making necessary earthen bundh of one metre wide on each side to protect the edges complete as per Clause 401 of Specifications for Road & Bridge Works of MoRT&H (5th Revision (iv) For Construction of Sub Base by compacting river bed materials | 1 | Cum | 804.16 | ₹803.36 |
| 2 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches | - | Sqm | 24 | - |
| 3 | (II) Cement concrete with 30 mm down graded shingles excluding shuttering In ground floor 1:3:6 proportion | 1 | Cum | 3,393 | ₹3,389.61 |
| 4 | Ordinary Cement concrete (1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes (b) River stone chips | 1 | Cum | 4,006 | ₹4,005.96 |
| 5 | Hire and labour charges for shuttering with centering and necessary staging upto 4 m using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams and columns, lintels curved or straight including fitting, fixing and striking out after completion of works (upto roof of ground floor) (When the height of a particular floor is more than 4 m the equivalent floor height shall be taken as 4 m and extra for works beyond the initial 4 m ht. shall be allowed under 12 (e) for every 4 m or part thereof)
(a) 25 mm to 30 mm thick wooden shuttering as per decision & direction of Engineer-In-Charge | - | Sqm | 205 | - |
| 6 | Display Board | - | nos | 2,230 | - |
| 7 | Add GST @ 18% | - | LS | 40,047.85 | - |
| 8 | Add LWC @ 1% | - | LS | 2,625.36 | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.61 MB
BOQ_2546097.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].