| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.6 LAccepted-AOC | 1 | Accepted-AOC AOC |
Tender Value
₹3 L
EMD Value
₹3,000
Closing Date
11 Mar 2025, 3:00 pmClosed
Executive Engineer
Executive Engineer / Distribution / Batlagundu
Improvement Estimate for provision of New Distribution Transformer in AYPM East subdivision
2025_EB_528359_1
EEBTLDGLTSO9/24-25
Open Limited
Electrical and Maintenance Works
Works
180 days
Batlagundu
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹3,000
Yes
8 Apr 2025
27 Feb 2025
12 Mar 2025
27 Feb 2025
11 Mar 2025
27 Feb 2025
Amount
Labour charges for
Route surveying and peg marking of HT/LT lines
Loading and un loading of of 9.14 Mtr poles / 9 Mtr PSC
Transport of conductor from road side to workspot upto 1KM stringing and sagging up to 7/3.15 mm ACSR including PVC Cable up to 25Sqmm of conductor including binding of pin and proper tightening
Transport of 9.0 Mtr PSC, 9.14 Mtr & and above poles including R.S Joist and Rail poles up to 8 KM
Transport of 8.0 / 9.0m / 9.14 Mtr PSC Poles Above Additional 1.0 km ( 9 to 42 = 33 KM ) ( I Km = 50rs )
Excavation of pits in ordinary soil 9.14 Mtr Poles /9.0 Mtr PSC Poles/ All Metal poles(1.25x06x1.83M)
Excavation of pits in ordinary soil for Stay pit
Erection works( including refilling of excavation sand) 9.14 Mtr Poles
Erection of stay set complete ( including refilling of excavation of sand)
Fixing of LT Sph "X" Arm/HT TI Fitting/ LT TI Fitting
Fixing of 4' - 6" "V" "X" Arm
Fixing of tapping channel / Guarding "X" Arm
Fixing of 22 KV Pin Insulator/ PT insulator
Fixing of 22 KV Disc
Earthing of Pole including buring ,looping and binding
Mass concerting for pole 0.6Mx0.45Mx1.25M ( Cement ,Jelly,sand supplied by contractor)
Sleeve Concret for Stay set 0.3m dia and 0.75 long
Transporting of Line Materials from Stores to workspot ( Up to 10 Km 1000kg for tonne)
Loading and Un loading of Line Materials from Stores to worksite ( for tonne 1000 Kg )
Providing Jumbering of Structure
Fixing of Danger Board (Excluding Paint)
Colour washing of RCC/ PSC 9.0/8.0mtr Pole
Providing Holes of all size Flat/Angles/Channels
Clearing of branches of trees
Welding
Manufacturing of clamps & Altering of clamps
Transport of Distribution transformer by using private vehicle (all capacities) up to 75 Kms
Painting of all clamp , other materials and painting of Strucure pole( Excluding Paint)
Erection of Top channel, Bet channel and Belding angle with all Structure clamps
Erection of AB Switch With PT insulators and Assembling of all Materials
Erection of HG Fuse Set
Erection of 22 KV LAS
Erection of LT LAS
Providing HT jumbering of Structure
Providing LT jumbering of Structure
Provision of LT open type and LT Bus Bare arrangement
Erection of Distribution Transformer
Erection of Earth pipes and Structure earthing (complete)including Material cost of Erath druf (Supplied by the contractor)
Transformer Structure pole mass concreting with coping 0.65x0.6x1.85M+0.65x0.6x0.35 coping (INCLUDING , JULLY,SAND ETC)(Cement Supplied by the contractor)
Gas cutting of angle /Nschannel
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .