Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | H1₹81.5 LAccepted-Finance | ₹81.5 L | H1 | Accepted-Finance Accept |
| 2 | H2₹6.5 Cr+₹5.7 Cr (701.9%)Accepted-Finance | ₹6.5 Cr+₹5.7 Cr (701.9%) | H2 | Accepted-Finance Accept |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non-Responsive |
Tender Value
₹75 L
EMD Value
₹1.5 L
Closing Date
30 Sept 2024, 4:00 pmClosed
Executive Engineer, PWD NH Dn-I, Jaipur
Nirman Bhawan, Jacob Road, Jaipur
CONSULTANCY SERVICES FOR PREPARATION OF DETAILED PROJECT REPORT AND FEASIBILITY REPORT OF BYPASSES AT SAWAIMADHOPUR WITH TUNNEL/ELEVATED AS REQUIRED AND CHHAN, ALLAHAPUR, BEHRAMDA KHURD, 17 MILE ETC. (TENTATIVE LENGTH 18 KM.) ON NH 552 EXTN. IN STA
2024_MoRTH_822782_1
NIT 01/2024-25 EE PWD NH Dn-I, Jaipur
Open Tender
Miscellaneous Works
Item Rate
300 days
Under Jurisdiction of PWD NH Dn.-I
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Yes
Through Bharatkosh Portal Online
₹1.5 L
Yes
Executive Engineer, PWD NH Dn-I, Jaipur
27 Nov 2024
24 Aug 2024
1 Oct 2024
24 Aug 2024
30 Sept 2024
24 Aug 2024
4 Sept 2024
Amount
Item Description
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixing boundary pillars
Land acquisition Team including support staff and logistics/transportation
Sub Total for Local Consultants
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Grand Total including goods and service tax (for all 3 phases)
** Total Cost Net of Goods & Service Tax shall be considered for financial evaluation Note: No escalation will be payable during the services Insurances shall not be allowed separately. These will be incidental to main items. Rates for all items shall be quoted in figures as well as in words.
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/Studies
Land Acquisition Studies
Any other investigations/surveys
Sub Total
Sub-Soil Investigation (Boring) Rate (INR) Quantity Amount (INR) Amount (INR) in Words
a) Boring in all type of soils (otherthan hard rock) (1500 m)
b) Boring in Hard rock (200 m)
Sub Total
Note: * Quantities of borings shall be taken from Financial Proposal Form No. V. For financial evaluation, these quantities and rates quoted by the consultant will be considered. However, Payment shall be made on the actual quantity of boring at rates quoted above by the Consultant, which may be substantially more or less than the estimated quantities.
Description of Work / Item(s)
Amount
Network Survey of the existing Highways as arepository for civil work as per directions from Authority.
GPR Survey for detection of underground utilities
Description of Work / Item(s)
Amount
Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Wherever the proposed alignment follows the existing alignment, the boundary pillars shall be fixed at an interval of 200m on either side of proposed Right of Way. Wherever there is a proposal of realignment of the existing Highway and/or construction of New Bypasses, Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. (lumpsum)
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land RevenueInspector/Officer orequivalent
Ex-Kanoogo/ Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Total
Number of land acquisition teams (ONE ONLY)
Grand total for all Land Acquisition teams (A)
B: Logistic for Land Acquisition Team :
Computer including necessary peripherals
Printers
Vehicles (Bolero or equivalent) with monthly running limit of 4000 km
Total
Number of land acquisition teams (ONE ONLY )
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Note: The Consultant shall provide one Land Acquisition Expert along with allied team and supporting logistic as envisaged in Clause 5.1.5.1 of TOR for each 100 km stretches proposed for DPR preparation or part thereof (For example total length of package is 343 km, there will be four team).
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum Senior Highway Engineer
Bridge / Structural Engineer
Highway cum Pavement Engineer
Material-cum-Geotechnical Engineer / Geologiest
Senior Survey Engineer
Traffic and Safety Expert
Environmental Specialist
Quantity Surveyor / Documentation Expert
Land Acquisition / Forest Clearance Expert
Utility Expert
Tunnel Design Expert
Senior Geophysicist
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultantsshall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The office rent includes electicity and water charges, maintenance, cleaning, repairs, etc
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies Computer
Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report
Inception Report & QAP
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc.
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for landacquisition ( 3 copies each)
LA & Clearances II Report
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
Holtec Consulting Private Limited (BID ID -3095365)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .