Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.0 LAdmitted-Fee/PreQual/Technical/Finance | -21.90% | ₹1.0 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹1.2 L+₹15,408.84 (15.2%)Admitted-Fee/PreQual/Technical/Finance | -10.00% | ₹1.2 L+₹15,408.84 (15.2%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-LESS CDR/APS |
Tender Value
₹1.3 L
EMD Value
₹3,885
Closing Date
4 Aug 2026, 6:00 pmClosed
office of the executive engineer rew ang
office of the executive engineer rew ang
CONSTRUCTION OF TILE LANE FROM HOUSE OF SHAKEEL BHAT TO ONWARDS BLOCK BIJBEHARA
2026_RDPR_318021_30
ENIT79of2026-27
Open Tender
Civil Works
Percentage
30 days
anantnag
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
office of the executive engineer rew ang
₹3,885
6 Aug 2026
28 Jul 2026
5 Aug 2026
28 Jul 2026
4 Aug 2026
28 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0.0 | site clearance by way of removing vegetation muck etc cj | - | labs | - | - |
| 0.0 | p/l of stone solling tightly hand packed inc carriage cj | - | Cum | - | - |
| 0.0 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:4:8) and by using 40 mm crushed aggregates. | 1 | Cum | - | - |
| 0.0 | P/L 60 mm thick factory made cement concrete interlocking paver block of M-30 grade made by block making machine with strong vibratory compaction and approved size and design shape laid in required color and pattern over and 50mm thick compacted bed of coarse sand, filling of joints with coarse sand etc all complete as per direction of engineer incharge | - | sqm | 1 | - |
| 0.0 | P/L cement concrete of specified grade excluding the cost of centering & shuttering using M10 mix. (1:2:4) and by using 20 mm crushed aggregates. | - | cum | 1 | - |
| 0.0 | carriage of materials by M.T | - | - | - | - |
| 0.9 | sand and aggregates 15km lead | - | cum | - | - |
| 0.0 | tiles by mt | - | trip | - | - |
| 0.0 | Provision for signboard & photographs and other unforeseens items (sta) | - | job | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_1046144.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .