| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹9.4 L+₹1.8 L (24.0%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | Rejected-Technical | - | Rejected-Technical Non Responsive Due to not having Required experience for work of Construction and commissioning of bore/tube well of minimum dia 150mm not fulfill as per tender document item no 4.4.2 and as reported by EE PHED Division Bagidora letter no 2571 date 2 |
Tender Value
₹1.5 Cr
EMD Value
₹3 L
Closing Date
21 Mar 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE PHED BANSWARA
SE PHED BANSWARA
Drilling and Commissioning of Tube well including supply and installation of energy efficient submersible pump sets, panels cables and other allied works and 5 year O M period 2 years defect liability period under District Banswara
2026_PHCJA_544932_1
NIT28/2025-26
Open Tender
Civil Works - Water Works
Percentage
SE PHED BANSWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,000
EE PHED
₹3 L
Yes
8 Apr 2026
10 Mar 2026
23 Mar 2026
10 Mar 2026
21 Mar 2026
10 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Construction of tube well after completion of drilling by rotary /percussion method & up to 100 mtr. depth in all type of rocks by DTH system as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work shall be deemed completed only after obtaining sand free water. The bore well should have a throughout nominal size bore beyond casing pipe. | |||||
| 2 | Nominal bore 200 mm dia. | 1 | mtr | 1,263 | ₹1,263 |
| 3 | Add 15% extra on above item (Item No 2.3.1 to 2.3.3) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | mtr | 189.45 | ₹189.45 |
| 4 | Add 30% extra on above item (Item No 2.3.1 to 2.3.3) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr . | 1 | mtr | 378.9 | ₹378.9 |
| 5 | Add 15% extra on above item (Item No 2.3.1 to 2.3.3) for drilling, where strata is collapsible and lowering of casing pipe is required . The work includes lowering of casing pipe, but excluding the cost of casing pipe. The rate shall be applicable for stretch of collapsible strata only. | 1 | mtr | 189.45 | ₹189.45 |
| 6Construction of Tube Well up to 100 mtr. depth in all type of rocks by DTH system & over burden to accommodate casing pipe of following sizes in all types of soils & over burden including lowering of casing pipes, (if required) excluding cost of casing pipes, as per IS:2800 Part 1: 1991 and IS:2800 Part II: 1979 (both amended up to date) and technical specifications. The work would be completed after obtaining sand free water. The tube well should have a through out bore as per nominal dia of casing pipe. | |||||
| 7 | Nominal bore 200 mm dia. | 1 | mtr | 1,089 | ₹1,089 |
| 8 | Add 15% extra on above item (Item No 2.4.1 to 2.4.2) for drilling depth beyond 100 mtr and up to 200 mtr from ground level, rate shall be applicable for only extra depth beyond 100 mtr and up to 200 mtr. | 1 | mtr | 163.35 | ₹163.35 |
| 9 | Add 30% extra on above item (Item No 2.4.1 to 2.4.2) for drilling depth beyond 200 mtr and from ground level, rate shall be applicable for only extra depth beyond 200 mtr . | 1 | mtr | 326.7 | ₹326.7 |
| 10 | Add 15% extra on above item (Item No 2.4.1 to 2.4.4) for drilling, where strata is collapsible and lowering of casing pipe is required . The work includes lowering of casing pipe, but excluding the cost of casing pipe. The rate shall be applicable for stretch of collapsible strata only. | 1 | mtr | 163.35 | ₹163.35 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.00 MB
BOQ_972051.xls
BOQ • 0.35 MB
TD28NEW.pdf
Tender Documents • 5.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .