| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹8.4 LAccepted-Finance 4 13A PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹8.4 L | 1 | Accepted-Finance satisfied |
| 2 | 2₹8.7 LAccepted-Finance 35 238 V O C NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | SALEM | TAMIL NADU | 636402 | ₹8.7 L | 2 | Accepted-Finance satisfied |
| Sl No | Description | Qty | Unit | ANNAI ENTERPRISES L1 | NEW SRI VENKATESWARA ENGINEERING WORKS L2 |
|---|---|---|---|---|---|
| 1.00 | Puncture Attending works and Gasket renewal of LP Heater -2/3/4.
a) Removing of water box and placing it on the repair bay. | 6 | Nos | 18,043 ₹1.1 L | 18,500 ₹1.1 L |
| 2.00 | b) Lifting of tube nest, placing it on the T.G. floor, inspection, cleaning of tube nest, shell and etc. | 6 | Nos | 21,755 ₹1.3 L | 22,400 ₹1.3 L |
| 3.00 | c) Preparation of gaskets for the tube nest, water box inlet and outlet pipe line flanges etc. | 6 | Nos | 4,375 ₹26,250 | 4,500 ₹27,000 |
| 4.00 | d) Providing new gaskets for the tube nest and placing the tube nest inside the shell. | 6 | Nos | 11,627 ₹69,762 | 12,000 ₹72,000 |
| 5.00 | e) Cleaning and checking of drip line Header Nozzle holes, Checking the tube nest for leak if any plugging of all punctured tubes, placing the water box on the tube nest and tightening of main flange, Condensate inlet and outlet flanges after providing new gaskets. | 6 | Nos | 21,755 ₹1.3 L | 22,400 ₹1.3 L |
| 6.00 | Puncture Attending works and Gasket renewal of Gland Cooler - 1/2
a) Removal of Water box, flange bolts and nuts, Condensate inlet and outlet flanges, lifting the water box, placing it on the floor and cleaning of all flange surfaces. | 1 | No | 13,266 ₹13,266 | 14,000 ₹14,000 |
| 7.00 | b) Lifting of tube nest, Placing it on the floor, inspection, cleaning of tube nest and hydraulic testing etc. | 1 | No | 14,503 ₹14,503 | 15,000 ₹15,000 |
| 8.00 | c) Providing new gasket, for the tube nest and placing the tube nest inside the shell. | 1 | No | 6,477 ₹6,477 | 7,000 ₹7,000 |
| 9.00 | d) Placing the water box on the tube nest and tightening the main flange, Condensate inlet and outlet flanges after providing new gasket. | 1 | No | 19,899 ₹19,899 | 20,500 ₹20,500 |
| 10.00 | Overhauling and Hydraulic testing and Re-assembling of Safety valve size 6”/8”/40/64 ATA Removing the safety Relief valve size 6”, 8” / 40, 64 ATA, Disassembling the Safety Relief Valve, cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with new inlet and outlet flange gaskets. | 4 | Nos | 14,332 ₹57,328 | 15,000 ₹60,000 |
Tender Value
Refer Docs
EMD Value
₹9,600
Closing Date
5 Mar 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Unit I to IV Attending Breakdown maintenance works of tube puncture and gasket renewal work in LP Heaters Gland coolers Main Ejectors and attending defects in regenerative system as and when required basis for a period of one year
2026_EB_668064_1
CE / MTPS-I / SE / M-I / TM /OT. 545 / 2025-26
Open Tender
Power/Energy Projects/Products
365 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹9,600
Yes
9 Mar 2026
27 Feb 2026
6 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
Puncture Attending works and Gasket renewal of LP Heater -2/3/4. a) Removing of water box and placing it on the repair bay.
b) Lifting of tube nest, placing it on the T.G. floor, inspection, cleaning of tube nest, shell and etc.
c) Preparation of gaskets for the tube nest, water box inlet and outlet pipe line flanges etc.
d) Providing new gaskets for the tube nest and placing the tube nest inside the shell.
e) Cleaning and checking of drip line Header Nozzle holes, Checking the tube nest for leak if any plugging of all punctured tubes, placing the water box on the tube nest and tightening of main flange, Condensate inlet and outlet flanges after providing new gaskets.
Puncture Attending works and Gasket renewal of Gland Cooler - 1/2 a) Removal of Water box, flange bolts and nuts, Condensate inlet and outlet flanges, lifting the water box, placing it on the floor and cleaning of all flange surfaces.
b) Lifting of tube nest, Placing it on the floor, inspection, cleaning of tube nest and hydraulic testing etc.
c) Providing new gasket, for the tube nest and placing the tube nest inside the shell.
d) Placing the water box on the tube nest and tightening the main flange, Condensate inlet and outlet flanges after providing new gasket.
Overhauling and Hydraulic testing and Re-assembling of Safety valve size 6”/8”/40/64 ATA Removing the safety Relief valve size 6”, 8” / 40, 64 ATA, Disassembling the Safety Relief Valve, cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with new inlet and outlet flange gaskets.
Overhauling Hydraulic test and Re- assembling of Safety valve of size 4”/2.5”/ 300 class. Removing the safety Relief valve Size 4’’, 2.5’’/300 Class from LP Heater, Gland cooler-I & Flange & Stud heating system Disassembling the Safety Relief Valve, cleaning all the parts of the SRV, checking the seating surfaces and Lapping the seat and disc for perfect blue matching. Setting the pressure for rated lifting the SRV with hydraulic pump. Reassembling the SRV with new inlet and outlet flange gaskets.
Inspection and Gasket Renewal of Main Ejector Disconnecting of all the steam pipe lines air lines and dismantling the nozzle box, Ejector shell, tube nest etc., cleaning the tubes, water box, attending the tube puncture, setting and checking the nozzle gap, hydraulic testing of the tubes and assembling the ejector shell, tube nest, nozzle box, providing with new gasket connecting all the related pipe lines and overhauling of exit NRV and flow meter in main ejector as per direction of the Engineer
Champion Make Style – 54 Super Non-Metallic Compressed Asbestos fiber Jointing sheet confirm to IS 2712/1998, Grade W/1, Size 2000 x 1500 x 3mm gasket for main Condensate line valves, Heater drip, Auxiliary Steam Condensate Air and Auxiliary Cooling water line valves.
Champion Make Style – 54 Super Metallic Compressed Asbestos fiber Jointing sheet confirm to IS 2712/1998, Grade W/1, Size 2000 x 1500 x 4mm for CRH (L&R) Flanges & Dummy flanges
Consumables and Tools & Plants for item Sl.No: 1 to 12
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.95 MB
BOQ_802679.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid