Loading…
Loading…
Tender Value
₹85 L
EMD Value
₹6 L
Closing Date
30 Sept 2026, 12:00 pm
Superintending Engineer
Office of the Superintending Engineer Gorakhpur Circle PWD Gorakhpur
Construction of Minor bridge of 3x5x5 m span, approach road and protective work on Chafi Tola link road under Belwa Kaji Lot No 4 of 5
2026_CEGKP_1186798_4
7030/33Com-Gkp Circle/2026 Dated 08-09-2026
Open Tender
Civil Works
Percentage
90 days
Mahrajganj
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹6 L
19 Sept 2026
19 Sept 2026
30 Sept 2026
19 Sept 2026
30 Sept 2026
19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of embankment and Solder with material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2. as per Technical Specification Clause 301.5 & MORD SR N0-3.4 (Including labour cess but GST will be paid extra as applicable) (Cartage Earth) For main approach. | 900 | cum. | 158 | ₹1,42,200 |
| 2 | CTSB- Providing, Laying and spreading Material on a prepared sub grade, adding cement (OPC) @ 2% by weight to the spread material, manully, mixing in place with rotavator and compaction with the road roller at OMC to achive the desired unconfined compressive strength and to from a layar sub-base. (Including labour cess but GST will be paid extra as applicable) | 26 | cum. | 4,787 | ₹1,24,462 |
| 3 | CTB- Providing, Laying and spreading Material on a prepared su-base, adding cement (OPC) @ 4% by weight to the spread material, manully, mixing in place with rotavator and compaction with the road roller at OMC to achive the desired unconfined compressive strength and to from a layar base. (Including labour cess but GST will be paid extra as applicable) | 25 | cum. | 5,034 | ₹1,25,850 |
| 4 | Tack Coat- Providing and applying tack coat with bitumen VG- 10 grade using pressure distributor at the rate of 0.35 kg per sqm on the prepared bituminous/ granular surface cleaned with mechanical broom. As per T.S.C. 503 & MORD SR N0-5.2(IV). (Including labour cess & Bitumne but GST will be paid extra as applicable) | 250 | Sqm | 27 | ₹6,750 |
| 5 | Premix Carpet- Providing, laying and rolling of open - graded premix surfacing of 20 mm thickness composed of 13.2 mm and 11.2 mm aggregates (Dala quarry) either using VG-10 grade bitumen to required line grade and level to serve as wearing coarse on a previously prepared base by manual means including mixing in a sutabule mixol laying and rolling with a smooth wheeled roller 8-10 tonne capacity, finished to required level and grades. as per T.S.C. 508. & MORD SR N0-5.9 (Including labour cess & Bitumne but GST will be paid extra as applicable) | - | Sqm | 264 | - |
| 6 | Seal Coat type C- Providing and laying seal coat by manual means with VG- 10 grade Bitumen sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per T.S.C. 510 & MORD SR N0-5.12 (Including labour cess & Bitumne but GST will be paid extra as applicable) | - | Sqm | 95 | - |
| 7 | Providing and laying RCC Hume Pipe NP-3 Including collars/spigot and socket type joint confirming to BIS specification as per IS 458:2003 for 1000 mm Dia Hume pipe. (Including labour cess but GST will be paid extra as applicable) For Diversion. | 15 | RM | 2,434 | ₹36,510 |
| 8 | Dismantling brick work or stone work in lime or cement mortar and including stacking of material as directed by the Engineer-in-charge within a distance of 60m. (200 ft) As per S.I. No. 692 (Including labour cess but GST will be paid extra as applicable) | 190 | cum. | 376 | ₹71,440 |
| 9 | Dismantling Reinforced cement concrete or reinforced brick work, including stacking of dismantled materials as directed by the Engineer-in-charge within a distance of 60 M. asper SI. NO. 694. (Including labour cess but GST will be paid extra as applicable) | 23 | cum. | 803 | ₹18,469 |
| 10 | Laying brick soling on prepared sub-grade with brick on end edging according to lines, graded and cross section shown on the grawing filling joints with sand and earth, spreading 25 mm thick layer of earth over brick soling, watering and rolling the same with three wheeled road roller 80-100 kn As per 412 of MORD-412. (Including labour cess but GST will be paid extra as applicable) | 130 | Sqm | 530 | ₹68,900 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.86 MB
Tendernotice_2.pdf
PDF • 0.61 MB
T27030.pdf
Tender Documents • 0.66 MB
BOQ_2234067.xls
BOQ • 0.36 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .